EE308FZ · Fifth Assignment · Alpha Sprint · Sprint Essay 3 (Day 5–6)
EE308FZ · Fifth Assignment · Alpha Sprint · Sprint Essay 3 (Day 5–6)
| Item | Content |
|---|---|
| Course | EE308FZ Software Engineering |
| Assignment | Fifth Assignment — Alpha Sprint |
| Assignment link | https://bbs.csdn.net/topics/620611106 |
| This post | Sprint Essay 3, covering Nov 25–26, 2026 (sprint runs Nov 21–28; Essay 2 covered Nov 23–24) |
| Team / product | LabRunners (14 members) — LabFlow, campus laboratory equipment reservation platform |
| Repository | https://github.com/YEPM17/LabFlow |
| Goal of this assignment | Report the real progress of the last two sprint days: burn-up chart, latest running state of the system, and per-member deliverables with Issue/commit or test evidence |
| References | Alibaba Java Development Manual (Ultimate Edition v1.3.0); Conventional Commits 1.0.0; Node.js 24 documentation; WCAG 2.1 AA (focus order, live regions); the team's SRS, code-standard essay and docs/SCAN-CODE.md |
1. Where the sprint stands after Day 6
Essay 2 ended at 48 of 88 SP, 4 SP ahead of the line, with a two-day objective: close the two correction items on Nov 25 (LF-A4 notifications, LF-A5 statistics) and carry LF-A6 plus LF-A7 into the Nov 26 feature freeze, ending at 88 SP.
Both days landed, but not in the shape Essay 2 forecast. 72 of 88 SP are closed (81.8%) against a plan line of 66 SP — 6 SP ahead — seven of the eight items are done, and the eighth (LF-A7, the regression suite and test report) is open on purpose: it closes on Nov 27.
"Closed" still means the Day 1 Definition of Done, not "code written": merged through a reviewed pull request, Issue closed, at least one automated check green, and the behaviour reproducible from the runbook on a clean machine. Two of the three items closed in this window (A4, A5) were closed on the strength of a recomputation or a repeatable request sequence rather than a demo, which is the only kind of closure that survives a defence.
Two corrections to Essay 2's forecast were made during these two days. Both were reviewed with the PM and the test owner, and both are recorded here rather than absorbed silently:
| Essay 2 forecast | What Nov 25–26 delivered | Why |
|---|---|---|
| 88 SP closed by Nov 26, scope finished before the buffer | 72 SP closed; A1–A6 frozen at 18:00 on Nov 26; A7 open until Nov 27 | A7's acceptance is "core paths covered, defect closure 100%". Until 18:00 on Nov 26 the tree was still receiving A6 fixes, so a report signed before the freeze would have certified a tree that no longer existed. The plan's M2 milestone only requires A1–A6 merged, and A7's window is 11-24 – 11-28, so this is inside plan. The forecast was wrong; the scope was not |
| A4 as notification rules and review prompts on the teacher side | A4 closed as one behaviour behind two mount points, teacher and student, including the 15-minute reminder | The read-state defects lived on the student side — the page a reviewer opens first. Fixing only the teacher wording would have left the badge wrong on the page that gets demonstrated |
A third decision is smaller and changes what the numbers mean rather than what the code does: A5 did not touch the utilisation formula. It printed the denominator and separated future from past on the card. Section 3 has the arithmetic, because a statistic that cannot be recomputed by hand is a decoration.
2. Burn-up chart

| Date | Planned cumulative (SP) | Actual cumulative (SP) | Closed on that day |
|---|---|---|---|
| Nov 20 (baseline) | 0 | 0 | — |
| Nov 21 | 11 | 0 | Sprint setup, environment, no item closed |
| Nov 22 | 22 | 20 | LF-A1 (10), LF-A8 (10) |
| Nov 23 | 33 | 30 | LF-A2 backend half — scan flow/IA (5), prefill implementation (5) |
| Nov 24 | 44 | 48 | LF-A2 UI half — entry UI (4), failure states (4); LF-A3 (10) |
| Nov 25 | 55 | 60 | LF-A4 (6), LF-A5 (6) |
| Nov 26 | 66 | 72 | LF-A6 (12) |
| Nov 27 | 77 | — | planned: LF-A7 (16) → 88 |
| Nov 28 | 88 | — | planned: final regression, material sign-off |
Reading the chart. The grey line is the frozen scope, 88 SP, i.e. 11 SP per day. The blue line is the ideal, the dark stepped line is actual completion.
