Group 5 - CodeStrike Alpha Sprint Essay 1 - Day 1 - 2 (November 21 - 22, 2026)
CodeStrike Alpha Sprint Essay 1 — Day 1–2 (November 21–22, 2026)
1. Basic Information
| Item | Information |
|---|---|
| Course | EE308 Software Engineering |
| Assignment | Assignment 5 — Alpha Sprint |
| Team | CodeStrike (Group 5) |
| Project | Campus Competition & Activity Community |
| Sprint Period | November 21–28, 2026 |
| Reporting Period | November 21–22, 2026 |
| GitHub Repository | CodeStrike Repository |
| Integration Branch | sprint/alpha |
| Sprint Task Tracking | GitHub Issues |
目录
- CodeStrike Alpha Sprint Essay 1 — Day 1–2 (November 21–22, 2026)
- 1. Basic Information
- 2. Sprint Overview
- 3. Daily Development Progress
- 3.1 Day 1 — November 21: Sprint Baseline and Planning
- 3.2 Day 2 — November 22: Baseline Integration (T1)
- 3.3 Day 2 — Shared Types and HTTP Client (T2)
- 3.4 Day 2 — Authentication and Profile Integration (T3)
- 4. Latest Running Screenshots
- 4.1 Competition Discovery Interface
- 4.2 Student Registration
- 4.3 Profile Management and Successful Save
- 4.4 Session Restoration and Persistent Data
- 5. GitHub Task Tracking and Development Evidence
- 5.1 Completed Tasks
- 5.2 Remaining Tasks
- 6. Sprint Burn-up Chart
- 7. Testing and Quality Assurance
- 7.1 Verification Results
- 7.2 Database Verification
- 7.3 Evidence Repository
- 8. Problems Encountered and Solutions
- 8.1 Unrelated Git Histories
- 8.2 MySQL Version and Test Environment
- 8.3 Environment Configuration Not Applied to the Build
- 8.4 Incorrect Session Clearing
- 9. Plan for the Next Reporting Period
- 10. Sprint Reflection
2. Sprint Overview
The first two days of the Alpha Sprint focused on establishing a unified development baseline and connecting the existing frontend prototype to a functional backend.
Before the sprint, CodeStrike had completed a substantial part of its interaction prototype and developed a FastAPI backend. However, the frontend and backend were maintained on different branches, and most frontend business operations still depended on mock data.
The initial development priorities were therefore:
- Integrate the frontend prototype and backend implementation into a common development branch.
- Establish consistent API contracts and reusable HTTP communication.
- Connect student registration, authentication, profile management, and skill tags to a real MySQL database.
- Preserve the existing prototype and establish reproducible testing and development evidence.
By the end of November 22, the first three tasks, T1–T3, had passed their acceptance checks and had been integrated into sprint/alpha.
3. Daily Development Progress
3.1 Day 1 — November 21: Sprint Baseline and Planning
The published Alpha Sprint plan established nine development tasks, T1–T9, with their priorities, responsibilities, implementation schedule, and acceptance criteria.
The existing codebase provided three important starting points:
main: the previously established project baseline.feature/assignment4-prototype: the student-facing and administration frontend prototype.feature/backend-implementation: the FastAPI backend, database models, migrations, and tests.
The principal challenge was to integrate these existing results without losing newer frontend functionality or project documentation.
November 21 is recorded as the beginning of the sprint scope. The available engineering execution records are concentrated on November 22; therefore, no development task is retrospectively counted as accepted on Day 1.
3.2 Day 2 — November 22: Baseline Integration (T1)
Task: T1 — Baseline Merge
Issue: GitHub Issue #1
The sprint/alpha branch was established to integrate the Assignment 4 frontend prototype with the FastAPI backend.
A direct Git merge was unsuitable because the prototype and backend branches did not share a common ancestor. A conventional merge could have removed existing prototype files and reverted newer frontend changes.
