Fubangbang Alpha Sprint 1 Environment Reproduction and Baseline Verification

ItemDetails
CourseEE308FZ Software Engineering
Assignment requirementsFifth Assignment Alpha Sprint
TeamFubangbang
Sprint periodNovember 21–22, 2026
Sprint objectiveReproduce the existing application, verify core workflows, investigate inconsistencies, and prepare focused improvements for Sprint 2.
Project repositoryRederChen/fubangbang-alpha
ReferencesProject source, existing test scripts, execution logs, runtime screenshots, and the Alpha task plan.

1 Sprint Objective and Starting Point

Fubangbang already had a Vue and TypeScript frontend, a FastAPI backend, and implementations of account access, product publication and search, transactions, and forum functions. Our first Alpha iteration concentrated on establishing what the existing version could reliably do and identifying a manageable next change.

We organized eight work items for this two-day sprint: environment reproduction, existing automated checks, two-account acceptance, issue investigation, burn-up charts, GitHub upload, the contribution record, and preparation of this blog and its supporting materials. All eight are complete in the snapshot reported here. Blog publication is tracked separately from writing and preparing the materials.

The application checks and screenshot capture took place on November 21. November 22 work covered chart preparation, repository upload, contribution recording, and blog preparation. The results below describe these activities; they do not present existing features as newly implemented during this sprint.

2 Work Completed During the Two Days

Sprint itemWork completedResult or evidence
T01Reproduce the local environment and record the source baseline.Frontend startup and backend database connectivity confirmed; 263 original handoff files recorded.
T02Run existing automated checks and record outcomes.Frontend type check and build passed; backend results and browser automation recorded.
T03Verify core workflows using separate seller and buyer accounts.Ten acceptance checks passed; fourteen runtime screenshots captured.
T04Investigate boundary behavior and review code responsibilities.Seventeen API observations and two UI checks documented; two validation inconsistencies and one maintenance item recorded.
T05Prepare progress charts and their datasets.The eight-item Sprint 1 chart and separate twelve-task Alpha chart are included below.
T06Upload the project baseline and sprint evidence to GitHub.Initial import published as commit 504e802.
T07Complete the group contribution record.Frontend and Backend 60%; UI and Presentation 25%; Testing and Execution Support 15%.
T08Write the Sprint 1 blog and prepare its supporting materials.This article, selected runtime images, progress charts, and evidence references prepared.

The Sprint 1 record index provides the detailed verification records.

2.1 Environment and Source Baseline

The existing application was started on Windows using Node.js v24.19.0, npm 11.17.0, and Python 3.13.12. The local checks used SQLite. The frontend returned HTTP 200, and the backend health endpoint confirmed database connectivity.

The frontend and backend have different application responsibilities despite sharing a project directory. Frontend requests are organized under src/api/, while the backend separates routes, schemas, services, models, and database access. The main maintenance concern identified in this sprint is the concentration of several publishing responsibilities in one Vue view.

A manifest recorded 263 original handoff files. Their hashes remained unchanged during the verification work. The environment record documents setup and startup evidence.

2.2 Existing Automated Checks

CheckRecorded result
Frontend type checkPassed
Frontend buildPassed
Existing backend tests57 passed, 3 skipped, 0 failed
Existing browser automationCompleted successfully

The three skipped backend cases require PostgreSQL and remain unverified in this SQLite run. One test-client deprecation warning was recorded. Complete standalone logs for the original frontend type check and build were not retained; their outcomes are recorded in the execution notes.

These results establish a useful baseline for the scenarios exercised. The focused boundary investigation described later found behavior not covered by the normal-path checks. Detailed results are available in the automated check record, backend execution log, and JUnit report.

3 Two Account Acceptance and Running Images

We exercised the application with separate seller and buyer sessions using an isolated SQLite database and upload directory. Browser actions were automated with tool assistance. The screenshots were captured from the running application and retain its Chinese interface.