The step shape is unchanged from Essay 2 and still deliberate: acceptance happens once per day, in a review batch, not per commit. Nov 25 closed 12 SP against 11 planned, Nov 26 closed 12 against 11 planned, so the gap widens slowly from 4 SP to 6 SP rather than jumping. Nov 27 is a single 16 SP riser when A7 closes, and Nov 28 is flat by design.
No scope change has been requested and none is planned. The 6 SP lead is bookkeeping, not slack: 16 SP (A7) still has to close, and it could only start after the freeze that happened on Nov 26. What the lead buys is exactly one day — Nov 28 — that stays empty as a defect buffer, which is the shape Essay 2 asked for, reached one day later than its forecast and still inside the plan's own window for A7.
3. Day 5 — Nov 25: the notification centre, and a statistic that explains itself
Two items were due, and neither was a new feature. A4 had to make one notification say the same thing in the badge, the list and the review prompt, and remember that it had been read. A5 had to make a percentage recomputable. Both are the class of work that looks trivial in a backlog and is not, because in both cases the defect is a disagreement between two places that each look correct on their own.
LF-A4 · one behaviour, two mount points — public/ui.js
A4's acceptance line has two clauses: the 15-minute reminder is reproducible, and read state is correct. Both were failing on the student workspace and neither failed on the teacher workspace, because until Day 5 there were two notification renderers — the teacher workspace had one written with the review queue, and the student workspace had a bell and a dropdown bolted on during the prototype phase. They disagreed on three things: where the unread count came from, what a reminder was called, and whether a row could be clicked twice.
The fix was not to synchronise the two copies. The renderer moved into ui.js as createNotificationCenter({ mount, role }), and both student.html and teacher.html mount it. One implementation is what §2.9 of the code standard asks for ("同一功能在仓库中只保留一种实现方式"), and it is the reason the three defects below were fixed once instead of twice.
Three read-state defects, one failure mode
| # | What a user saw | Root cause | Fix |
|---|---|---|---|
| N-1 | Badge showed 20 unread while 25 were unread; reading one left it at 19 | The badge was derived from the rendered list — items.length of a limit=20 page — instead of the account total | The badge renders unreadCount from the same response that fills the list; the list keeps limit=20. Count and page are different questions |
| N-2 | After clicking 已读, the badge jumped back to unread a second later | A GET /notifications issued before the POST /notifications/:id/read resolved after it and re-rendered the pre-read state | A per-request notificationRequestToken plus a mutationSeq counter: a response older than the last local mutation is discarded, not rendered |
| N-3 | Double-clicking a row left the row unread again | Two POSTs for one id; the second response re-rendered from a copy taken before the first write | readingNotificationIds Set as an in-flight guard, row aria-busy="true" and inert while the write is open |
N-2 is the same failure the booking panel already had and already solved (slotRequestToken, §3.3), which is why the fix reuses that pattern instead of inventing a second one: a stale response is not an error, it is late, and late data must lose. Reusing the guard is §2.9 applied to behaviour rather than to markup.
A count that survives a second tab
POST /notifications/read-all returns the number of rows it changed, so the panel sets the badge to zero from that number and then confirms with one GET. If the server disagrees, the server wins. That rule is what surfaced the two-tab case: read-all in one tab leaves the other tab's badge stale until its next poll. With a 60-second period the worst case is one minute of a wrong badge, and it is recorded as a known limitation of this sprint rather than papered over with a real-time channel the project does not have.
Polling that stops when nobody is looking
The panel polls /notifications every 60 s while document.visibilityState === "visible", pauses on visibilitychange, and refreshes once on focus. There is a single timer and it is cleared before the logout redirect — otherwise the tick after POST /auth/logout fires a 401 from a page that is already leaving, and api() then sends the user to the login page they were just sent to. Of the three concurrency guards in §3.3, two apply here (stale-response discard, N-2; duplicate-submit guard, N-3) and the third, input debounce, has no text input to guard.
