Gruop5 - CodeStrike Alpha Sprint Essay 2 - Day 3 - 4 (November 23 - 24, 2026)
CodeStrike Alpha Sprint Essay 2 — Day 3–4 (November 23–24, 2026)
Basic Information
| Item | Information |
|---|---|
| Course | EE308FZ Software Engineering |
| Assignment | Assignment 5 — Alpha Sprint |
| Team | CodeStrike (Group 5) |
| Project | Campus Competition & Activity Community (竞伴校园) |
| Sprint Period | November 21–28, 2026 |
| Reporting Period | November 23–24, 2026 |
| GitHub Repository | CodeStrike Repository |
| Integration Branch | sprint/alpha |
| Main Sprint Task | T4 — Competitions & Teams Integration |
| Task Status | Completed |
Table of Contents
- Sprint Overview
- Daily Development Progress
- Core Feature Implementation
- Latest Running Screenshots
- GitHub Task and Commit Evidence
- Sprint Burn-up Chart
- Testing and Quality Assurance
- Problems Encountered and Solutions
- Next Sprint Plan
- Sprint Reflection
1. Sprint Overview
The second reporting period of the CodeStrike Alpha Sprint focused on T4 — Competitions & Teams Integration, following the schedule established in the published sprint plan.
During the first reporting period, the project completed baseline integration, shared HTTP communication, and MySQL-backed authentication and profile management.
Building on this foundation, T4 connected the application's central business workflow to the real FastAPI backend and MySQL database, covering competition discovery, team creation, recruitment publication, student applications, and captain decisions.
Particular attention was given to team capacity, recruitment visibility, application integrity, and access control.
By November 24, T4 had completed implementation, automated verification, pull request integration, and formal task acceptance.
2. Daily Development Progress
2.1 Day 3 — November 23: Implementation and Business Integration
Development began with a comparison between the backend OpenAPI specification and the existing frontend prototype view models.
The identified contract differences were documented before implementation. Shared DTOs and explicit adapters were subsequently extended to support the actual competition and team APIs.
The main development activities included:
- Connecting eight existing frontend pages to real backend services.
- Integrating competition discovery and server-side search.
- Implementing team creation and recruitment revision workflows.
- Connecting application submission, withdrawal, history, and captain decisions.
- Correcting two backend response inconsistencies.
- Expanding automated API, database, and browser verification.
The implementation introduced 11 API route contract tests and 29 competition and team end-to-end tests.
The production H5 application was also tested against the running backend, completing 53 browser assertions and capturing eight functional screenshots.
The principal implementation commit was 8f84d65.
2.2 Day 4 — November 24: Verification and Integration
The existing test suites and T4 verification procedures were executed again before final integration.
The backend tests, frontend tests, database checks, application builds, and H5 browser verification produced consistent passing results.
Pull Request #12 was merged into sprint/alpha at 09:21:13 Beijing time.
Following the recorded verification and acceptance results, Issue #4 was closed at 09:23:03.
The sprint evidence index and burn-up chart were subsequently updated to reflect the actual completion date.
3. Core Feature Implementation
3.1 Competition Discovery
The competition list and detail pages now retrieve data from the real FastAPI backend.
Competition-name search is performed through the server-side query parameter. Registration status, deadline information, and associated recruitment records are retrieved from the backend.
The implementation preserves the existing loading, empty, and error states while preventing unpublished competitions from appearing in public listings.
3.2 Team Creation and Recruitment
Authenticated students can create teams using the real POST /teams endpoint.
Selected skills are mapped to identifiers from the backend skill catalog rather than being submitted as mock skill names.
The backend validates profile completeness, competition eligibility, and team capacity. The captain is counted as the first active member of the team.
Recruitment publication follows a controlled workflow:
Team creation → Recruitment revision → Administrator approval → Public recruitment
Unapproved recruitment records remain unavailable to public users. The Open/Closed recruitment switch and Delisted visibility restrictions are enforced by the backend.
During T4 verification, administrator approval was performed through the existing authorized moderation API. The complete administrator interface remains within the scope of T6.
3.3 Application Submission and History
Students can submit applications, withdraw eligible applications, and retrieve their application history through authenticated API requests.
The backend prevents duplicate Pending applications for the same student and team.
Students with incomplete profiles are required to complete their information before applying. Skill mismatch is treated as advisory rather than an automatic rejection.
Approved, Rejected, and Withdrawn application records are retained in the database, supporting persistent application history.
3.4 Captain Review and Membership
Captains can retrieve Pending applications for their own teams and approve or reject applicants.
The frontend converts decision actions into the backend's expected Approved and Rejected values.
A successful approval creates an active membership record. Rejection preserves the application history without creating membership.
Unauthorized users cannot access another team's review queue or perform captain decisions.
The prototype Persona Switcher is disabled in API mode, ensuring that actual permissions depend on authenticated server-side identities.
3.5 Capacity and Privacy Protection
Team capacity and privacy restrictions are enforced by the backend rather than relying solely on frontend controls.
A concurrent last-slot approval test was performed using MySQL 8.4.6. Two simultaneous approval requests competed for one remaining position, and exactly one succeeded. The other was rejected with TEAM_FULL.
The team remained within its permitted capacity.
Privacy verification confirmed that applicant previews exclude private contact details. Protected member contact information is accessible only to the authorized captain of the corresponding team.
Ordinary members and non-members cannot retrieve such information through the protected endpoint.
4. Latest Running Screenshots
The following screenshots were captured from the production H5 build in API mode at a 390 px viewport, connected to the real FastAPI backend and MySQL database.
4.1 Competition Discovery

