Assignment 3: Requirements Analysis | CodeStrike - Group 5

CodeStrike CodeStrike 墨衍会员 · AI 创作全网分发 墨衍智能分发 通过墨衍一键同步至各平台 可同步平台 CSDN微信公众号微博知乎掘金百家号博客园抖音小红书 你的文章也可以这样分发 墨衍会员 ¥399起/年,写一次发全网 我也要 + 加入社区

CodeStrike - Group 5 - Assignment 3: Requirements Analysis

ItemContent
CourseEE308FZ Software Engineering Class Community
Assignment RequirementsThird assignment -- Requirement Analysis
Team NameCodeStrike (Group 5)
Project NameCampus Competition & Activity Community
Assignment GoalRefine the requirements analysis based on the initial requirements from Assignment 2; specify user scenarios, class diagrams, interface prototypes, functional requirements, and acceptance criteria; and organize the team's division of labor, collaboration methods, and requirements analysis presentation materials.
Project CoordinatorZhaoyan Wang (王昭衍, 832402220)
GitHub Organization26-SoftwareEngineering-CodeStrike
Other ReferencesAssignment 2 Blog, Chapter 8 of 构建之法: Requirements Analysis

Contents

  • 1. Team Division of Labor and Contribution Percentages
  • 1.1 Members and Initial Division of Labor
  • 1.2 Specific Division of Labor for This Assignment
  • 2. Software Requirements Specification
  • 2.1 Documents and Attachments
  • 2.2 Project Background, Purpose, and Scope
  • 2.3 Class Diagrams
  • 2.4 Interface Prototypes
  • 2.5 Core Functions and Business Rules
  • 2.5.1 Accounts, Profiles, and Access Permissions
  • 2.5.2 Team Applications, Capacity, and Member Management
  • 2.5.3 Competition Maintenance, Community Moderation, and In-App Notifications
  • 2.5.4 Private Courses, Plans, and To-Dos
  • 2.5.5 Mapping Functions to Acceptance Cases
  • 2.6 Requirements Revision and Confirmation Records for This Assignment
  • 3. Team Organization and Schedule
  • 3.1 Team Organization
  • 3.2 Overall Project Stages
  • 3.3 Work Plan Between Assignments 3 and 4
  • 4. Team Collaboration
  • 5. Key Issues and Challenges in This Assignment

1. Team Division of Labor and Contribution Percentages

1.1 Members and Initial Division of Labor

The following table describes the team’s overall project responsibilities. Its percentages are planned workload allocations for the whole project. Contributions to Assignment 3 are reported separately in Section 1.2.

Student IDTask DescriptionContribution
832402220Zhaoyan Wang (王昭衍): Project coordinator; Backend Development Group member; Documentation and Presentation Group leader. Coordinates the overall project, documentation, and presentation materials, and participates in backend development and integration.10%
832402221Maoping Wu (吴茂平): Frontend Development Group member; Product Design and Testing Group leader. Responsible for requirements analysis, product prototypes, and functional acceptance, and participates in personal profile page development.10%
832402223Zhengyang Wu (吴正杨): Product Design and Testing Group member. Responsible for requirements, test cases, and acceptance records related to the Competition Hub and competition-specific communities.6%
832402218Quanyan Tan (谈权焰): Frontend Development Group leader; Documentation and Presentation Group member. Coordinates frontend pages and components, develops competition pages, and assists with PPT visuals and presentation materials.10%
832402215Zihan Lin (林子涵): Documentation and Presentation Group member. Organizes the requirements specification, blog, and project documentation, and assists with the README, PPT, and version maintenance.6%
832402216Jianhao Liu (刘鉴浩): Frontend Development Group member. Responsible for team creation, recruitment details, and team application pages, and participates in API integration and frontend self-testing.8%
832402211Guanxin Lai (赖观新): Backend Development Group leader; Engineering Operations and Testing Group member. Responsible for API and data design, team creation and application review logic, and assists with backend deployment and integration.10%
832402212Yu Lei (雷彧): Backend Development Group member. Responsible for user, permission, and skill profile APIs, as well as related API documentation, self-testing, and integration.8%
832402209Haogang Huang (黄浩罡): Engineering Operations and Testing Group leader. Responsible for Git collaboration, environment and deployment workflows, and system and API integration testing.8%
832402208Haochen Huang (黄浩宸): Engineering Operations and Testing Group member. Responsible for test environments, API and workflow testing, and defect, log, and deployment verification records.6%
832402224Zhiqiang Wu (吴誌强): Frontend Development Group member. Responsible for competition-specific community and experience-sharing pages, interaction issue resolution, and scenario test records.6%
832402227Zhaoyuan Zhang (张钊源): Product Design and Testing Group member. Responsible for team formation and skill matching rules, application review and capacity limit test cases, and regression and acceptance records.6%
832401308He Huang (黄和): Backend Development Group member. Responsible for data APIs, data models, and business validation related to competitions, competition-specific communities, and experience resources.6%
Total13 members; responsibilities across groups are included in each person's percentage and are not counted twice.100%

1.2 Specific Division of Labor for This Assignment

This section accounts for the requirements analysis and material preparation work undertaken for Assignment 3, including SRS refinement, class diagrams, interface prototypes, the PPT, and the blog.