One label map, so a notification says one thing
notificationLabel(type) is the single mapping from reservation_approved / reservation_rejected / reservation_reminder / repair_started / repair_completed to copy, and it is used by the badge tooltip, the list row and the panel header. The reminder renders "15 分钟后开始,预约时间 09:30–10:30" and carries the reservation's start, because "即将开始" without a time is not actionable — the §2.4 rule that a prompt must tell the user what to do next applies to notifications as much as to error messages. The role argument on the mount only chooses the empty state and the mount copy; the counting rule is the same on both pages, because the API already scopes notifications to the account.
Accessibility, because the panel is a keyboard surface
aria-expanded on the bell, Escape closes the panel and returns focus to the bell, rows are real buttons with a focus-visible style, and bodies are inserted with textContent rather than innerHTML — a notification body carries a device name a teacher typed, so §2.5's escaping rule applies to the panel as much as to a table. The polite live region announces only when the count increases, not on every poll; announcing every 60 s would make the panel unusable with a screen reader, which is worse than not announcing at all.
Verification on Day 5
GET /api/notifications?limit=20 → 200 {"items":[…20],"total":26,"unreadCount":25}
POST /api/notifications/<id>/read → 200 {"notification":{…},"readAt":"2026-11-25 10:14:22"}
GET /api/notifications?unreadOnly=true → 200 {…,"unreadCount":24}
POST /api/notifications/read-all → 200 {"updated":24}
GET /api/notifications?unreadOnly=true → 200 {"items":[],"total":0,"unreadCount":0}
node --test → # tests 15 # pass 15 # fail 0 (1.16 s)
The backend was not the problem. All five calls returned what docs/API.md documents before and after the front-end change, which is the counter-example to "the badge is wrong, so the API must be wrong" — the count was always correct, it was simply being replaced by the page size.
LF-A5 · the number was right, the sentence was missing
Wednesday's board said 0.3% utilisation. The arithmetic behind it is 1.5 approved hours ÷ (5 devices × 7 days × 14 open hours) = 1.5 / 490 = 0.31%. Correct, and useless in the form it was presented: the same card showed 本周预约 4 under a heading that read as "used", while 已用小时 counted only approved time, so the two numbers on one card answered two different questions — one future-facing (pending requests), one past-facing (approved hours).
Four changes, all on the surface, none in the formula:
- the card prints the denominator — "1.5 / 490 设备小时(08:00–22:00 × 5 台 × 7 天)" — so a reader can recompute the rate instead of trusting it;
- 历史 / 未来 labels on the overview and the weekly block: pending requests for future slots sit under 未来 and never enter 已用小时;
- peak hours are defined before they are drawn — approved reservations bucketed by start hour, top three, bucket label printed ("09:00–10:00"), and an explicit empty state "本周暂无已批准预约" instead of an empty chart;
- a mid-week note: the denominator is the whole week, so a Wednesday reading is low by construction. That sentence replaces the old implication that 0.3% meant the laboratories were idle.
GET /api/stats/overview now returns deviceHours next to approvedHours and utilizationRate, so the rate is a function of two numbers the client already holds rather than a number the client has to believe:
GET /api/stats/overview?days=7 → 200
weekly: { "reservationCount": 4, "approvedHours": 1.5, "deviceHours": 490, "utilizationRate": 0.3 }
check : 1.5 / 490 = 0.00306 → 0.3% (same reading as the panel, reproducible by hand)
4. Day 6 — Nov 26: compatibility, freeze, regression
The three tasks due on Nov 26 had a mandatory order, and it was the whole point of the day: compatibility first, because a defect found after the freeze needs an exception; freeze second, because a regression can only certify a tree that has stopped moving; regression third, because that is the only order in which the report is still true when it is signed.