Figure 1. Competition Discovery Using Real Backend Data
The competition list displays backend-provided competition information after a server-side search, demonstrating the transition from mock data to actual API integration.
4.2 Team Creation

Figure 2. Team Creation Form with Backend Skill Catalog
The team creation form uses available competition information and the real skill catalog. Team capacity and profile eligibility are validated by the backend when the request is submitted.
4.3 Recruitment Publication

Figure 3. Published Team Recruitment
Following administrator approval, the recruitment becomes publicly visible within the corresponding competition.
4.4 Application Submission

Figure 4. Recruitment Detail After Application Submission
An authenticated student submits an application through the real backend. The resulting application state is persisted in MySQL and retrieved by the frontend.
4.5 Captain Review

Figure 5. Captain Review of Pending Applications
The captain review interface displays eligible Pending applications, applicant profile previews, and skill-match information while excluding private contact details.
4.6 Membership Confirmation

Figure 6. Team Membership After Successful Admission
After the application is approved, the updated team membership is retrieved from the backend. Database-level verification confirms that the membership record has been persisted.
5. GitHub Task and Commit Evidence
T4 was implemented on a dedicated feature branch and integrated into sprint/alpha through a pull request.
| Item | Evidence |
|---|---|
| Sprint Task | T4 — Competitions & Teams Integration |
| Priority | P0 |
| GitHub Issue | Issue #4 |
| Development Branch | feat/4-competitions-teams |
| Implementation Commit | 8f84d65 |
| Pull Request | PR #12 |
| Merge Commit | e05d333 |
| Merge Date | November 24, 2026 |
| Issue Status | Closed |
The task acceptance record includes implementation details, verification results, and the associated evidence directory.
The repository maintains the established feature-branch workflow without modifying the stable main branch or the historical Assignment 4 prototype branch.
Detailed records are available through the T4 Delivery Record.
6. Sprint Burn-up Chart