Student IDSpecific Tasks for This AssignmentWorkload Percentage for This Assignment
832402220Zhaoyan Wang (王昭衍): Responsible for drafting the blog and SRS.25%
832402218Quanyan Tan (谈权焰): Responsible for reviewing the SRS and blog.25%
832402211Guanxin Lai (赖观新): Responsible for preparing the PPT and giving the presentation.25%
832402221Maoping Wu (吴茂平): Responsible for creating the class diagrams.25%

2. Software Requirements Specification

2.1 Documents and Attachments

MaterialAccess Link
SRS Word document for this assignment: CodeStrike_Group5_SRS.docxCodeStrike_Group5_SRS

The user scenarios, prototypes, and acceptance cases in the SRS describe expected behavior. The deliverables completed for this assignment are requirements analysis materials; actual functionality and test results will be recorded during subsequent development and verification.

2.2 Project Background, Purpose, and Scope

This project primarily serves first- to third-year students at Fuzhou University. It addresses scattered competition information, fragmented teammate recruitment, difficulty retaining and sharing competition preparation experience, and dispersed personal study plans. The requirements are based on team discussions, members' experiences during their first two university years, and informal feedback from junior students. Formal user interviews have not yet been conducted.

The student-facing clients include an H5 web client and a WeChat Mini Program, sharing accounts, business data, and permission rules. A separate web administration portal supports competition and skill maintenance, content moderation, and violation handling. The product uses the "Competition Hub + competition-specific communities" as the entry point for competition exchanges, while also providing an independent personal planner.

The current scope includes three main user workflows:

Competition Team Formation

Discover a competition → view its details and complete a personal profile → apply to a team with published recruitment → captain review → admission and member management. Students who wish to become captains may also create a team directly when eligible and submit recruitment for review.

Community Exchanges

Enter a competition-specific community → submit a post or comment → publish after administrator approval → browse, like, favorite, and view processing results.

Personal Planning

Sign in → manually enter courses, timed plans, or to-dos → view them by day or week → set a finite weekly recurrence and handle individual occurrences independently.

Mandatory Module in the Current ScopeDefined ScopeCorresponding SRS Requirements
Accounts and Personal ProfilesUsername/password sign-in, password recovery through a bound email address, profile completeness checks, and predefined skill tags maintained by administrators.FR-01–FR-03
Competitions and Dedicated CommunitiesCompetition maintenance and student submissions, search by name, and access to official sources; each competition has one dedicated community supporting posts, comments, likes, favorites, and publication review.FR-04–FR-06, FR-14
Team Formation and "My Team"Advisory skill matching, team creation and recruitment, applications and captain review, capacity and deadline limits, member departure and removal, captain transfer, dissolution, and limited personal history.FR-07–FR-12
In-App NotificationsNotifications for applications, decisions, invalidations, membership changes, captain transfers, dissolution, and content moderation results, with read/unread status.FR-13
Web Administration PortalCompetition and skill tag maintenance, pending-content previews, approval and rejection, and removal of violating content.FR-14–FR-15
Personal PlannerManual course entry, timed plans, to-dos, day/week views, finite weekly recurrence, and single-occurrence operations; records are visible only to their owner.FR-16–FR-19

All modules above are within the current delivery scope. A broader campus activity catalog, complex recommendations, WeChat push notifications, personal plan reminders, user banning/unbanning, team task boards, milestones, deliverable files, and internal chat are outside this scope. Experience sharing uses text, images, and external links; uploading arbitrary resource-file attachments is not provided.

img

Figure 1. System Context and Logical Modules. The H5 client, WeChat Mini Program, and administration portal share business services and data. The server enforces permissions and business rules according to roles. Specific frameworks, databases, and deployment methods will be determined during the subsequent design stage.

2.3 Class Diagrams

Figures 2–4 present the conceptual domain models for team formation, community content and moderation, personal scheduling, and in-app notifications. They show the main classes and their relationships. Detailed business rules and access permissions are defined in Section 2.5.

img

Figure 2. Account, Competition, and Team Formation Domain Classes. JoinApplication records five states: Pending, Approved, Rejected, Withdrawn, and Invalidated. ActiveMembership represents current membership separately from application history. A student may have at most one active membership per competition. Each active team has exactly one captain, who counts toward team capacity. Profile-access rules are defined in Section 2.5.1.

img

Figure 3. Community Content, Revisions, Moderation, and Interactions. ContentRevision represents submitted content versions, while ModerationRecord records their review decisions. When an ordinary post or comment is edited, the approved public version remains visible while the revision is under review. Submitting a recruitment revision delists the recruitment until the new version is approved. Detailed rules are defined in Section 2.5.3.

img

Figure 4. Personal Planner and In-App Notification Domain Classes. CourseItem, TimedPlan, and TodoItem specialize ScheduleItem. Bounded weekly recurrence generates occurrences with distinct actual dates. Editing or deleting one occurrence does not affect others, and completion is independent for each to-do occurrence. Planner records are private to their owner, and notifications belong to their recipients.