1. LF-A6 · three viewports, eight breakpoints
The acceptance rule was 360 / 768 / 1280 with no horizontal overflow, plus ±1 px either side of each of the eight CSS breakpoints (599/600, 759/760, 799/800, 849/850, 899/900, 999/1000, 1099/1100, 1249/1250) with a screenshot per pair. Four defects survived to Nov 26:
| # | Where | Defect | Fix |
|---|---|---|---|
| D-1 | Notification panel @ 360 px | Panel was 320 px fixed, plus 24 px page padding on each side, so it needed 368 px on a 360 px viewport — 8 px of horizontal overflow | width: min(320px, calc(100vw - 32px)), rows wrap, long device names break with overflow-wrap: anywhere |
| D-2 | Statistics card @ 768 px | The two-column grid collapses to one and the cards differ in height by 40 px, so the numbers shift while tabbing | min-height from a CSS variable plus align-items: stretch |
| D-3 | Scan panel, keyboard | Tab order follows DOM order, so focus jumps from the time field to the footer links before the submit button | DOM order changed to match visual order; no positive tabindex anywhere |
| D-4 | Bell @ 1280 px | Badge overlaps the search box by 3 px while the panel is open | Panel positioned from the trigger's box instead of a fixed offset |
D-1 was in the panel built the day before, and that is the argument for running the compatibility pass after the feature rather than in parallel with it: the defect did not exist on Nov 24 because the component did not exist on Nov 24. Fixing it also produced a rule the next panel inherits — size a floating panel from the viewport, never from a fixed pixel width.
2. Freeze at 18:00
A1–A6 merged, 72 of 88 SP closed (A8 was closed on Nov 22), main demonstrable from the runbook. Freeze in practice, in the team's own words: new work only on fix/ branches; only defects that meet M3's blocking definition (核心路径不可用或数据错误); every such change needs the PM's approval and a reviewer who is not the author; A7 and A8 keep running because they are verification and documentation, not features.
Two changes were merged after 18:00 under that rule — D-1 and D-3, both blocking on a phone, because a panel that overflows and a focus order that skips the submit button are both "core path unusable" on the device the demo runs on. They are recorded in this post rather than in the defect log only, because a freeze that quietly accepts fixes is not a freeze.
3. LF-A7 · the regression starts where the fixes stop
The suite grew from 15 to 19 tests, and all four new cases are notification cases, because that is where the sprint's risk moved in the last two days:
| Case | What it asserts |
|---|---|
| reminder is generated and counted | a reservation_reminder appears for an approved reservation inside 15 minutes, and unreadCount increases by exactly one |
| reading one decrements the count | readAt is set, unreadCount falls by one, and unreadOnly=true no longer returns the row |
| read-all empties the unread view | updated equals the previous unread count and unreadOnly=true returns items: [] |
| another account cannot mark my notification read | 404, checked before the write — ownership first, not after (§2.5 越权) |
The nine-step scan checklist became twelve; the three new steps are the front-end behaviours that node --test cannot see — a badge that shows the account total with more than 20 unread, a stale poll that must not resurrect a read row, and two tabs converging inside one poll period.
node --test → # tests 19 # pass 19 # fail 0 (1.58 s)
GET /api/stats/overview?days=7 → 200 deviceHours 490 · approvedHours 1.5 · utilizationRate 0.3
4. Second standards retrospective (Nov 26)
The plan requires three retrospectives (11-24, 11-26, 11-28) with the conclusions written into the corresponding sprint logs. This is the second one, and it produced three findings rather than a status report:
| # | Finding | Where it came from | Action |
|---|---|---|---|
| R-1 | The defect that mattered most (N-2) was caught by review, not by a test | Review checklist 6.4 item 4 ("动态文本已转义,按钮不会重复提交") | The item stays; the PR template now also asks whether one action can arrive from two entry points or two tabs, because that is the shape N-2 and the two-tab case both had |
| R-2 | Three // TODO comments in public/ carried no Issue number | §2.3 requires TODO(#n); ui.js had // TODO: 支持通知分组 | All three now reference #16; no unticketed TODO remains in public/ |
| R-3 | §3.3 listed the three concurrency guards against the booking panel only, so a new panel could read it as not applying | Code shipped without the guards for one day; §2.8 makes the code authoritative and requires the standard to be revised the same day | §3.3 amended to name the notification centre as a third place the guards apply; standards v1.1, 2026-11-26, revised by the PM |
R-3 is the uncomfortable one and it is the one worth keeping: the standard was not wrong, it was narrower than the behaviour it governed, and the only reason it was noticed is that the log has to explain a defect rather than hide it.