CheckObserved outcome
Registration and loginBoth accounts registered and displayed the correct identity in separate sessions.
Product publicationThe backend saved the test product, uploaded cover, and initial price of CNY 25.50.
Persistence after a new loginThe product remained available after refresh, logout, and login.
Buyer searchSearch returned the seller's test product.
Seller price updateThe buyer saw the updated price of CNY 19.80 after refresh.
Ownership permissionAn API-assisted edit request authenticated as the buyer returned HTTP 403 and did not change the product.
Seller contactThe contact dialog displayed the seller's test contact details.
Transaction progressionThe request moved from pending to accepted to completed; the product became reserved and then sold.
Forum persistenceA published post remained available after refresh and could be opened by the other account.
Incorrect passwordLogin showed an error without creating an authenticated session.

img

Figure 1. Product retrieval after refresh and a new login.

img

Figure 2. The seller's price change was visible to the buyer.

img

Figure 3. The product was marked sold and a new booking was disabled.

img

Figure 4. Forum content retrieved after refresh.

Ten focused checks passed, with fourteen acceptance screenshots. Two additional screenshots were captured during the title-boundary investigation. The acceptance record, structured results, and complete sixteen-image gallery provide the full evidence.

The transaction result describes application state in the local test scenario. It does not represent a real payment or establish production deployment, backup recovery, or behavior outside the checked scenarios.

4 Problems Found and Planned Treatment

Focused investigation produced seventeen API observations and two UI checks. These observations reproduce existing behavior; they are not seventeen successful checks of the proposed fix.

Local IDFindingEvidence and impactStatus and next action
S1-01Product title limits differ between the UI and API.The UI retained at most 30 typed ASCII characters, while both create and update APIs saved 31-character and 120-character titles.Open, P1. Confirm and implement one title rule in Sprint 2.
S1-02Product updates do not apply equivalent blank validation and trimming.Creation rejected a whitespace-only title, but updating saved it. Creation trimmed surrounding spaces, while updating retained them.Open, P1. Share normalization and validation between creation and editing.
S1-03Several publishing responsibilities share one Vue view.Uploading, drafts, edit loading, validation, payload construction, and submission are handled in the publishing view.Maintenance backlog, P2. Extract one responsibility in Sprint 3.

img

Figure 5. The browser input limit used in the UI/API comparison.

The publishing view has 1,130 total lines, including a substantial CSS section. File length alone does not prove a functional defect. The proposed improvement concerns the responsibilities handled in its script and will be kept separate from the title-validation fix.

The local IDs above are labels in our issue record, not existing GitHub Issue numbers. Before implementing Sprint 2 changes, we will create the corresponding GitHub Issues and link the development and verification records. See the issue review and boundary-check evidence.

5 Burn Up Charts and Scope

The two charts below use different task registers. Sprint 1 has eight work items, including reporting and repository work. The full Alpha plan has twelve engineering work packages, A01–A12. Their counts must be read separately.

5.1 Sprint 1 Work List Eight of Eight Complete

img

Figure 6. All eight Sprint 1 work items are complete, including preparation of this article and its supporting materials. External publication is tracked separately.

The November 21 point represents the start of the sprint, before work on these eight items, so its count is zero. Four verification work packages were completed later on November 21. Chart preparation, repository upload, the contribution record, and the completed blog materials bring the count to eight at the November 22 report snapshot. The chart connects the start reference and report snapshot; it does not show a separate end-of-November-21 point. The eight-item list was organized from the recorded work and reporting plan; it is not a record of a formally frozen pre-sprint scope.

5.2 Alpha Engineering Plan Four of Twelve Complete

img

Figure 7. A01–A04 are complete. A05–A12 remain scheduled for Sprints 2–4.