A controlled integration approach was adopted to record the backend branch ancestry and selectively import the necessary backend files.
The integrated codebase retained the student-facing interface, administration frontend, shared contracts, prototype resources, and historical design documents.
The initial verification included:
- TypeScript type checking.
- Student application mock tests.
- H5 and administration frontend builds.
- WeChat Mini Program compilation.
- FastAPI health and OpenAPI checks.
- Existing prototype browser regression tests.
The first backend test run produced 57 passed tests and seven skipped tests. The skipped cases required a compatible MySQL 8.4 environment, which was not yet available during the baseline integration.
This limitation was recorded rather than being reported as a successful MySQL test.
3.3 Day 2 — Shared Types and HTTP Client (T2)
Task: T2 — Shared Types & HTTP Client
Issue: GitHub Issue #2
Pull Request: PR #10
The next step was to replace the frontend's mock-only communication foundation with reusable HTTP infrastructure.
The shared contracts package was expanded to provide common request and transport interfaces, token management abstractions, HTTP error handling, and transport configuration.
The student application uses uni.request, while the administration web application uses fetch. Both share the same transport behavior and backend error conventions.
The implementation supports Bearer token attachment, request timeouts, structured API errors, and environment-based selection between Mock and API modes.
Twelve API DTO schemas used by this stage were validated against the backend OpenAPI specification. Seventeen differences between prototype view models and backend response structures were documented and addressed with explicit adapters.
The implementation preserved the original mock functionality and avoided removing existing frontend data models.
T2 was merged into sprint/alpha through PR #10.
3.4 Day 2 — Authentication and Profile Integration (T3)
Task: T3 — Auth & Profile Integration
Issue: GitHub Issue #3
Pull Request: PR #11
After the HTTP communication layer was established, the student account workflow was connected to the real FastAPI backend.
A separate MySQL 8.4.6 instance was configured on the development machine. It runs on port 3307 and uses an isolated data directory, without altering the pre-existing MySQL installation.
Alembic database migration completed successfully, and the resulting database contained 25 tables.
The student H5 application now supports:
- Account registration with input validation.
- Sign-in and authenticated API requests.
- Session restoration after refreshing the page.
- Sign-out and server-side session invalidation.
- Reading and updating personal profiles.
- Selecting skill tags from the administrator-managed catalog.
- Displaying profile completeness and structured error messages.
The implementation respects the existing permission boundaries. Students may attach available skill tags to their profiles but cannot create new skill catalog entries.
T3 was merged into sprint/alpha through PR #11.
4. Latest Running Screenshots
4.1 Competition Discovery Interface

Figure 1. Competition Discovery Interface Preserved from the Assignment 4 Prototype
The Competition Hub remained available after integrating the frontend and backend branches.
It presents published competition cards, registration status, deadline information, and navigation to other application areas.
This screenshot documents the preserved prototype interface. The competition and team business workflows have not yet been fully connected to the real backend; that work belongs to T4.
4.2 Student Registration

Figure 2. Student Registration Interface
The registration page provides username, password, and confirmation fields with input validation.
The screen also explains the current limitation of email recovery. Since email binding requires a configured mail service, it is not presented as an implemented feature.
4.3 Profile Management and Successful Save

Figure 3. Profile Management with Successful Save Confirmation
The profile interface allows students to maintain basic information, academic details, a brief CV, contact information, and skill tags.
The screenshot shows a successfully saved profile with a complete-profile status. The skill catalog is managed separately, and students select from existing tags.
4.4 Session Restoration and Persistent Data

Figure 4. Profile State Preserved After Page Reload
After refreshing the application, the authenticated session remains available and the previously saved profile information is displayed again.
In addition to the browser verification, database-level checks confirmed the persisted user, profile, and skill association records in MySQL.
The complete H5 account-flow verification passed 24 browser assertions.
5. GitHub Task Tracking and Development Evidence
GitHub Issues were created to track the nine tasks defined in the published Alpha Sprint plan.