5. Test essay draft
The testing essay reached first draft for internal review and was not published, per the schedule that puts it on Nov 28. Its backbone is the 19 cases, the twelve manual steps and the four defects with their closing commits; the tooling argument that Essay 2 deferred to it — why this sprint used a documented manual checklist instead of a browser in CI — is the section that essay is built around.
5. Latest running state
The build below is the one that answered the requests in section 3 and the one frozen at 18:00 on Nov 26.
⟨TODO: paste screenshot — teacher workspace at 1280 px, notification panel open with a pending reservation, pending-review badge and the 已读 / 全部已读 controls⟩
⟨TODO: paste screenshot — student workspace at 360 px, notification panel showing the approval notification and the 15-minute reminder, badge showing 2, no horizontal overflow⟩
⟨TODO: paste screenshot — teacher statistics board with the 历史 / 未来 labels and the printed denominator "1.5 / 490 设备小时"⟩
⟨Optional: 6-second gif — approve a reservation in one window, badge increments in the other window within one poll period⟩
The two notification screenshots are the same component, captured at the two viewport extremes, so the feature and the D-1 fix appear in the same evidence set. The statistics shot is A5's acceptance artefact: the denominator is on screen, so the number can be checked without opening the database.
6. Division of work and evidence (Nov 25–26)
| Student ID | Member | Sprint sub-task | SP | Closed by Nov 26 | Evidence (Issue → commit) |
|---|---|---|---|---|---|
| 832401202 | 陈文俊 | LF-A1 deployment lead (6) + LF-A8 sprint records (4) | 10 | 10 | #1 → ⟨sha⟩ · runbook re-verification, sprint board |
| 832401216 | 聂迪非 | LF-A2 scan flow and information architecture, design revision | 5 | 5 | #2 → ⟨sha⟩ · SCAN-CODE.md revision |
| 832401220 | 王梓涵 | LF-A2 scan entry UI and prefilled panel design | 4 | 4 | #3 → ⟨sha⟩ · device.html, panel spec |
| 832401227 | 周琰昭 | LF-A2 failure states (4, closed Nov 24) + LF-A4 notification centre front end (collaboration) | 4 | 4 | #4 → ⟨sha⟩ · five failure states; #15 → ⟨sha⟩ · panel, three read-state fixes |
| 832402106 | 黄嘉轩 | LF-A7 usability walkthrough and consistency regression | 8 | 0 | #5 → ⟨sha⟩ · walkthrough checklist v3 (in progress) |
| 832402114 | 刘明泽 | LF-A2 prefilled panel implementation | 5 | 5 | #6 → ⟨sha⟩ · device.js prefill |
| 832401222 | 吴浩宇 | LF-A6 student-side compatibility fixes | 4 | 4 | #7 → ⟨sha⟩ · compatibility matrix, D-2 |
| 832402210 | 靳立一 | LF-A4 notification wording and review prompts | 6 | 6 | #8 → ⟨sha⟩ · wording table, reminder copy |
| 832401204 | 何淞源 | LF-A5 statistics board correction | 6 | 6 | #9 → ⟨sha⟩ · denominator line, 历史/未来 labels, deviceHours |
| 832401224 | 谢宇城 | LF-A3 reservation main-flow integration | 10 | 10 | #10 → ⟨sha⟩ · constraint payload, availability blocks |
| 832401214 | 彭孟欢 | LF-A1 data initialisation (4) + LF-A7 repair-chain regression (4) | 8 | 4 | #11 → ⟨sha⟩ · data init note |
| 832401215 | 刘冉 | LF-A6 responsive and accessibility hardening | 8 | 8 | #12 → ⟨sha⟩ · compatibility matrix, D-1 / D-3 |
| 832402108 | 解皓喆 | LF-A7 multi-device regression and test report | 8 | 0 | #13 → ⟨sha⟩ · 19 cases, TEST-REPORT.md (in progress) |
| 832401109 | 程思扬 | LF-A8 documentation directory and screenshot evidence | 6 | 6 | #14 → ⟨sha⟩ · API.md, ARCHITECTURE.md |
| — | Total | 88 | 72 |
⟨sha⟩ marks the commit short hash to paste from each pull request before publishing; the per-sub-task notes stay in docs/sprint/, one file per sub-task, so every row can be opened and checked.
