Teamwork—beta Spring
Deadline
The deadline for this assignment is January 6, 2026, 23:59
1. Assignment Requirements
1.Blog Submissions
The following content is basically arranged in chronological order. Please arrange your time reasonably and do not concentrate multiple tasks into a certain period of time to complete intensively.
- 1 top-of-the-line collection of essays in the Beta stage, including links to all the following content
- 1 Specific requirements for the alpha phase problem summary essay (published before the start of the beta sprint and added to the collection of essays)
- 1 essay on "Preparing for Everything" (published before the start of the beta sprint and added to the collection of essays)
- 1 essay about the team's code standards
- 5 beta sprint essays.(Arrange a sprint until the end of the assignment during this assignment. Ensure that the essays released by the team are not published on the same day).
- 1 user usage survey report
- 1 Beta sprint summary essay
- Project classroom demonstration and defense
- Make defense PPT
During the Alpha sprint, many students experienced "learning by doing", learning a new programming language, learning Git, and learning to build a complete project. However, each group did not have a deep understanding of the meaning of "learning by doing" in software engineering and encountered many problems. Stop for a while, hold a summary meeting, and gain hindsight.
2.Improvements and new features are needed in the next phase.
- Team division of labor needs to be improved (regarding previous deficiencies, team collaboration and division of labor need to be strengthened and improved)
- Tool processes that need improvement (such as version control, testing tools, etc.)
- The planning and arrangement of all blogs, as well as the time planning of the sprint.
- Specific requirements for the sprint essay blog.
2.sprint blogs
The sprint blog is divided into two parts: scrum and PM report
1.SCRUM section
- Description of each member: achievements from yesterday’s stand-up meeting to the present (which task was completed, how much time was spent, and how much time is left), existing problems/difficulties encountered, and arrangements for the stand-up meeting from now to tomorrow. (can be listed in tabular form)
- If the team members' work is development work, they must have code check-in, and provide the Issue content and link/picture corresponding to the check-in record. (If missing, deduct 2 point from the sprint log that day)
- If the work of team members is testing and other work, it must have specific results, such as screenshots, test reports, etc. (If missing, deduct 2 point from the sprint log that day)
- A photo of the SCRUM meeting. The meeting photo should be real, unstaged photo of the daily sprint meeting. Faces can be covered to protect privacy.(If photos are reused, the sprint log will not be scored on that day.)
PM report
- Summarize the expected taskof the entire project (the expected time of all work or the total number of issues), the work that has been completed so far (the time it takes to complete the work or the number of issues that have been completed), and the remaining work (the expected time of the remaining work) or the number of remaining issues)
- Draw a burn-up chart to show the real situation
- Record the changes in the total amount of tasks, reflect how many things you have discovered during your work that you had not thought of before; (you can draw a chart)
- Latest running pictures/gifs/videos of appropriate project procedures/modules (If missing, deduct 2 point from the sprint log that day)
3.Beta Sprint Summary Essay Blog Specific Requirements
- Corresponds to the tasks set before the start of the sprint (functions to be improved and added). Use a table to display the completion status; for items that have not been completed, describe the specific degree of completion.
- In the "Problem Summary Essay in the Alpha Phase" and "Essay on Preparing for Everything" before the start of the sprint, your team set up some improvement plans. How was the completion of these plans?
- Runnable project links, project files, program QR codes, etc. If it is a mobile project such as a WeChat applet or APP, please pay attention to the corresponding online review mechanism, required time and other matters, and be sure to understand and prepare in advance.
- Running pictures, gifs or videos of each function of the project
- Each member’s experience, gains and insights during the sprint phase
- To distribute the contribution of each member, you can use the following markdown
Student ID
Task Description
Contribution
3.Scoring Rules for this Assignment
1.Defense Score
- Defense Score (consistent with previous scoring rules) = Sum of scores from other groups/(total number of groups-1) * 0.25 + Sum of assistant scores/(number of assistants) * 0.35 + Sum of teacher scores/(number of teachers) * 0.40
2.Blog Score(100'):
- (20')Summary of issues in the alpha phase (with the benefit of hindsight)
- (14')Answered questions related to assumptions, goals, and plans; answered questions related to design/implementation, testing/release
- (28')5 beta sprint essays
- (10')user usage survey report
- (12')Beta sprint summary essay
- (10')Project expected plan, degree of completion, improvement plan completion status, project running link and screenshot display, etc.
- (6')Process experience, team members’ division of labor and collaboration
Score for this assignment = Defense score * 60% + Blog score * 40%
Blog Guidelines
1. Submission Rules
- The blog is subject to the submission time of the class assignment page; the files that need to be submitted are subject to the submission time of github;
- Submitted before the deadline, the score will be the actual score;
- If the post is under review after it is published (the post displays 404), you can submit the link to the assignment page before the deadline and wait for the review to pass.