Figure 7. CodeStrike Alpha Sprint Burn-up Chart — Day 3–4
The burn-up chart measures the cumulative number of accepted tasks against the nine tasks established in the published sprint plan.
| Date | Total Scope | Accepted Tasks |
|---|---|---|
| November 21 | 9 | 0 |
| November 22 | 9 | 3 |
| November 23 | 9 | 3 |
| November 24 | 9 | 4 |
T1, T2, and T3 were accepted during the first reporting period.
Although T4 implementation and local verification were completed on November 23, the task was not counted as accepted until its pull request was merged and Issue #4 was closed on November 24.
The cumulative completion count is now four out of nine planned tasks, representing approximately 44.4% by task count.
The overall sprint scope remains unchanged. The chart measures accepted tasks rather than story points or development effort.
The remaining five tasks will continue according to the published sprint schedule.
7. Testing and Quality Assurance
7.1 Automated Verification Results
The T4 implementation was verified through frontend tests, backend tests, database inspection, production builds, and browser-based end-to-end testing.
| Verification | Result |
|---|---|
| TypeScript type checking | PASS |
| Student mock and unit tests | 78 passed |
| Student end-to-end tests | 44 passed |
| Administration HTTP tests | 8 passed |
| Backend pytest on MySQL 8.4.6 | 66 passed, 0 skipped |
| MySQL integrity test subset | 5 passed |
| Direct database-state checks | 22 passed |
| Real H5 business workflow | 53 assertions passed |
| Actual H5 API requests | 101 |
| OpenAPI contract verification | PASS |
| H5 production builds — Mock and API | PASS |
| WeChat Mini Program compilation | PASS |
| Administration web build | PASS |
The MySQL integrity tests are included in the backend test suite and are not counted as additional independent backend tests.
7.2 Business Rule Verification
| Test Scenario | Observed Result |
|---|---|
| Recruitment before approval | Not publicly visible |
| Recruitment after approval | Publicly visible |
| Valid student application | Pending record created |
| Duplicate Pending application | DUPLICATE_PENDING |
| Incomplete student profile | PROFILE_INCOMPLETE |
| Skill mismatch | Application remains permitted |
| Captain approval | Active membership created |
| Captain rejection | Rejected history retained |
| Approval beyond team capacity | TEAM_FULL |
| Concurrent last-slot approvals | Exactly one successful approval |
| Unauthorized access to contacts | FORBIDDEN |
| Delisted recruitment | Excluded from public listings |
The concurrent approval test was performed against a real MySQL 8.4.6 instance using the READ-COMMITTED isolation level.
Direct database inspection confirmed the persistence of team, membership, application, and recruitment revision records.
7.3 Regression and Verification Boundaries
Existing Assignment 4 prototype functionality was preserved. The three prototype regression suites passed 52, 232, and 227 assertions respectively.
The backend OpenAPI specification remained consistent at 58 paths and 47 schemas.
The current verification also has the following boundaries:
- The capacity refusal was verified through client responses and database state, but its rendered error banner was not captured.
- The administrator approval step was tested through the authorized API; the full administrator interface belongs to T6.
- The WeChat Mini Program compiled successfully, but its operation in WeChat Developer Tools and on physical devices has not yet been verified.
- Continuous integration has not yet been configured in the repository.
Detailed logs and screenshots are retained in the T4 Evidence Directory.
8. Problems Encountered and Solutions
8.1 Missing Team Identifier in History Responses
Problem: The team history endpoint did not return the team identifier required by the frontend to associate historical membership records with their corresponding teams.
Solution: The backend response projection was extended to include teamId and the relevant team-state fields.