Notes on the five sub-tasks that closed in this window:
- #8 / #15 (靳立一, 周琰昭) — A4. One component behind two mount points; three read-state defects closed with two guards; the reminder verified at 15 minutes before start, which is A4's first acceptance clause, and the read state verified across a poll, a double click and a second tab, which is the second. A4 is one item with one owner, so its 6 SP sits with the owner; #15 is the traceable evidence for the front-end half, per the plan's rule that a collaborator does not carry a separate share.
- #9 (何淞源) — A5. The denominator and the 历史 / 未来 labels; the formula untouched;
deviceHoursadded so the rate is a function of two numbers the response already contains rather than a number to trust. - #7 / #12 (吴浩宇, 刘冉) — A6. The compatibility matrix and four defects: D-2 and D-4 fixed before the freeze, D-1 and D-3 after it under the blocking rule, fixed by the panel's author and re-checked by the compatibility owner rather than self-approved.
The three rows still open (黄嘉轩 0/8, 解皓喆 0/8, 彭孟欢 4/8) are all A7: the walkthrough, the report, and the repair-chain cases. They are not idle — the walkthrough checklist is on v3 and the 19 cases are on the branch — but SP is counted when the artefact is accepted, not when the work starts, which is the same rule the previous post used for the nine rows that stood at zero on Nov 24.
7. Risks and mitigations (updated on Day 6)
| Risk | Impact | Mitigation |
|---|---|---|
| A badge that is only eventually consistent across two tabs | A demo shows a stale count for up to 60 s | Accepted for this sprint; the panel refreshes on focus, so returning to the tab corrects it; a push channel is an Alpha-to-Beta item, not a sprint item |
| Read state depends on two client-side guards | A future panel that copies the code without the guards reintroduces N-2 | §3.3 (v1.1) names the notification centre explicitly; review item 4 now asks about two entry points for one action |
| A7 compressed into a single day (16 SP) | A thin report, or a freeze reopened | The freeze was executed at 18:00 with only blocking exceptions; Nov 28 stays empty as buffer; the report's backbone (19 cases, 12 steps, 4 defects) already exists |
| Compatibility defects keep appearing after the freeze | Fixes land unreviewed | Blocking definition, PM approval, non-author reviewer; the two post-freeze fixes are listed in this post rather than folded into the log |
| The utilisation number did not change, only its explanation | A reader concludes the fix did nothing | The panel prints the denominator and the mid-week note; the test report states the before/after reading of the same 1.5 approved hours |
| A4 and A5 both touch the teacher page | Two branches editing one file at freeze time | A4 owns ui.js, A5 owns the statistics panel in teacher.js; no shared file between the two, so neither waited on the other |
| 60-second polling from every open browser | Load on a single-process server during the demo | Polling runs only while visible and authenticated, and the timer is cleared on logout; the demo uses two sessions, not fourteen |
8. Next two days (Nov 27–28)
Nov 27 — the regression closes the scope. LF-A7: the 19 cases run against the frozen build on a clean machine, the twelve manual steps executed and recorded, the four defects marked closed with their commits, and TEST-REPORT.md signed. LF-A1 re-verified on a clean checkout, because the Day 2 acceptance rule ("reproducible from the runbook") is cheap to re-run and expensive to assume. In parallel, the summary essay and the defence deck reach first draft, and Sprint Essay 4 is drafted. Expected cumulative: 88 SP, scope complete.
Nov 28 — materials, and nothing else. Full regression on the release candidate; four sprint logs, the testing essay, the summary and the deck finalised; no new code, no new scope. If a blocking defect appears on the 27th, this day absorbs it and the only thing that moves is the wording of the report.
Expected closing: 16 SP on Nov 27 and an intentionally flat Nov 28 — the shape the burn-up chart has been aiming at since Nov 21, reached one day behind Essay 2's forecast and one day inside the plan's window for A7.
