PMBOK2008 English Edition下载
weixin_39821526
2019-07-21 07:30:17
PMBOK2008 English Edition
相关下载链接:
//download.csdn.net/download/yhzs1/3538837?utm_source=bbsseo
...全文
29
回复
打赏
收藏
PMBOK2008 English Edition下载
PMBOK2008 English Edition 相关下载链接://download.csdn.net/download/yhzs1/3538837?utm_source=bbsseo
复制链接
扫一扫
分享
转发到动态
举报
写回复
配置赞助广告
用AI写文章
回复
切换为时间正序
请发表友善的回复…
发表回复
打赏红包
PMBO
K2
008
English
Edit
ion
PMBO
K2
008
English
Edit
ion
PMBO
K 2
008
English
Vers
ion
The descript
ion
of the knowledge of the project management profess
ion
by the Project Management Institute (PMI). Explanat
ion
of
PMBO
K. What is
PMBO
K? Descript
ion
The Project Management Body of Knowledge (
PMBO
K) (®) is an internat
ion
ally recognized standard (IEEE, ANSI ) that deals with the applicat
ion
of knowledge, skills, tools, and techniques to meet project requirements. The
PMBO
K Guide defines a Project Life Cycle, 5 Process Groups and 9 Knowledge areas of the project management profess
ion
. A project team operates in 9 knowledge areas through a number of basic processes as summarized below: Integrat
ion
. Develop the Project Charter, Scope Statement and Plan. Direct, Manage, Monitor and Control Project Change. Scope. Planning, Definit
ion
, Work Break-down Structure (WBS) Creat
ion
, Verificat
ion
and Control. Time. Definit
ion
, Sequencing, Resource and Durat
ion
Estimating, Schedule Development and Schedule Control. Cost. Resource Planning, Cost Estimating, Budgeting and Control. Quality. Quality Planning, Quality Assurance and Quality Control. Human Resources. HR Planning, Hiring, Developing and Managing Project Team. Communicat
ion
s. Communicat
ion
s Planning, Informat
ion
Distribut
ion
, Performance Reporting, Managing Stakeholders. Risks. Risk Planning and Identificat
ion
, Risk Analysis (Qualitative and Quantitative), Risk Response (Act
ion
) Planning and Risk Monitoring and Control. Procurement. Acquisit
ion
and Contracting Plan, Sellers Responses and Select
ion
, Contract Administrat
ion
and Contract Closure. For each process, activity, or practice, a descript
ion
of input, tools and technique and output (deliverables) is made. Origin of
PMBO
K. History The Project Management Institute (PMI) was founded in 1969, initially to identify common management practices in projects across industries. The first
edit
ion
of the
PMBO
K was published in 1987. It was the result of workshops initiated in the early 80s by the PMI. In parallel a Code of Ethics was developed. And guidelines for accr
edit
at
ion
of training centers and certificat
ion
of individuals. Later, a second vers
ion
of the
PMBO
K was published (1996 and 2000), based on comments received from the members.
PMBO
K was recognized as a standard by the American Nat
ion
al Standards Institute (ANSI) in 1998, and later by the Institute of Electrical and Electronics Engineers (IEEE). The third vers
ion
of the
PMBO
K Guide (tm) was published in 2004, with major improvements in the structure of the document, addit
ion
s to processes, terms and domains of program and portfolio. Usage of
PMBO
K. Applicat
ion
s All kinds of project, programs and portfolio management. Applicat
ion
areas include: Management programs (General) Departmental projects (Funct
ion
al) Engineering projects (Technical) Industry specific processes Product development (Marketing) Government programs (Public) Development programs (Internat
ion
al organizat
ion
s) Steps in
PMBO
K. Process A Project is accomplished trough the integrat
ion
of the project management processes.
PMBO
K uses a variat
ion
of the Deming Cycle for continuous improvement with a 5 -step lifecycle: Initiating. Main elements: Authorize the project Commit the organizat
ion
to a project or phase Set the overall direct
ion
Define top-level project objectives Secure necessary approvals and resources Validate alignment with overall business objectives Assign project manager Integrat
ion
management Planning. Main elements: Define project scope Refine project objectives Define all required deliverables Create framework for project schedule Provide forum for informat
ion
sharing for team members and stakeholders Define all required activities Sequence all activities Identify required skills and resources Estimate work effort Risk analysis and avoidance Define and estimate all required costs Obtain project funding approval Communicat
ion
plan Executing. Main elements: Coordinate the resources, team development Quality assurance Select and approach subcontractors Distribute informat
ion
Work the plan Monitoring and Controlling. Main elements: Manage team, stakeholders, subcontractors Measuring progress and monitoring performance (overall, scope, schedule, costs, quality) Take corrective act
ion
s if and where needed. Issue resolut
ion
and escalat
ion
Change request management Risk Management (technical, quality, performance, project management, organizat
ion
al, external) Performance reports. Communicat
ion
s Closing. Main elements: Finalize activities Administrative close out (gather, distribute, archive informat
ion
to formalize project complet
ion
, acceptance/signoff, evaluat
ion
, member appraisals, lessons learned) Contract close out (complet
ion
of the project contract including resolut
ion
of open items and final formal acceptance) The Project Manager is responsible for the project objectives to deliver the final product that has been defined, within the constraints of project scope, time, cost and required quality. Strengths of
PMBO
K. Benefits
PMBO
K guide is a framework and de facto standard. It is process-oriented. It states the knowledge needed to manage the life cycle of any Project, Program and Portfolio through their processes. It defines for each process the necessary input, tools, techniques and output (deliverables). It defines a body of knowledge on which any industry can build it specific best practices for its applicat
ion
area. Limitat
ion
s of
PMBO
K. Disadvantages Complex for small projects. Has to be adapted to the applicat
ion
area industry, project size and scope, time and budget and quality constraints. Assumpt
ion
s of
PMBO
K. Condit
ion
s Project management needs a standard that is applicable to any kind of project scope, industry and culture.
PMBO
K 4th
Edit
ion
.
English
.part3.rar
PMBO
K 4th
Edit
ion
.
English
.
PMBO
K 4th
Edit
ion
.
English
.part1.rar
PMBO
K 4th
Edit
ion
.
English
.
PMBO
K 4th
Edit
ion
.
English
.part2.rar
PMBO
K 4th
Edit
ion
.
English
.
下载资源悬赏专区
13,655
社区成员
12,586,965
社区内容
发帖
与我相关
我的任务
下载资源悬赏专区
CSDN 下载资源悬赏专区
复制链接
扫一扫
分享
社区描述
CSDN 下载资源悬赏专区
其他
技术论坛(原bbs)
社区管理员
加入社区
获取链接或二维码
近7日
近30日
至今
加载中
查看更多榜单
社区公告
暂无公告
试试用AI创作助手写篇文章吧
+ 用AI写文章