Each task has an assigned priority, description, acceptance criteria, and verifiable completion evidence.
5.1 Completed Tasks
| Task | Description | Owner / Check-in Member | Evidence | Status |
|---|---|---|---|---|
| T1 | Baseline Merge | Maoping Wu (吴茂平), Quanyan Tan (谈权焰) | Issue #1, commit 15e3b94 | Closed |
| T2 | Shared Types & HTTP Client | Maoping Wu (吴茂平), Quanyan Tan (谈权焰) | Issue #2, PR #10 | Closed |
| T3 | Auth & Profile Integration | Maoping Wu (吴茂平), Quanyan Tan (谈权焰) | Issue #3, PR #11 | Closed |
The associated implementation commits include:
- T1:
15e3b94— FastAPI backend integration. - T2:
c54bcc6— shared contracts and HTTP transport. - T3:
5900b11— registration and profile integration.
The two feature branches were merged into sprint/alpha through pull requests.
The latest integration commit at the end of the reporting period was:
15059fe60d61272c3fcc69796f06203c17a498c9
5.2 Remaining Tasks
The following tasks remain open:
| Task | Description |
|---|---|
| T4 | Competitions & Teams Integration |
| T5 | Community Posts & Interactions |
| T6 | Admin Web Integration |
| T7 | Notifications & Planner Integration |
| T8 | Testing & QA Automation |
| T9 | MP-Weixin Build Check & Docs |
Their completion will be evaluated against the published acceptance criteria and actual GitHub evidence.
6. Sprint Burn-up Chart

Figure 5. Alpha Sprint Burn-up Chart (November 21–22, 2026)
The chart tracks the cumulative number of accepted tasks against the total planned sprint scope.
The sprint initially contains nine tasks, T1–T9.
| Date | Total Scope | Accepted Tasks |
|---|---|---|
| November 21 | 9 | 0 |
| November 22 | 9 | 3 |
By the end of Day 2, T1, T2, and T3 had been accepted and closed.
The current completion count is therefore 3 out of 9 planned tasks, or approximately 33.3% by task count.
This measure represents accepted tasks rather than story points or actual development effort. The remaining tasks may differ significantly in complexity and workload.
The burn-up chart will be updated during subsequent reporting periods using actual Issue acceptance records.
7. Testing and Quality Assurance
Automated testing was carried out across the shared contracts, student frontend, administration frontend, backend, and database integration layers.
7.1 Verification Results
| Test or Verification | Result |
|---|---|
| TypeScript type checking | PASS |
| Student mock and related unit tests | 66 passed, 0 failed |
| Administration HTTP tests | 8 passed, 0 failed |
| Student account E2E tests | 14 passed, 0 failed |
| Backend pytest on MySQL 8.4.6 | 64 passed, 0 skipped |
| Real H5 account browser verification | 24 assertions passed |
| Student H5 production build | PASS |
| WeChat Mini Program build | PASS |
| Administration web build | PASS |
| Existing Wave 4 and design regressions | PASS |
7.2 Database Verification
The MySQL 8.4.6 instance was used to validate real authentication and data persistence.
The checks covered account creation, profile updates, skill associations, expired and revoked tokens, authorization boundaries, and database integrity.
The seven tests that were skipped during T1 were executed successfully after the MySQL 8.4 environment became available.
The database migration reached Alembic revision 0001, and the schema consistency check reported no pending migration operations.
7.3 Evidence Repository
The test outputs, execution logs, screenshots, and supporting records have been retained in the GitHub repository:
Assignment 5 — Alpha Sprint Evidence
The evidence is organized by baseline integration, T2 HTTP integration, and T3 account integration.
The reported test results are based on executed commands rather than assumed outcomes.
8. Problems Encountered and Solutions
8.1 Unrelated Git Histories
Problem: The frontend prototype and backend implementation had no common Git ancestor. A conventional merge risked deleting existing prototype files and reverting more recent frontend changes.