9. Appendix — links
| Purpose | Link |
|---|---|
| Repository | https://github.com/YEPM17/LabFlow |
| Sprint board / task index | Issues #1–#16 |
| Membership / essay index | docs/blog/topical-collection.md |
| Scan-code design (revised) | docs/SCAN-CODE.md |
| Notification contract | docs/API.md (Notifications, Statistics) |
| Test report | docs/TEST-REPORT.md |
| Code standard (v1.1, Nov 26) | docs/CODE-STANDARDS.md |
| Previous essay | ⟨URL of the Nov 23–24 post⟩ |
Publishing checklist (not part of the post — delete before publishing):
- Fill the
⟨sha⟩placeholders from Issues #1–#16; the rows already closed on Nov 22–24 keep the hashes used in the earlier posts. - Paste the three screenshots and the optional gif in section 5, then delete the
⟨TODO⟩lines that remain. - Confirm the burn-up numbers with the board before publishing: 48 (Nov 24) → 60 (Nov 25) → 72 (Nov 26), with A7's 16 SP landing on Nov 27.
- Confirm the post number with the group: the folder already holds Essay 1 (Nov 21–22) and Essay 2 (Nov 23–24), so this post is the third in the series, and the plan's table lists it as 冲刺日志 3 (published Nov 26).
- Fill the previous essay's URL in the appendix and add this post's link to
docs/blog/topical-collection.md. - Reconcile A7's share before publishing: the three A7 rows add up to 20 SP against the item's 16 SP, a leftover from the Nov 22 split. Agree the corrected split with 黄嘉轩 / 解皓喆 / 彭孟欢, then the member column will sum to 88 instead of 92.
相关推荐
复现水下航行器(NMPC)非线性模型预测控制分布式轨迹跟踪(Matlab代码实现)
内容概要:本文系统介绍了基于非线性模型预测控制(NMPC)的分布式轨迹跟踪方法在欠驱动水下航行器(AUV/UUV)中的应用,并提供了完整的Matlab代码实现。研究紧密结合水下航行器的动力学特性,综合运用非线性系统建模、分布式协同控制架构与滚动优化策略,实现了复杂海洋环境下的高精度三维轨迹跟踪。核心技术涵盖视线导引(LOS)、反步法控制设计、NMPC实时优化求解以及李雅普诺夫稳定性理论分析,确保控制系统具备良好的动态响应与鲁棒性。文档还整合了大量相关科研方向的仿真复现案例,包括改进蚁群算法路径规划、PID控制、卡尔曼滤波、故障诊断、电力系统优化等,构建了一个面向控制工程与海洋机器人领域的综合性Matlab仿真资源平台,便于多场景算法对比与拓展研究。; 适合人群:自动化、控制科学与工程、海洋工程、机器人学等专业的硕士、博士研究生,以及从事智能控制算法开发、水下机器人系统研发和路径规划研究的科研人员与工程师。; 使用场景及目标:① 深入理解并复现高水平期刊中关于水下航行器轨迹跟踪的先进控制算法;② 掌握LOS导引、反步法、NMPC等非线性控制方法在实际系统中的建模、设计与仿真技巧;③ 利用配套Matlab代码快速完成算法验证与性能测试,支撑科研论文撰写、课题申报与工程项目开发; 阅读建议:建议结合文中列出的参考文献与提供的网盘资料,按照目录结构系统学习各模块内容,重点剖析控制律的设计逻辑与代码实现细节,同时可迁移至无人机、无人船及其他非线性系统的轨迹跟踪问题中进行拓展研究。
