MIN-roamer Alpha Sprint Log 1: Burn-up Chart, Module Implementation, and Progress Update | Group 1

MIN-roamer MIN-roamer 墨衍会员 · AI 创作全网分发 墨衍智能分发 通过墨衍一键同步至各平台 可同步平台 CSDN微信公众号微博知乎掘金百家号博客园抖音小红书 你的文章也可以这样分发 墨衍会员 ¥399起/年,写一次发全网 我也要 + 加入社区

MIN-roamer Alpha Sprint Log: Stage Progress log 1 | Group1

Note on language: This project is tested in Chinese; the language switcher arrives in a later iteration. Until then, this English edition is a translation for readers outside the team, and the Chinese post remains the source of truth.

ItemContent
CourseEE308 Software Engineering
AssignmentFifth Assignment: Alpha Sprint
Project repositoryMIN-roamer SoftwareEngineering 2026 RoamMin
Goal of this postUse the Alpha sprint burnup chart to explain current task completion, show the flows that already run — travel community, buddy invitations, user registration, personal center, and the real-name-verification gate on publishing — and define the follow-up integration tasks.
GroupGroup1
Update time2026.11.22

1 Project and Tasks for This Stage

MIN-roamer is an itinerary-recording and travel-companion project for travellers. This Alpha sprint covers travel-community content display, browsing and publishing buddy invitations, the summary of personal-space information, and the front-end flow that requires a completed real-name verification before a user may publish an invitation post.

This stage aims first at pages that run, a flow that can be demonstrated, and evidence that can be reused, linking up the page flows that users can directly perceive. The current demo path is:

Browse the travel community
    ↓
Enter the buddy square
    ↓
Register or sign in
    ↓
Open the personal center
    ↓
Try to publish a travel invitation
    ↓
If not verified, go to the real-name verification page
    ↓
After verification, go to the invitation post editor

2 Alpha Sprint Burnup Chart

The burnup chart uses dates on the horizontal axis and the cumulative number of completed task items on the vertical axis, showing the scope ceiling, the planned completion and the actually confirmed completion at the same time. Compared with a burn-down chart, which only shows the remaining workload, a burnup chart makes both the work already done and any change in scope more visible. Atlassian's description of the burnup chart also notes that the completion line and the scope line help a team observe progress, scope changes and deviations from plan.

This Alpha sprint was broken down into 18 acceptance-checkable task items. On November 21, 1 item was actually confirmed complete; by November 22, 5 items were cumulatively confirmed complete, matching the planned value. The confirmed items so far include the project baseline check, the sample Fuzhou itinerary, the two-account integration-test convention, and the first sprint log. After November 23, the main tasks shift to two-account creation, user search, member invitation, and integration testing of the visibility of "itineraries I joined".

img

Figure 1 MIN-roamer Alpha sprint burnup chart

The current curve shows the actual completion coinciding with the planned completion over the first two days, so the stage is not behind schedule yet. However, the actual completion line has only two confirmed points so far, and it must keep being updated each day from evidence such as runnable features, test results, commits or issues — the count must not be incremented on the basis of verbal reports alone.

3 Module Runnable Features

Take module E as example. The screenshots below come from the local demo environment of the E module. A "Local demo mode" banner is kept at the top of the pages, indicating that sign-in, real-name verification and interaction data are for now stored in the current browser. These screenshots are used to prove that the front-end pages and interaction flows run; they are not presented as evidence that the back-end APIs have already been integrated.