Solution: The integration recorded the backend ancestry and selectively imported backend files while preserving the current frontend prototype and project documentation.
8.2 MySQL Version and Test Environment
Problem: The local MySQL 8.0 environment was incompatible with the backend test suite's MySQL 8.4 version requirement.
Solution: An isolated MySQL 8.4.6 development instance was configured without replacing the existing database installation. The previously skipped database tests could then be executed.
8.3 Environment Configuration Not Applied to the Build
Problem: The frontend initially read the environment configuration through an indirect reference, preventing the bundler from replacing the values correctly. The application consequently remained in mock mode.
Solution: The environment access was corrected, and a production-bundle verification check was added to prevent recurrence.
8.4 Incorrect Session Clearing
Problem: An unsuccessful sign-in attempt could incorrectly clear an already authenticated session.
Solution: Session invalidation was restricted to authentication failures on requests requiring an existing authenticated session.
These fixes strengthened the integration foundation and provided additional regression scenarios for future development.
9. Plan for the Next Reporting Period
The next reporting period, November 23–24, will focus primarily on T4 — Competitions & Teams Integration.
The planned development work includes competition listing and details, team creation, recruitment management, application submission, and captain approval or rejection.
The objective is to complete the core recruitment-to-admission workflow using real API requests and persistent MySQL data while respecting capacity restrictions and privacy requirements.
Further integration of community functionality, administration operations, notifications, and the personal planner will follow the remaining task schedule.
Testing will continue alongside development, with results and progress recorded through GitHub Issues, Pull Requests, and the evidence directory.
10. Sprint Reflection
The first reporting period established a working integration foundation for CodeStrike.
The project progressed from separate frontend and backend implementations to a unified codebase with shared HTTP communication and a functional MySQL-backed student account workflow.
The verification process also exposed integration risks involving Git history, database compatibility, environment configuration, and session handling. Recording and resolving these issues improved the reliability of the current implementation.