2.4 Interface Prototypes

Page IDPageCorresponding FigureMain Interactions
P01Competition HubLeft side of Figure 5Search published competitions by name and open their details.
P02Competition Details and Dedicated CommunityRight side of Figure 5View the introduction, eligibility, deadline, team size limit, and official source; browse discussions, recruitment, and experience resources.
P03Recruitment DetailsLeft side of Figure 6View team size and skill indicators; apply when recruitment conditions are met, even without a skill match.
P04My TeamRight side of Figure 6View current members and perform management actions according to the member or captain role; recruitment awaiting revision review remains visible within the team.
P05Captain ReviewLeft side of Figure 7The current captain views the five allowed categories of information for valid Pending applicants to their team and approves or rejects applications.
P06Personal Daily ViewRight side of Figure 7View courses, timed plans, and to-dos together; overlapping entries can still be opened separately.
P07Manual Course EntryLeft side of Figure 8Select the actual starting week, weekday, and start/end periods, with times converted using the school's period configuration.
P08Single-Occurrence Actions for Repeating ItemsRight side of Figure 8Edit or delete only the record on the selected date, or complete a single to-do occurrence independently.
P09In-App Notification CenterLeft side of Figure 9View business messages and read status; historical links recheck current permissions when opened.
P10Personal CenterRight side of Figure 9Manage one's own profile and access personal applications, teams, posts, and favorites.
P11Independent Web Administration PortalFigure 10Maintain competitions and skills; preview specific content revisions and approve, reject, or remove violating content.
P12Wide-Screen H5 Competition HubFigure 11Display competition search and listings in a wide-screen layout, sharing accounts, data, and business rules with the Mini Program.

img

Figure 5. Competition Discovery and Dedicated Community (P01, P02). Visitors may browse published content, while personal actions require sign-in. The registration deadline does not close community discussions. Category filters and keyword prompts in the diagram are interface illustrations; search acceptance for the current scope follows the SRS requirement to search by competition name.

img

Figure 6. Recruitment Details and My Team (P03, P04). Public recruitment does not expose private contact information, and team management is authorized according to the current role. Once a recruitment revision is submitted, the recruitment is removed from public listings while awaiting review of the new revision.

img

Figure 7. Captain Review and Personal Daily View (P05, P06). Before admission, the captain can view only the applicant's name, college, sex, skill tags, and brief written CV. After approval and while membership remains active, the current captain may additionally view that member's contact information. Overlapping entries are allowed in the personal planner.

img

Figure 8. Manual Course Entry and Single-Occurrence Actions (P07, P08). Weekly recurrence has a finite occurrence count, and each occurrence is stored by its actual date. Editing or completing one occurrence does not affect other dates.

img

Figure 9. In-App Notifications and Personal Center (P09, P10). Public content identifies authors by username, and users maintain their own complete profiles. Historical notifications cannot bypass current profile access permissions.

img

Figure 10. Independent Web Administration Portal (P11). Administrators manage competitions, skills, and pending content. Administrator status alone does not grant access to private schedules or arbitrary complete student profiles.

img

Figure 11. Wide-Screen H5 (P12). The layout may adapt to screen size, while accounts, applications, membership, and planner results remain consistent. Maintenance and moderation operations are available only to administrators under FR-15.

img

Figure 12. Personal Profile and Team Creation. The profile form collects the mandatory information defined in Section 2.5.1 and uses the administrator-maintained skill catalog. Team creation specifies the team name, summary, capacity including the captain, and required skills. The creator becomes the team’s captain and first member. Recruitment requires administrator approval before public display and external applications.

img

Figure 13. Team Application and Captain Review. Students may apply without a skill match. For a valid Pending application, only the current captain of the target team may view the applicant’s name, college, sex, skill tags, and brief CV. Approval rechecks the application and membership states, capacity, deadline, and team status. The current captain may additionally view contact information while the applicant is an active member of the team.

img

Figure 14. Application Results and Full-Team Feedback. Joining or creating a team invalidates the student’s other Pending applications in the same competition. When a team reaches capacity, its remaining Pending applications are invalidated. Affected applicants receive notifications explaining the invalidation reason. A full team displays “This team is full.” and accepts no further applications or admissions.

2.5 Core Functions and Business Rules

2.5.1 Accounts, Profiles, and Access Permissions

Students register and sign in with a unique username and password and bind an email address. Password recovery uses a verification code sent to the bound email address. Administrator accounts are provisioned by the team and are not open to public registration. Students are not required to submit student-status documents. Visitors may browse approved competitions, discussions, and recruitment; personal actions require sign-in.

Mandatory profile fields are name, college, major, academic year, sex, at least one predefined skill tag, a brief written CV, and at least one contact method: WeChat ID or QQ ID. MBTI personality type and hobbies are optional. Profile completeness is checked before team creation, application, and posting, with missing fields identified. The private planner is available after sign-in regardless of whether the competition profile is complete.