Alpha task rangeWorkStatus at the end of Sprint 1
A01–A04Environment, existing checks, core-flow acceptance, and issue investigationComplete
A05–A07Shared title contract, implementation, and regression verificationPlanned for Sprint 2
A08–A09One publishing-view extraction and affected-flow verificationPlanned for Sprint 3
A10–A12Final regression, delivery checks, and consolidated evidencePlanned for Sprint 4

The Alpha chart maps the twelve-task plan to the dated verification evidence. It starts at zero at the defined beginning of this Alpha task register and ends at four in the November 22 snapshot. A01–A04 were completed later on November 21; the chart's first point is a start reference, not that day's closing result. Documentation and repository upload do not add engineering-task completions. Each task has equal weight; neither chart measures hours, effort, or the percentage of all product features implemented. No future completion points are plotted.

6 GitHub Record and Group Contributions

The project baseline and initial evidence were uploaded to the team repository. Commit 504e802, chore: import project baseline and sprint 1 records, records this import. It includes the original source snapshot, detailed verification documents, test evidence, and runtime images.

This was a baseline-import and verification iteration. The application logic was not modified to produce the recorded checks, and the title defects have not yet been fixed. Later implementation commits will identify the actual changes and corresponding Issues.

The following team-reported contribution allocation applies only to Sprint 1.

GroupMembersMain contributionsShare
Frontend and BackendChen Jiayuan, Chen Haoyang, Chen Junjie, Zhu Chaoyang, Zhou Qican, Zhu MingqianEnvironment reproduction, code and API behavior review, tool-assisted core-flow verification, issue analysis, source and document organization, and repository setup and upload.60%
UI and PresentationYe Jiahui, Zhang Sufang, Chen Zhijun, Wu SifanPreparation and review of burn-up chart presentation, including layout, labels, legend, task-data consistency, and placement in the blog materials.25%
Testing and Execution SupportChen Mohan, Chen Wei, Zeng Wenhan, Zheng BoweiOrganization of test results, browser acceptance records, screenshots, boundary observations, evidence references, and the testing summary.15%
Total14 members100%

Chen Jiayuan led the main execution and integration work across the groups. The testing support entries concern evidence organization and review; browser acceptance actions were automated.

7 Sprint Review and Next Iteration

Sprint 1 established a runnable local baseline, documented successful core-flow checks, and exposed two title-validation inconsistencies. A normal publishing flow can succeed while boundary inputs still reveal different rules across entry points. This finding gives Sprint 2 a specific correction target.

We also separated maintenance work from functional fixes. The title behavior will be addressed first, while the publishing-view extraction remains a later, limited task. This keeps the next iteration small enough to implement and verify thoroughly.

Sprint 2, November 23–24, will:

  1. Confirm the title contract, including length counting, trimming, blank values, and omitted-field behavior.
  2. Apply consistent validation to creation and editing.
  3. Add regression cases for valid boundaries, rejected inputs, surrounding spaces, Unicode counting, and a price-only update that preserves the title.
  4. Repeat the affected browser flow and relevant existing checks, then record the actual results with Issue and commit links.

The proposed limit is 1–30 UTF-16 units after trimming, matching the existing browser behavior, subject to confirmation before implementation. Existing over-limit titles require an explicit handling decision. The Sprint 2 task plan contains the acceptance checklist.

...全文

相关推荐

复现基于量化状态反馈+非线性自适应神经控制的反馈系统(不确定MIMO)仿真(Matlab代码实现)