The remaining priority is to extend the verified backend integration to the central competition and team collaboration workflows while preserving the established development standards and test evidence.
Related Links
相关推荐
基于条件风险价值CVaR的微网动态定价与调度策略(Matlab代码实现)
基于条件风险价值CVaR的微网动态定价与调度策略(Matlab代码实现)内容概要:本文提出了一种基于条件风险价值(CVaR)的微网动态定价与调度策略,并通过Matlab代码实现相关算法。研究聚焦于在不确定环境下,如可再生能源出力波动和负荷需求变化的情况下,如何利用CVaR方法量化和控制风险,从而优化微网的经济运行与能源调度。文中建立了包含分布式电源、储能系统及可控负荷在内的微网模型,设计了考虑风险偏好的动态定价机制与优化调度方案,旨在平衡系统运行成本与风险水平。通过仿真验证了该策略在降低期望成本的同时有效控制极端损失的能力。; 适合人群:具备电力系统、优化理论及Matlab编程基础的研究生、科研人员及相关领域工程师。; 使用场景及目标:①应用于含高比例可再生能源的微网能量管理系统中,提升其应对不确定性的能力;②为电力市场环境下的风险量化与决策提供技术支持;③作为教学案例用于讲授风险敏感优化在能源系统中的应用。; 阅读建议:建议读者结合Matlab代码深入理解模型构建与求解过程,重点关注CVaR的建模方式及其在目标函数中的集成方法,同时可尝试调整风险偏好参数以观察对调度结果的影响。
code_20261127.txt
code_20261127.txt
西周BC778年世界历史地图矢量文件SHP格式.zip
本资源为《西周BC778年世界历史地图矢量文件SHP格式》压缩包,文件大小约 24.87 MB,便于集中下载、整理和使用。具体内容请结合压缩包内的实际文件与说明查看。 在当前可读取的目录中,可见属性表(.dbf)、投影说明文件(.prj)、Shapefile 主文件(.shp)、Shapefile 索引(.shx)。建议解压后保持原有目录结构,先浏览文件清单与说明,再选择需要的资料进行加载或整理。 应用方面,可根据实际资料用于学习练习、资料检索、研究整理或项目参考。使用时可先确定所需内容,建立清晰的文件分类,再按项目要求进行筛选、转换与汇总。 使用 Shapefile 数据时,请把实际配套的 .shp、.shx、.dbf 等文件保存在同一目录,并保持同名关联;加载后再检查坐标系与中文字段显示。如需叠加其它数据,请先统一坐标与字段口径。 数据来源、时间范围、坐标系、字段定义、精度和使用条件,请以实际文件及原始说明为准。本介绍不对文件名之外尚未核实的信息作额外承诺。
复现多水面航行器AUV协同路径跟踪、多智能体系统、事件触发通信Matlab仿真
内容概要:本文围绕多水面航行器AUV的协同路径跟踪问题,基于多智能体系统理论,采用事件触发通信机制,利用Matlab进行仿真复现。研究重点在于设计高效的协同控制算法,以实现多个AUV在复杂海洋环境下的精确路径跟踪与协同作业,同时通过事件触发机制降低通信频率,节约能源并提升系统效率。仿真内容涵盖了系统建模、控制策略设计、通信机制优化及多AUV协同行为的动态响应分析,验证了所提方法的有效性与鲁棒性。; 适合人群:具备自动化、控制工程、海洋工程或相关领域背景,熟悉Matlab/Simulink仿真工具,从事多智能体系统、无人系统协同控制研究的研发人员或研究生。; 使用场景及目标:① 掌握多AUV协同路径跟踪的控制算法设计方法;② 学习事件触发通信机制在多智能体系统中的应用;③ 通过Matlab仿真复现顶刊研究成果,提升科研实践能力。; 阅读建议:建议结合多智能体系统控制理论与Matlab编程实践,重点关注仿真模型的构建逻辑与控制参数的整定过程,动手复现代码以深入理解算法细节与系统动态特性。
【工业无线通信】5GHz WiFi6大功率AP基站:支持2400M速率与AI极速漫游的工业级无线传输设备
内容概要:WiFiSupply WFS7000XBAX 是一款工业级大功率机载无线AP基站,支持5GHz全频段(5180-5825MHz)和Wi-Fi 6(802.11ax)标准,提供高达2400Mbps的无线速率和28dBm(640mW)发射功率。产品具备≤1ms通信延迟、≤30ms AI FastRoaming极速漫游、IP54防护等级及-45~85℃宽温工作能力,支持OFDMA、TDMA、长距离优化协议(LD),适用于远距离桥接(最远可达150km)和移动场景下的稳定通信。设备采用MIMO 2T2R架构,配备SMA外置天线接口,支持多种供电方式(PoE/DC/端子),并集成多重看门狗、防浪涌、防静电等工业级设计,保障高可靠性运行。软件方面支持私有安全协议、巨量安全隧道、VLAN、QoS、IPv6、SNMP、API管理及WISE云平台远程运维。; 适合人群:工业自动化、智慧物流、智慧交通等领域中从事无线网络规划、设备集成与系统部署的技术工程师及项目决策人员。; 使用场景及目标:①用于AMR/AGV/RGV、四向穿梭车、堆垛机、无人叉车等移动设备的无线联网与PLC数据传输;②实现车载、船载、火车视频监控的移动回传;③构建室内外无线桥接骨干链路,支持风电监测、无人机遥控、分拣机控制等工业4.0应用;④在复杂电磁环境下提供抗干扰、低延时、高带宽的稳定网络覆盖。; 阅读建议:本规格书适用于产品选型、方案设计与现场部署参考,建议结合实际应用场景重点关注其抗干扰能力、漫游性能、安全机制与供电灵活性,并查阅官方认证报告以验证各项工业指标的真实性。