Skills come from the same predefined catalog maintained by administrators; students cannot create their own tags. Catalog maintenance must preserve existing skill references and readable labels in profiles and recruitment. Public posts, comments, and recruitment use usernames; ordinary students cannot browse arbitrary complete profiles belonging to others. For a valid Pending application, only the current captain of the target team may view the applicant’s name, college, sex, skill tags, and brief written CV. During active membership, the current captain may additionally view the member’s contact information. Rejection, withdrawal, or invalidation ends access granted by the application. Departure, removal, or dissolution ends access granted by membership. Captain transfer updates privileges immediately. Historical applications, former roles, and old notification links do not grant continuing access.

2.5.2 Team Applications, Capacity, and Member Management

The team formation workflow is as follows:

  1. Before the registration deadline, a student with a complete profile and no current team in that competition may create a team by entering its name, summary, capacity, and required skills, and becomes its captain-member. The captain may submit recruitment for administrator review. Before initial approval, the team is visible only in "My Team" and does not accept external applications.

  2. New applications require a complete profile, published recruitment, an enabled recruitment switch, an active team with available capacity, an unexpired registration deadline, and no current membership in the same competition. Students may apply to different teams in that competition simultaneously, but may have at most one Pending application to any one team.

  3. Skill matching follows the rule "at least one required skill overlaps" and is advisory only. Students may apply without a match, and their names are highlighted during review. Sex and MBTI do not influence matching, and matching does not automatically approve or reject applications.

  4. Only the current captain may approve or reject valid Pending applications to their team. Approval rechecks the application and membership states, capacity, deadline, and active-team conditions. Approval creates active membership and invalidates the student’s other Pending applications in the same competition. Creating a team also invalidates the creator’s other Pending applications in that competition. Other competitions are unaffected.

  5. Team capacity includes the captain, cannot exceed the competition limit, and cannot fall below the current member count. When a team reaches capacity, it stops accepting new applications and further admissions. That team’s remaining Pending applications are invalidated, affected applicants are notified, and the message “This team is full.” is displayed.

Application states and their meanings are as follows:

StateChinese MeaningProcessing Result
Pending待审核 (Pending Review)May be approved or rejected by the current captain, or withdrawn by the applicant.
Approved已批准 (Approved)Results in admission; whether the student is still in the team is determined by the membership relationship.
Rejected已拒绝 (Rejected)The captain explicitly rejects the application; no member is added, and the student may reapply when eligible.
Withdrawn已撤回 (Withdrawn)The applicant terminates this application, and the associated applicant-profile access ends.
Invalidated已失效 (Invalidated)Invalidated because of full capacity, the deadline, dissolution, or the applicant joining/creating another team in the same competition; the reason is recorded and notifications are sent. This is distinct from rejection by the captain.

Reapplication creates a new record while preserving historical decisions. Manually closing recruitment blocks only new applications; existing valid applications may still be reviewed when capacity, deadline, and team conditions allow. While a recruitment revision is pending review, existing applications are also reviewed against the currently effective conditions. The registration deadline blocks team creation, new applications, and approvals and invalidates Pending applications, while existing teams and community discussions remain available. Invalidated applications are not automatically restored by an extended deadline or changes in capacity conditions.

Members may leave voluntarily. The captain may remove members, transfer captaincy to a current member, or dissolve the team. Before leaving, the captain must transfer captaincy or dissolve the team. Transfer changes permissions immediately, and the former captain becomes an ordinary member. After leaving or being removed, students may reapply when eligible; historical approval does not represent current membership. Dissolution invalidates Pending applications, sends notifications, and retains only concise personal history. A vacancy or an increased capacity requires the captain to reopen recruitment manually when legally allowed. Concurrent review or team creation must not exceed capacity or violate the rule of one current team per competition.

img

Figure 15. Team Application and Captain Review Workflow. New applications require published and open recruitment and must satisfy the eligibility conditions in Section 2.5.2. Approving an eligible Pending application creates active membership and invalidates the applicant’s other Pending applications in the same competition. Reaching capacity also invalidates the team’s remaining Pending applications and notifies affected users. Existing valid applications may still be approved while recruitment is manually closed or a revision is under review, provided the application, membership, capacity, deadline, and team-state checks pass. Applicant-profile visibility follows Section 2.5.1.

2.5.3 Competition Maintenance, Community Moderation, and In-App Notifications

Each competition must include a name, introduction, category, registration deadline, eligibility requirements, team size limit, and official source link; the cover image is optional. Administrators create and maintain competitions, and students may also submit competitions for publication after approval. Reducing a competition's team size limit must not make any existing active team's configured capacity or actual membership invalid. Deadline changes apply to subsequent operations. Extending a deadline does not automatically restore Invalidated applications or reopen recruitment.

Each competition has one dedicated community. Signed-in students may create posts and comments, like or favorite posts, and undo likes and favorites. Posts support text, images, and external links, with up to nine JPG/PNG images, each no larger than 5 MB. Authors may edit and delete their own posts and comments.