A dedicated regression test was added to verify that the returned historical record identifies the correct team.
8.2 Missing Recruitment Match Information
Problem: Public recruitment responses did not include personalized skill-match information, preventing accurate presentation of recruitment compatibility for authenticated students.
Solution: The recruitment endpoint was extended to accept optional authentication and calculate actual skill overlap for the current viewer.
Anonymous public access remains available. Regression tests verify matched, unmatched, and unusable-token cases.
8.3 Concurrent Approval and Capacity Protection
Challenge: Simultaneous approval requests could compete for the final available team position.
Verification: A real MySQL concurrency test confirmed that transaction serialization prevents both requests from occupying the same remaining position.
The successful request created the membership, while the second was rejected with TEAM_FULL. The final database state remained within the permitted team capacity.
This verification demonstrates the importance of database-level consistency in addition to frontend validation.
9. Next Sprint Plan
According to the published Alpha Sprint schedule, the next reporting period, November 25–26, will focus on T5 and T6.
| Task | Planned Development |
|---|---|
| T5 — Community Posts & Interactions | Community posts, comments, likes, favorites, and image upload |
| T6 — Admin Web Integration | Administrator authentication, dashboard data, competition management, and moderation |
The next phase will reuse the shared HTTP infrastructure, authentication system, and verified competition and team workflows.
Preparation for WeChat Mini Program compatibility verification will also continue under T9 without replacing the established development schedule.
The remaining implementation work will follow the existing task acceptance criteria, GitHub workflow, and evidence collection standards.
10. Sprint Reflection
During the second reporting period, CodeStrike extended its database-backed account system into a functional competition and team collaboration workflow.
T4 demonstrated the integration of frontend interaction, backend authorization, recruitment moderation, application processing, and persistent membership management.
The verification of duplicate applications, concurrent approvals, capacity limits, and protected contact information was particularly important because these rules directly affect system reliability and user privacy.
With T1–T4 accepted, the project has established its principal student-side business foundation. The next phase will extend this foundation to community interaction and administration functionality while maintaining reproducible testing and traceable delivery evidence.
Related Links
相关推荐
高校技术转移中心如何选型管理系统?数智化工具如何破解成果转化三大难题?.docx
科易网基于行业知识库+行业大数据+科技资源要素+AI模型,以AI,赋能技术转移、成果转化、技术经理人培训、知识产权管理、区域产业分析与布局、地方科技招商、创新创业大赛等场景,推出科技创新领域的AI工具、场景化服务和数智化解决方案,推动科技创新与产业创新智能化发展。
iperf3 安卓版 - 手机网络测速工具(客户端/服务端/双向打流)
基于 iperf3 3.22 源码交叉编译的 Android 原生测速 App,手机可直接作为 iperf3 客户端或服务端。 功能:客户端/服务端双模式;TCP/UDP;多并发流;反向下载 -R;双向打流 --bidir;UDP 带宽按 Mbps 设置;实时速率曲线与当前/平均/峰值;历史记录;Material3 界面。 安装:下载 APK,允许未知来源安装。支持 Android 7.0+,架构 arm64-v8a / armeabi-v7a / x86_64。iperf3 遵循 BSD-3-Clause 协议,版权归 ESnet。
生产制造企业智慧工厂MES一体化管理平台解决方案.pptx
生产制造企业智慧工厂MES一体化管理平台解决方案.pptx
考虑分布式电源运行特性的有源配电网智能软开关SOP规划方法【IEEE33节点】(Matlab代码实现)
内容概要:本文研究了考虑分布式电源运行特性的有源配电网智能软开关(SOP)规划方法,并基于IEEE33节点系统进行了Matlab代码实现。该方法旨在通过引入SOP这一先进的电力电子装置,提升配电网对分布式电源(如光伏、风电)的接纳能力与运行灵活性。研究综合考虑了分布式电源出力的波动性和不确定性,构建了以网损最小、电压偏差最小等为目标的优化模型,并采用合适的智能优化算法求解SOP的最佳安装位置和容量配置。文中详细阐述了模型构建的理论基础、关键约束条件的处理方式以及仿真算例的设置与结果分析,验证了所提方法在改善配电网电压质量、降低网络损耗和促进清洁能源消纳方面的有效性。; 适合人群:具备电力系统分析、优化算法基础,从事配电网规划、分布式能源接入等相关研究的研究生、科研人员及电力公司技术人员。; 使用场景及目标:① 掌握智能软开关(SOP)在现代有源配电网中的应用原理与规划方法;② 学习如何将分布式电源的运行特性融入配电网优化模型;③ 获取基于IEEE33节点系统的Matlab代码实现,用于复现经典算例或进行二次开发研究。; 阅读建议:此资源紧密结合理论与实践,不仅提供了详细的数学模型推导,还给出了完整的Matlab代码。读者应在理解优化模型和SOP工作原理的基础上,结合代码进行仿真调试,深入分析不同场景下SOP的配置方案对配电网性能的改善效果。
技术转移机构想要获得官方认可,需要满足哪些资质认定标准?.docx
技术转移机构想要获得官方认可,需要满足哪些资质认定标准?