3.1 Travel Community Home

The travel community displays public itineraries and travel content. Users can browse the community without signing in and see the destination, travel dates, author and trip description. Navigation, cards, colours and typography stay consistent with the main interface of the project.

img

Figure 2 Travel community home with public itineraries

3.2 Buddy Invitation Square

The buddy square collects invitation posts that are currently recruiting travel companions. Each invitation includes the destination, travel dates, number of people needed, recruitment status and requirement notes, and users can open a detail page from the list to learn more about the trip.

img

Figure 3 Buddy invitation square

3.3 User Registration

The registration page provides username, email, password and confirm-password fields, and performs basic validation on password length and on whether the two entries match. After successful registration the user can go to the personal center and continue managing their travel information.

img

Figure 4 User registration page

3.4 Personal Center

The personal center brings together the user profile, public itineraries, saved content and buddy invitations. From here the user can go to profile editing, my posts, my saved items, or the page for publishing a buddy invitation.

img

Figure 5 Personal center after signing in

3.5 Real-Name Verification Gate on Publishing

To improve the credibility of companion information, the E module adds a real-name-verification requirement before publishing. When an unverified user opens the "Publish buddy invitation" page, the route guard redirects them to the real-name verification page; only after verification is the invitation editor accessible.

This flow treats "is the user allowed to publish" as an independent authorisation condition. OWASP defines authentication as confirming a user's identity and authorisation as determining whether a user is entitled to perform an operation. What the module implements at this stage is the front-end interaction and state demonstration; once it is formally connected, the back end must validate the verification status again, and the browser-side check alone must not be relied upon.

The demo page states clearly that identity-document information will not be made public and that demo mode does not store names or ID numbers. Real personal identity-document information is not recorded in this post or in the test materials either.

img

Figure 6 Verification prompt shown to an unverified user trying to publish an invitation

3.6 Publishing a Travel Invitation After Verification

Once the verification status is approved, the user can open the invitation post editor and fill in the title, destination, start date, end date, number of people needed, recruitment status and requirement notes. After a successful submission the post appears in the buddy square and in the publication records of the personal center.

img

Figure 7 Invitation post publishing page after real-name verification is approved

3.7 Verification Status Display

After verification is complete, the personal center shows "Real-name verified", so that the user can confirm the current account status. The publishing entry remains available, and the user can continue creating new travel invitations.

img

Figure 8 Verification status shown in the personal center

4 Implementation and Verification Results at This Stage

Check itemResultEvidence
E-module pages and routesTravel community, buddy square, registration, personal center, real-name verification and invitation publishing pages are all reachableFigures 2 to 8 of this post
Publishing permission flowUnverified users cannot enter the publishing page directly; verified users canFigures 6 and 7 of this post
Personal center statusDisplays the unverified or verified status together with entries such as publishing and saved itemsFigures 5 and 8 of this post
E-module stage codeFront-end code for the community, buddy posts and real-name verification has been committedCommit 7f60ea9
Alpha sprint logFirst-stage progress, sample data and follow-up plan have been committedCommit ade807a
Production buildTypeScript checking and a Vite build have been run for the E modulemodule-e branch

The official Vite documentation states that production builds use vite build to generate asset bundles suitable for static deployment. The page code at this stage has been checked with a production build, but the full acceptance of the main project should still be based on end-to-end results in a unified back-end environment.

5 Problems Encountered and How They Were Handled

5.1 The Module Did Not Match the Main Interface Style

The first version of the E module looked more like a standalone site and differed from the green, off-white and orange visual system already present on the main branch. To fix this, the top brand area, navigation, buttons, forms, cards, corner radii, spacing and light/dark themes were unified, so that the E module looks like part of the same project.

5.2 Publishing Invitations Lacked a Trusted-Identity Restriction

The original flow let any signed-in user publish an invitation directly, with no further check of identity status. A real-name verification page and a verification route guard were therefore added, forming a two-layer front-end flow of "sign-in check + verification-status check". When the back end is connected later, storage of the verification result and the permission check on the publishing API must be moved to the server side.

5.3 The Current Environment Cannot Stand in for Full Back-End Integration

The page demonstration in this post uses local front-end data, in order to fix the interface and interaction path first. The current evidence proves that the pages run, but it cannot replace testing against a real database, back-end permissions and the two-account invitation flow. The demo-mode banner is kept in the post to avoid confusing "the front end is done" with "full-stack integration is done".