Student-submitted competitions, posts, comments, and recruitment require approval before their first publication. When ordinary posts or comments are edited, the old approved version remains public while the revision is pending. Approval replaces it with the new version, while rejection retains the old version. Submitting a recruitment revision immediately delists the recruitment; the new conditions become effective after approval, while rejection keeps it delisted and permits resubmission. Moderation applies to specific revisions. Before recruitment approval, current membership and competition capacity constraints must also be checked. Deleted content or content removed for violations cannot be republished through an outdated moderation decision.

In-app notifications cover new applications, approvals, rejections, invalidations, membership changes, captain transfers, dissolution, and moderation results. They provide a list and read status and refresh on page entry or when the application returns to the foreground. Notifications and their historical links remain subject to current permissions. WeChat push notifications, instant messaging, and personal planner reminders are not provided in the current scope.

2.5.4 Private Courses, Plans, and To-Dos

The personal planner is independent of competition team formation. Students manually enter courses, timed plans, and to-dos, and also add competition tasks themselves. Courses are entered using the actual starting week, weekday, and start/end periods, with an optional classroom, and are converted to actual times using the school's period configuration. Duplicate course records with the same name, actual date, and start/end time are skipped with feedback, without affecting other records.

Timed plans require start and end times. To-dos require a title, while the description and deadline are optional; a to-do without a deadline still appears on its assigned date. Courses, plans, and to-dos are displayed together in day/week views. Time overlaps are allowed, and overlapping records remain individually accessible.

All three record types may repeat weekly for a specified finite number of occurrences. The starting week counts as the first occurrence, and each occurrence has an independent actual date. Editing or deleting one occurrence, or completing a single to-do occurrence, does not affect other dates. Planner records are visible only to their owner. Screenshot recognition, automatic whole-semester import, odd/even-week patterns, infinite recurrence, automatic scheduling, reminders, and automatic team-task generation are not provided.

2.5.5 Mapping Functions to Acceptance Cases

The SRS contains nine user scenarios, nineteen functional requirements, twelve business rules, six non-functional requirements, and sixty-seven acceptance cases. Subsequent verification will follow the mapping below, with applicable workflows verified separately on the H5 client, Mini Program, and administration portal.

Verification AreaSRS RequirementsAcceptance Cases
Accounts, Personal Profiles, and Skill CatalogFR-01–FR-03AC-01–AC-08
Competition Maintenance, Discovery, and Dedicated CommunitiesFR-04–FR-05AC-09–AC-14
Posts, Interactions, and Content ModerationFR-06, FR-14AC-15–AC-18, AC-46–AC-49
Team Creation, Applications, Captain Review, and Member ManagementFR-07–FR-12AC-19–AC-42
In-App NotificationsFR-13AC-43–AC-45
Independent Administration PortalFR-15AC-50–AC-51
Private Courses, Plans, To-Dos, and Weekly RecurrenceFR-16–FR-19AC-52–AC-61
Cross-Client Consistency, Permissions, Concurrency, Performance, Feedback, and Verification RecordsNFR-01–NFR-06AC-62–AC-67

Non-functional requirements include data consistency across clients, permission checks for both interfaces and direct data requests, concurrent business constraints, and clear feedback. The performance objective is a response time of no more than three seconds per operation in a recorded acceptance environment, with twenty concurrent users performing common read, save, application, and moderation operations. The exact workload composition and measurement method remain to be determined, and no measured performance results have been reported. Actual verification records the version, environment, prepared data, steps, expected and actual results, and evidence. Cases that have not been executed are not marked as passed.

2.6 Requirements Revision and Confirmation Records for This Assignment

Building on the competition discovery, skill matching, and captain review requirements from Assignment 2, this assignment refines the delivery scope, business rules, prototypes, and acceptance descriptions according to the current SRS. "Current Confirmation" in the following table means that the relevant rules have been defined in the requirements document; actual functionality still requires subsequent development and verification.

Related Requirements or SectionsRefinements in This AssignmentCurrent Confirmation
Delivery Scope: SRS §2, §5.9Specify the H5 client, WeChat Mini Program, and independent web administration portal; include community interactions, moderation, notifications, and personal planning in the current scope.The current scope is defined, and all FR-01–FR-19 requirements are mandatory for this delivery.
Accounts and Profiles: FR-01–FR-03, FR-10Specify username/password access, bound-email password recovery, complete profile fields, predefined skills, and the information visible to captains before and after admission.Student-status documents are not required; visitors may browse published content; current captains access permitted information according to valid applications or memberships.
Competitions and Communities: FR-04–FR-06, FR-14Specify administrator maintenance, student submissions, official sources, community interactions, image limits, and publication review.Publication and moderation rules are defined; ordinary content revisions and recruitment revisions use different publication behavior.
Applications and Member Management: FR-07–FR-12, BR-01–BR-11Specify five application states, applications to multiple teams and the one-team-per-competition rule, withdrawal and reapplication, invalidation at full capacity, deadlines, the recruitment switch, captain transfer, and dissolution.Pending applications are invalidated with notifications when capacity is reached; closing recruitment permits continued processing of valid applications; concurrency and recruitment reopening rules are defined.
Notifications and Administration: FR-13–FR-15Specify in-app business messages, read status, administrator permissions, and the independent administration portal.In-app notifications are within the current scope; WeChat push notifications, banning/unbanning, and arbitrary access to private schedules are outside it.
Personal Planner: FR-16–FR-19, BR-12Complete manual course entry, plans, to-dos, day/week views, finite weekly recurrence, and single-occurrence actions.Planner data is private to its owner; overlaps are allowed; competition tasks are added manually; changing one occurrence does not affect other dates.
Class Diagrams, Prototypes, and Acceptance: SRS §3–§5Update Figures 2–4 and 12–15 to reflect the SRS rules for application states, active membership, profile access, capacity handling, moderation, and personal scheduling.The revised figures describe the defined requirements and business rules. The sixty-seven acceptance cases remain planned verification criteria; execution results will be recorded during development and testing.
Implementation Parameters: SRS §3.5Further specify email-code validity and retry limits, semester and period-to-date mappings, content revision retention, and the workload for performance measurement.These implementation parameters await design decisions; the defined functional scope and business rules continue to follow the current SRS.