印度游戏电竞产业大数据集5000万条记录
本数据集是一套面向印度游戏与电竞生态的大体量分析数据,模拟2021至2026年印度游戏产业的高速增长历程,含5000万条独立玩家记录与11个细分维度列。特征覆盖11个印度邦的玩家人口画像、平台市场份额(安卓与iOS移动端、PC端Steam与Epic平台、PlayStation与Xbox主机、云游戏)、喜爱游戏类型(含BGMI与Free Fire等国民级射击品类、竞技与休闲品类)、付费行为(免费、小额、鲸鱼玩家分层)、游玩时长与活跃度、语言偏好与设备信息等,是观察全球增长最快游戏市场之一的微观数据底座。大体量是其核心特色:5000万行规模可直接用于分布式计算框架(Spark、Dask)的大数据管道练习、数据库索引与分区策略测试、数据采样方法对比,也是检验机器学习工程能力(特征管道、增量训练)的真实压力场景。应用场景:游戏市场研究的用户分层与画像分析、电竞选手与普通玩家行为对比、各邦玩家偏好差异的地理分析、平台与品类的交叉经营指标、大数据课程与竞赛的练习数据。需要说明本数据集为按产业模式生成的合成大数据,用于分析练习而非真实商业决策。数据采用CC0公共领域许可,学习、研究与商业项目均可自由使用,无需署名。
故障诊断用于轴承故障诊断的候选故障频率优化克改进包络频谱研究(Matlab代码实现)
内容概要:本文针对滚动轴承早期微弱故障难以有效识别的问题,提出了一种基于候选故障频率优化的改进包络频谱方法,并配套提供了完整的Matlab代码实现。该方法通过振动信号预处理、包络解调、频带优化选择及理论故障特征频率引导的候选频率匹配机制,强化了传统包络谱中与故障相关的特征成分,抑制了噪声与干扰频率的影响,显著提升了故障特征的可辨识性和诊断准确性。研究系统地涵盖了从信号采集到故障判别的全流程关键技术,包括希尔伯特变换解调、共振频带选取、理论故障频率计算、谱线增强与优化判定准则等,适用于复杂工况下轴承内圈、外圈及滚动体等典型故障的精准诊断。; 适合人群:具备一定信号处理理论基础和Matlab编程能力,从事机械故障诊断、旋转机械状态监测、工业预测性维护等相关领域的研究生、科研人员及工程技术人员。; 使用场景及目标:①实现对轴承早期微弱故障的有效检测与故障类型精准识别;②深入掌握改进包络谱分析、故障特征提取与频谱优化的核心算法原理与实现流程;③为智能制造、工业物联网中的设备健康管理与故障预警系统提供可靠的技术支撑; 阅读建议:建议结合实际采集的轴承振动数据进行代码调试与结果对比分析,深入理解各算法模块的设计意图,并尝试将该方法迁移应用于齿轮箱、电机等其他旋转机械的故障诊断任务中,进一步拓展其工程应用价值。
政府搭建区域技术转移示范机构管理系统有哪些推荐方案?.docx
政府搭建区域技术转移示范机构管理系统有哪些推荐方案?
电池可重构电池系统中的结构分析用于主动故障诊断研究(Matlab代码实现)
内容概要:本文围绕可重构电池系统中的结构分析开展研究,旨在通过Matlab代码实现主动故障诊断方法的开发与验证。文章深入剖析了可重构电池系统的拓扑结构与运行机理,采用结构分析法识别系统内的冗余路径与可重构单元,进而设计高效的主动故障诊断策略。通过建立系统的结构模型,并结合故障注入实验与仿真分析,系统验证了该方法在精确定位电池单体故障、识别开关状态异常等方面的优越性能。研究涵盖了系统结构性质的数学建模、故障可检测性与可隔离性理论分析,以及基于结构残差的故障诊断逻辑设计,最终利用Matlab完成了完整的诊断算法编程实现与仿真测试。; 适合人群:具备电力系统、电池管理系统或故障诊断领域基础知识,熟练掌握Matlab编程语言,从事新能源技术、储能系统安全或系统可靠性研究的研究生、科研人员及工程技术人员。; 使用场景及目标:①深入研究可重构电池系统的故障诊断机制,提升储能系统的安全性与运行可靠性;②学习并掌握利用结构分析方法进行系统可观性与可诊断性评估的专业技能;③掌握基于Matlab的故障注入、系统仿真建模与故障诊断算法实现的全流程技术。; 阅读建议:读者应结合提供的Matlab代码逐模块理解结构建模与诊断逻辑的具体实现,重点关注系统结构矩阵的构建方法、结构残差的生成机制与故障判据的设计原理,并鼓励通过修改系统拓扑结构或设置不同的故障模式进行拓展性实验,以深化对诊断方法鲁棒性与适应性的理解。