6 Plan for the Next Stage

  1. Gradually connect the E-module pages to the main project's frontend, reusing the unified user, itinerary and member APIs.
  2. Start the back end on a machine with Java 17 and Maven, and run real registration, sign-in and session-restoration tests.
  3. Use two temporary test accounts to run an end-to-end regression of "create itinerary → search user → invite member → the invited account sees the joined itinerary".
  4. Make the real-name verification status come from the back end, and enforce the permission check again in the publish-invitation API.
  5. Link test results, commits, issues, screenshots or screen recordings back to the task items, and update the actual completion line of the burnup chart every day.
  6. Reuse the runnable screenshots and test evidence from this post to prepare the testing post, the sprint summary and the defence slides, so that materials are not duplicated and do not contradict each other.
  7. Add the Chinese/English language switcher once the current feature set and the back-end integration have stabilised, and keep both language editions of the interface copy in step from then on.

7 Stage Summary

As of November 22, the Alpha sprint has cumulatively confirmed 5 task items complete, in line with the planned progress. The modules now forms a complete front-end demo path from browsing public content through registration and sign-in, the personal center, and publishing an invitation after real-name verification, and its visual style has been brought close to that of the main project.

The most important outcome of this stage is that the feature pages, the permission flow and reusable evidence have been pinned down. The next stage will no longer focus only on whether a page displays, but on verifying real accounts, permissions and data flow in a unified back-end environment, so that "demonstrable" becomes "integratable, testable and acceptable".

...全文

相关推荐

Unity数据可视化实战:Graph and Chart插件核心功能与性能优化指南

数据可视化是现代软件开发中呈现和分析信息的关键技术,其核心原理是将抽象数据映射为直观的图形元素,以揭示模式、趋势和关联。在游戏开发、工具制作和工业仿真等领域,高效的数据呈现能极大提升信息传达效率和用户体验。Unity作为主流的实时内容开发平台,其原生UI系统虽功能强大,但构建复杂的图表需要处理坐标计算、网格绘制和交互响应等大量底层工作,开发效率低下且难以保证视觉效果的专业性。Graph and Chart插件正是为解决这一痛点而生,它封装了折线图、柱状图、饼图等常见图表类型的完整实现,提供了从数据绑定到样式

宵蓝

Vue 3 中 Chart.js 集成的底层原理与可靠实践

Chart.js 是基于 Canvas 的命令式可视化引擎,Vue.js 则是声明式响应式框架——二者在渲染时机、状态同步和 DOM 生命周期上存在天然语义鸿沟。理解 canvas 尺寸计算机制(HTML 属性 vs CSS 样式)、Vue 的 nextTick 与 DOM 就绪关系、以及 Chart.js 的 resize/update 触发条件,是解决图表空白、不更新、宽高为 0 等高频问题的核心。技术价值在于规避封装库抽象带来的黑盒风险,通过 ref + onMounted + watch + Res

weixin_30945039

MySQL事务底层原理:redo log、undo log与MVCC的完整解析

事务是数据库并发控制的核心机制,ACID特性背后是日志、锁与版本链的精密协作。理解MySQL存储引擎InnoDB的实现方式,是深入数据库原理与性能调优的关键。redo log通过预写日志保证持久性,undo log记录反向操作支撑回滚与多版本并发控制,隔离级别则依赖锁与MVCC快照协同实现。两阶段提交解决了redo log与binlog的一致性,确保崩溃恢复与主从复制的数据对齐。从单机事务到分布式事务,可靠消息最终一致性与Seata AT模式提供了不同场景的落地方案。本文系统拆解事务实现的底层链路,帮助开发

weixin_33889245

长事务导致undo log堆积

通过上述多层次的机制分析可见,长事务导致的Undo堆积本质上是由于MVCC的版本可见性规则与Purge机制的协同问题。解决该问题需要从事务管理、系统监控、存储引擎优化等多个维度进行综合治理。

提前退休的java猿

【MySQL系列6】详解一条查询select语句和一条更新update语句的执行流程

这里是小编拿到的学习资源,其中包括“中高级Java开发面试高频考点题笔记300道.pdf”和“Java核心知识体系笔记.pdf”文件分享,内容丰富,

2401_84046876
评论
收藏 已收藏
分享
返回顶部