3. Team Organization and Schedule

3.1 Team Organization

The following table carries over the organizational structure from Assignment 2: 13 members, 5 working groups, and 17 group positions. Members serving in more than one group are counted only once in the headcount. Project coordinator Zhaoyan Wang (王昭衍) separately undertakes overall coordination. The leaders of the five working groups synchronize progress and review results.

Working GroupLeaderOther MembersExisting Responsibilities
Frontend DevelopmentQuanyan Tan (谈权焰)Jianhao Liu (刘鉴浩), Zhiqiang Wu (吴誌强), Maoping Wu (吴茂平)UI/UX, pages and components, interaction logic, and frontend/backend integration.
Backend DevelopmentGuanxin Lai (赖观新)Yu Lei (雷彧), He Huang (黄和), Zhaoyan Wang (王昭衍)Business logic, APIs, data design, and frontend/backend integration.
Product Design and TestingMaoping Wu (吴茂平)Zhengyang Wu (吴正杨), Zhaoyuan Zhang (张钊源)Requirements analysis, product prototypes, test cases, and functional acceptance.
Engineering Operations and TestingHaogang Huang (黄浩罡)Haochen Huang (黄浩宸), Guanxin Lai (赖观新)Environments, deployment, system maintenance, and integration testing.
Documentation and PresentationZhaoyan Wang (王昭衍)Zihan Lin (林子涵), Quanyan Tan (谈权焰)SRS, CSDN blog, README, project documentation, and PPT.

3.2 Overall Project Stages

The project milestones from Assignment 2 are retained: M0 Team Formation and Topic Selection → M1 Requirements Confirmation → M2 Design and Task Breakdown → M3 P0 Core Version → M4 P1 Refinement and Verification → M5 Final Delivery.

Each stage begins after the preceding milestone is completed, with specific dates determined by the course schedule and team progress. The requirements analysis materials for this assignment are prepared in the sequence "requirements review → class diagrams and interface prototypes → SRS integration and review → presentation and submission material preparation," providing a basis for subsequent design and development.

These milestones organize the development sequence, while the team will further specify the functional allocation for each stage. Final delivery will be assessed against the complete mandatory scope of the current SRS, including the H5 client, WeChat Mini Program, independent administration portal, community interactions, moderation, in-app notifications, team formation, and personal planning.

3.3 Work Plan Between Assignments 3 and 4

This stage runs from the end of the Assignment 3 requirements analysis presentation until the next assignment begins. Based on presentation feedback, the team plans to refine the requirements materials, specify the implementation parameters listed in the SRS, and prepare for design and development.

Work ItemResponsible Person or GroupExpected Deliverables
Presentation Feedback and Material Revision: Collect comments from the instructor, teaching assistants, and other groups, then review and revise the SRS, class diagrams, and interface prototypes item by item.Led by the Documentation and Presentation Group, with support from all working groups.Presentation feedback list and revised requirements materials.
User Research and Requirements Coverage Review: Consult junior students about their actual needs for competition information, team formation, experience sharing, and personal planning; compare these needs with the current SRS and record full, partial, and missing coverage, identifying additions or changes requiring review.Led by the Product Design and Testing Group, with support from all working groups.User research records, a requirements coverage comparison, and a list of requirements awaiting review.
Implementation Parameter Refinement: Following SRS §3.5, determine email-code validity and retry limits, semester and period-to-date mappings, content revision retention, and the workload composition and measurement method for twenty-user concurrent performance verification.Led by the Product Design and Testing Group, with support from the Frontend Development, Backend Development, and Engineering Operations and Testing Groups.Defined implementation parameters and a performance measurement plan.
Design Preparation: Review H5, Mini Program, and administration pages and data against the defined rules for application invalidation, contact information access, recruitment revision review, and planner single-occurrence actions; draft database tables and an API list.Frontend and Backend Development Groups, with support from the Product Design and Testing Group.Initial page workflows, data tables, and API list.
Development Preparation and Task Breakdown: Confirm the technical approach, organize development environments and repository structure for the three clients, verify that the base project runs locally, and specify module owners, estimated time, and acceptance cases.The Engineering Operations and Testing Group and Frontend and Backend Development Groups prepare the environments; the project coordinator and working-group leaders coordinate task allocation.Technical approach, a locally runnable base project, module tasks, and a time plan.