- Reasons for resubmission such as upload failure and network reasons will not be accepted.
- Late Submission: Submitting within two days after the deadline is considered a late submission, and the score is the actual score * 50%; writing but forgetting to submit the assignment and late submissions are penalized equally.
- Missed Deadline: Failing to submit the blog within two days after the deadline is considered a missed assignment, and the score is 0.
- Assignment Plagiarism: When the teaching assistant finds that two blogs have text/images/code that are too similar, both blogs are considered plagiarized, and both receive a score of -100% (note that this is a negative score!).
- Forgery of Submission: Although the assignment blog has not been completed, submitting it to occupy a place is considered a forged submission, and the score is 0.
- Note: For assignments submitted in advance, if you can actively respond to teaching assistant and teacher feedback and make corresponding revisions before the deadline, these improvements will be taken into account in the subsequent grading. Early preparation has many advantages. Please note that editing blog content is not allowed after the deadline.
2.Points to Note
If the class group releases relevant notices, it is also part of the assignment requirements; please check the group notice in time. If you need to fill in related information in the group and fail to complete it before the deadline, deduct 50% of the actual score. If there are any questions about the assignment, please raise them in the class group three days before the deadline. If the assistant makes changes to the assignment requirements, it will be announced in the group; please be sure to check and improve the assignment according to the new requirements. Please respond promptly to the comments from the teacher or assistant and make the corresponding modifications. Even if the assignment is submitted, pay attention to the announcements from the assistant in the class group!
3.Clarifying Doubts
If there are unclear aspects of the assignment or if you don't understand something, you can ask in the QQ or WeChat group.
4.PPT and Practical Demonstrations
During the defense, you should integrate the PPT with practical demonstrations, and strive to allocate the majority of the defense time to the demonstration of examples.
相关推荐
机械三维3D设计图-等离子清洗机.zip
机械三维3D设计图-等离子清洗机.zip
【无人车路径跟踪】基于神经网络的数据驱动迭代学习控制(ILC)算法,用于具有未知模型和重复任务的非线性单输入单输出(SISO)离散时间系统的无人车的路径跟踪(Matlab代码实现)
内容概要:本文提出了一种基于神经网络的数据驱动迭代学习控制(ILC)算法,专门针对具有未知动态模型和重复任务需求的非线性单输入单输出(SISO)离散时间系统,应用于无人车路径跟踪问题,并提供了完整的Matlab代码实现。该方法充分利用神经网络强大的非线性逼近能力和数据驱动特性,结合迭代学习控制在周期性任务中逐次提升控制性能的优势,无需依赖被控对象的精确数学模型,即可实现对期望轨迹的高精度、渐进式跟踪。文中系统阐述了算法的整体架构设计、关键控制律的构建方式、权重更新机制以及在无人车系统中的具体实施流程,展示了其在复杂非线性环境下的有效性和鲁棒性。; 适合人群:具备自动控制理论、机器学习基础知识和Matlab编程能力的研究生、科研人员,以及从事自动驾驶、智能控制、机器人控制等领域的工程技术人员。; 使用场景及目标:①解决无人车、工业机器人等在执行重复性路径任务时的高精度轨迹跟踪问题;②为研究数据驱动控制、迭代学习控制与神经网络的深度融合提供一个完整的仿真案例和技术参考;③辅助研究人员复现先进控制算法,服务于学术论文的验证、课题研究或实际工程项目的技术预研。; 阅读建议:建议读者在学习过程中紧密结合所提供的Matlab代码,深入剖析算法各模块的具体实现逻辑,推荐预先掌握迭代学习控制的基本原理和神经网络的相关知识,并通过Simulink搭建仿真环境,进行不同工况下的实验验证,以深刻理解算法的控制效果、收敛特性及关键参数的调优策略。
机械三维3D设计图-线圈自动包绝缘胶纸机.zip
机械三维3D设计图-线圈自动包绝缘胶纸机.zip
MATLABSimulink模拟及会议论文,关于具备自动温度控制和能耗分析的智能太阳能热水系统。.zip
1.版本:matlab2014a/2019b/2024b 2.附赠案例数据可直接运行。 3.代码特点:参数化编程、参数可方便更改、代码编程思路清晰、注释明细。 4.适用对象:计算机,电子信息工程、数学等专业的大学生课程设计、期末大作业和毕业设计。
英特尔无线网卡AC8265驱动
英特尔无线网卡AC8265驱动