内容概要:本文介绍了一种结合量化状态反馈与非线性自适应神经控制的先进控制策略,用于解决不确定多输入多输出(MIMO)反馈系统的建模与控制问题,并基于Matlab平台实现了完整仿真。该方法利用神经网络逼近系统内部不确定性,融合量化反馈机制以增强系统鲁棒性与自适应能力,有效应对模型不精确、外部扰动等复杂工况,适用于高精度控制场景。文章强调科研需兼具严谨逻辑与创新思维,提供从理论推导到代码实现的完整学习路径,并配套丰富的仿真资源与技术文档,帮助读者系统掌握先进控制算法的设计与应用。; 适合人群:具备自动控制理论基础、神经网络初步知识及Matlab编程能力,从事控制工程、系统科学、机器人、自动化或相关领域的研究生、科研人员及工程技术人员。; 使用场景及目标:①研究不确定MIMO系统的稳定性与控制性能优化;②掌握自适应神经控制与量化反馈的集成设计方法;③应用于机器人控制、飞行器导航、工业过程控制等高精度动态系统控制场景; 阅读建议:建议结合提供的网盘资料(含代码与文档)与公众号“荔枝科研社”资源,按照目录顺序系统学习,注重理论分析与仿真实践相结合,通过动手复现算法深入理解其动态响应特性、收敛机制与鲁棒性能表现。

欢多天天写代码

西周BC996年世界历史地图矢量文件SHP格式.zip

本资源为《西周BC996年世界历史地图矢量文件SHP格式》压缩包,文件大小约 28.70 MB,便于集中下载、整理和使用。具体内容请结合压缩包内的实际文件与说明查看。 在当前可读取的目录中,可见属性表(.dbf)、投影说明文件(.prj)、Shapefile 主文件(.shp)、Shapefile 索引(.shx)。建议解压后保持原有目录结构,先浏览文件清单与说明,再选择需要的资料进行加载或整理。 应用方面,可根据实际资料用于学习练习、资料检索、研究整理或项目参考。使用时可先确定所需内容,建立清晰的文件分类,再按项目要求进行筛选、转换与汇总。 使用 Shapefile 数据时,请把实际配套的 .shp、.shx、.dbf 等文件保存在同一目录,并保持同名关联;加载后再检查坐标系与中文字段显示。如需叠加其它数据,请先统一坐标与字段口径。 数据来源、时间范围、坐标系、字段定义、精度和使用条件,请以实际文件及原始说明为准。本介绍不对文件名之外尚未核实的信息作额外承诺。

白水先森

智慧工业园区AI大模型数字化平台建设方案.docx

智慧工业园区AI大模型数字化平台建设方案.docx

公众号:优享智库

基于 SpringBoot、Vue、Mybatis、RabbitMq、Mysql、Redis 等开发的轻量级的物联网综合业务支撑平台 支持物联网卡、物联网模组、卡+模组融合管理

基于 SpringBoot、Vue、Mybatis、RabbitMq、Mysql、Redis 等开发的轻量级的物联网综合业务支撑平台。支持物联网卡、物联网模组、卡+模组融合管理。提供状态、资费、客户、进销存、合同、订单、续费、充值、诊断、账单等功能。平台可同时接入中国移动、中国电信、中国联通、第三方物联网卡进行统一管理。逐步完善平台,助您快速接入物联网,让万物互联更简单。

Java程序员-张凯

西周BC845年世界历史地图矢量文件SHP格式.zip

本资源为《西周BC845年世界历史地图矢量文件SHP格式》压缩包,文件大小约 24.44 MB,便于集中下载、整理和使用。具体内容请结合压缩包内的实际文件与说明查看。 在当前可读取的目录中,可见属性表(.dbf)、投影说明文件(.prj)、Shapefile 主文件(.shp)、Shapefile 索引(.shx)。建议解压后保持原有目录结构,先浏览文件清单与说明,再选择需要的资料进行加载或整理。 应用方面,可根据实际资料用于学习练习、资料检索、研究整理或项目参考。使用时可先确定所需内容,建立清晰的文件分类,再按项目要求进行筛选、转换与汇总。 使用 Shapefile 数据时,请把实际配套的 .shp、.shx、.dbf 等文件保存在同一目录,并保持同名关联;加载后再检查坐标系与中文字段显示。如需叠加其它数据,请先统一坐标与字段口径。 数据来源、时间范围、坐标系、字段定义、精度和使用条件,请以实际文件及原始说明为准。本介绍不对文件名之外尚未核实的信息作额外承诺。

白水先森
评论
收藏 已收藏
分享
返回顶部