These are proposed arrangements for the next stage. Working-group leaders will synchronize progress and review stage deliverables, and the Documentation and Presentation Group will consolidate and archive the materials.

4. Team Collaboration

The team uses a Feishu group for daily communication. Group leaders allocate tasks, and members co-edit documents through WPS collaboration. The leaders of the five working groups synchronize progress and review results. The final documents are planned to be consolidated and uploaded to GitHub.

Collaboration ActivityMethod or Arrangement Used for This Assignment
Task AllocationTasks are allocated by group leaders.
Daily CommunicationFeishu group.
Progress SynchronizationThe leaders of the five working groups are responsible.
Collaborative Document MaintenanceWPS collaboration.
Result ReviewThe leaders of the five working groups are responsible.
Final Document ArchivingDocuments are planned to be consolidated and uploaded to GitHub.

img

Figure 16. Team Collaboration and Archiving Plan. This illustration shows group leaders allocating tasks, members completing materials, WPS document collaboration, the leaders of the five working groups synchronizing progress and reviewing results, and subsequent consolidation and archiving.

5. Key Issues and Challenges in This Assignment

No actual difficulties encountered during this assignment have been recorded so far. The following analysis examines key issues in the current requirements and the handling principles specified in the SRS, providing a basis for subsequent design and verification.

Key Requirements Analysis IssueAnalysis and Handling Principles
Boundary Between Matching and AdmissionSkill matching is advisory only; students without a match may still apply. Sex and MBTI do not influence matching, and the current captain makes the admission decision.
Application History Versus Current MembershipThe five application states must be distinguished from active membership. Joining or creating a team invalidates other Pending applications in the same competition; after leaving, a student may reapply when eligible.
Capacity, Deadlines, and ConcurrencyThe captain counts toward capacity, and capacity and eligibility are rechecked before approval. Full capacity or the deadline invalidates Pending applications with notifications. Concurrent operations must not cause overcapacity or active membership in multiple teams within the same competition.
Profile Permissions Change with RelationshipsDuring Pending review, only the relevant current captain may view the five allowed categories of information. After admission, current members' contact information becomes additionally available. Permissions are adjusted promptly after withdrawal, invalidation, departure, or captain transfer.
Different Handling of Ordinary Content and Recruitment RevisionsThe old approved version of an ordinary post or comment remains public while a revision is pending. Recruitment is first delisted and becomes public again after approval. Deleted content or content removed for violations cannot be republished through an outdated moderation decision.
Private Planning and Weekly RecurrenceA finite number of independent records are generated by actual date. Time overlaps are permitted, and editing or completing one occurrence does not affect other dates. Planner records are visible only to their owner, and competition tasks are added manually.
Consistency Across Clients and Requirements MaterialsThe H5 client and Mini Program share accounts, data, and business rules. The blog, class diagrams, prototypes, functional descriptions, and acceptance criteria use the scope and terminology of the current SRS.

...全文

相关推荐

新型电力系统下PI-LSTM物理信息长短期记忆神经网络的电力变压器状态评估方法(Matlab代码实现)

内容概要:本文提出了一种基于物理信息长短期记忆神经网络(PI-LSTM)的电力变压器状态评估方法,旨在适应新型电力系统对设备状态精准评估的需求。该方法将物理规律作为先验知识融入LSTM网络,通过构建包含变压器热力学、电气特性等物理约束的损失函数,提升模型在数据稀疏或噪声干扰下的泛化能力与解释性。利用Matlab实现了PI-LSTM模型的搭建、训练与验证,通过实际案例对比传统LSTM与PI-LSTM在状态参数预测精度、趋势拟合度及异常检测敏感性方面的表现,证明了所提方法的有效性和优越性,为变压器等关键电力设备的智能运维提供了新的技术路径。; 适合人群:从事电力系统、智能电网、设备状态监测与故障诊断研究的科研人员、工程技术人员及高校研究生。; 使用场景及目标:①应用于新型电力系统中电力变压器的健康状态评估与预测性维护;②为掌握物理信息神经网络(PINN)在电力系统中的融合应用提供Matlab实践范例; 阅读建议:建议读者结合Matlab代码深入理解PI-LSTM的网络结构设计、物理约束项的数学表达与代码实现细节,并尝试在不同工况数据集上复现和测试,以充分掌握其在提高模型物理一致性与预测可靠性方面的核心优势。

然哥爱编程

硕士复现燃料电池供氢系统建模及控制策略Simulink仿真(附带说明PPT+参考文献+复现模型+实物源码)

内容概要:本资源聚焦于燃料电池供氢系统的建模与控制策略研究,通过Simulink仿真平台实现系统动态行为的精确模拟与控制算法的验证。内容涵盖供氢系统的关键部件建模,如氢气供应管路、压力调节阀、储氢罐及燃料电池堆等,并针对系统响应滞后、压力波动等问题,设计并实现了先进的控制策略,例如基于反馈与前馈的复合控制、PID控制或模型预测控制(MPC),以确保氢气供给的稳定性与效率。配套提供的说明PPT详细阐述了建模思路与控制逻辑,参考文献为研究提供了理论支撑,而完整的复现模型与实物源码则极大地方便了学习者进行仿真复现与二次开发。; 适合人群:具备一定自动化、电气工程或能源动力系统背景,正在进行相关课题研究的研究生,以及从事氢能系统开发的工程技术人员。; 使用场景及目标:① 学习并掌握燃料电池供氢系统的工作原理与关键组件的数学建模方法;② 利用Simulink搭建复杂能源系统的仿真模型,并设计、调试与验证先进控制策略;③ 基于提供的完整资源包(PPT、模型、源码)进行科研复现,作为学位论文或学术研究的技术基础。; 阅读建议:学习者应结合说明PPT的理论讲解,逐步操作复现模型,重点关注控制模块的设计逻辑与参数整定过程。建议在理解现有模型的基础上,尝试修改工况参数或优化控制算法,以深化对系统动态特性的认识,从而将本资源作为开展自主创新研究的有效跳板。

小念念_

考虑供电可靠性与算力柔性的数据中心园区源‑储‑荷一体化规划研究(Matlab代码实现)

内容概要:本研究聚焦于数据中心园区的能源系统规划,提出了一种综合考虑供电可靠性和算力柔性的源-储-荷一体化规划方法。该方法通过构建数学模型,将可再生能源发电、储能系统与数据中心的计算负载进行协同优化,旨在提升能源利用效率与系统运行的稳定性。研究引入算力柔性概念,即根据电力供应情况灵活调整计算任务的执行时间和强度,从而实现供需动态平衡。文中采用Matlab进行仿真建模与求解,验证了所提规划方案在降低能耗成本、提高供电可靠性和增强系统灵活性方面的有效性,为绿色、高效的数据中心能源管理提供了新的思路和技术支撑。; 适合人群:具备一定电力系统或能源管理背景,从事数据中心、新能源、智能电网等相关领域研究的研发人员和工程技术人员。; 使用场景及目标:①应用于数据中心园区的能源系统规划设计,优化可再生能源、储能与算力资源的配置;②实现数据中心在保障服务质量的同时,最大化消纳绿电、降低运营成本并提升应对电力波动的韧性。; 阅读建议:读者应结合Matlab代码,深入理解模型构建过程,重点关注目标函数的设计、约束条件的设定以及算力柔性调度策略的实现方式,以便将该方法迁移应用到实际工程项目中。

三伯

墙面裂缝检测7500张YOLO+VOC格式(已增强).zip

数据集格式:VOC格式+YOLO格式 压缩包内含:3个文件夹,分别存储图片、xml、txt文件 JPEGImages文件夹中jpg图片总计:7500 Annotations文件夹中xml文件总计:7500 labels文件夹中txt文件总计:7500 标签种类数:4 标签名称:["crack","horizontal crack","slanted","vertical crack"] 每个标签的框数(注意yolo格式类别顺序不和这个对应,而以labels文件夹classes.txt为准): crack 框数 = 6621 horizontal crack 框数 = 1906 slanted 框数 = 862 vertical crack 框数 = 690 总框数:10079 图片清晰度(分辨率:像素):清晰 图片是否增强:是 标签形状:矩形框,用于目标检测识别 重要说明:暂无 特别声明:本数据集不对训练的模型或者权重文件精度作任何保证,数据集只提供准确且合理标注

不会仰游的河马君

城市盲道及障碍物检测数据集VOC+YOLO格式9705张16类别.md

亲爱的CSDN用户: 首先感谢你点进这个资源页面。我需要提前说明一个重要情况: **本资源原本已设置为“0积分下载”**,即作者希望完全免费共享。但CSDN平台有时会根据文件的下载热度、文件大小、用户权限等因素,**自动将部分资源的积分调整为非0数值**(如1积分、2积分、5积分等)。这是平台系统的自动行为,而非作者本人的设定。 **因此,如果你当前看到该资源的下载所需积分不是0(例如显示为1、2、3……),请谨慎决定是否下载。** 如果你按照非0积分支付并下载后发现资源内容不符合预期、链接失效,或者实际上该资源本应是免费的,作者无法为此承担积分损失或退还操作。**强烈建议:仅在页面显示为0积分时进行下载。** 另外,本资源描述中**并未直接提供具体的下载地址或外部链接**,因为它本身是一个通过CSDN官方上传通道提交的文件/内容包。如果你看到描述中没有外部网盘地址,这是正常的——资源文件应通过CSDN内置的“下载”按钮获取。若因平台积分显示异常导致你支付了积分,请优先联系CSDN客服咨询积分退还政策,作者没有权限修改平台自动设定的积分值。 感谢你的理解与支持。技术分享本应开放,但受限于平台规则,特此提醒如上。祝学习进步!

fl176831
评论
收藏 已收藏
分享
返回顶部