Falcons — Sprint Log 3 (Day 5–6)
Falcons — Sprint Log 3 (Day 5–6)
| Item | Content |
|---|---|
| Course | EE308FZ Software Engineering — CSDN community 2601_FZU-MU_SE |
| Assignment Requirement | Fifth Assignment — Alpha Sprint |
| Team Name | Falcons (Group 12) |
| Project | Sports Buddy — a sports matchmaking platform for university students |
| Sprint | 2026-11-21 to 2026-11-28 (8 days) |
| This log covers | Day 5–6 (2026-11-25 to 2026-11-26) |
| Sprint goal | A runnable Alpha core flow: login → discover → create/join an activity → check in → review |
Contents
- Sprint Overview
- Burn-up Chart
- Completed This Period
- Running Evidence
- Code Check-ins
- Testing Results
- Problems and Solutions
- Plan for Next Period
1. Sprint Overview
- Total scope: 63 story points across 16 GitHub Issues (#4–#19)
- Completed so far: 23 points — S2 profile (3), S4 activity list (5), S6 join/cancel (5), S12 credit rules (5), S15 DEF-01 fix (3), S16 demo environment (2)
- Remaining: 40 points
- Issue status: 6 closed (#5, #7, #9, #15, #18, #19); 10 open
- This period: the activity-list work (Issue #7), the join/cancel flow (Issue #9), the DEF-01 concurrency fix and the demo environment were completed.
2. Burn-up Chart

| Date | Planned remaining | Actual remaining | Completed |
|---|---|---|---|
| 11/21 (Day 1) | 55 | 63 | 0 |
| 11/22 (Day 2) | 47 | 55 | 8 (S2 + S12) |
| 11/23 (Day 3) | 39 | 55 | 0 |
| 11/24 (Day 4) | 32 | 55 | 0 |
| 11/25 (Day 5) | 24 | 55 | 0 |
| 11/26 (Day 6) | 16 | 40 | 15 (S4 + S6 + S15 + S16) |
3. Completed This Period
| Task | Owner | Issue | Evidence | Status | Points |
|---|---|---|---|---|---|
| S4 Activity list + filters | Zhang Jingtian, Li Zhenhao (PR by Haoze Li) | #7 | 29ec193, 55bacea, PR #23 | Completed (merged) | 5 |
| S6 Sign up / cancel sign-up | Zhang Jingtian, Li Zhenhao (frontend by Haoze Li) | #9 | 0e0c5e4, 00a89eb | Completed (merged) | 5 |
| S15 Bug-fix buffer (DEF-01) | Zhang Jingtian (zhangjt123) | #18 | 939e9f6 | DEF-01 fixed and retested | 3 |
| S16 Demo environment / deployment | Xu Boyu (zhangjt123) | #19 | 8a9b032 | Completed (seed + docs) | 2 |
| S8–S11 Acceptance coverage | Backend group (zhangjt123) | #11–#14 | 1313155, acafe56, 5e970e2, 326c7dc | Verified (13 acceptance cases) | — |
| S14 Automated E2E + test report | Wang Shaojie (060725) | #17 | test report | In progress — UI E2E pending | — |
What was delivered
- Issue #7 activity list: pagination, combined filters, timezone fix, stale-response guard, 320 px layout guard.
- Issue #9 join / cancel: real-backend sign-up and cancellation; full-capacity and credit-below-60 guards; late-cancel confirmation; frontend credit constants aligned with the backend (80 / +2 / −10 / −2).
- DEF-01 concurrency fix:
BEGIN IMMEDIATEtransaction + capacity re-check under the lock + unique constraint onregistrations(activity_id, user_id). The 12-thread probe now returns 2 × 201, 10 × 409, joined_count = 2, exit code 0. - Demo environment: idempotent seed script (3 demo accounts, 3 activities, 2 registrations), Docker/Render instructions.
- Acceptance coverage for check-in (#11), attendance (#12), my activities (#13) and reviews (#14): 13 new cases.
4. Running Evidence

Sign-up succeeds: places 6 → 5, the user appears in the participant list.

Credit below 60: the join button is disabled with a reason, backend returns 403 as a fallback.

Cancelling within 2 hours: confirmation dialog states that 2 credit points will be deducted.

Activity list after the Issue 7 merge: cards, filters and “load more”.
5. Code Check-ins
| Member | Commit | Issue | Link |
|---|---|---|---|
| JorgeHUANG7 (merge) | feat(activity-list): wire P-03 to GET /activities with filters (#7) | #7 | 29ec193 |
| Haoze Li | docs(issue7): add Issue 7 activity-list delivery package (#7) | #7 | 55bacea |
| Haoze Li | feat(join): sync credit rules and wire join/cancel to real backend (#9) | #9 | 0e0c5e4 |
| zhangjt123 | test(activity): add Issue 9 join/leave acceptance coverage (#9) | #9 | 00a89eb |
| zhangjt123 | fix(activity): serialize join to close DEF-01 oversubscription race (#18) | #18 | 939e9f6 |
| zhangjt123 | test(activity): add Issue 11 check-in acceptance coverage (#11) | #11 | 1313155 |
| zhangjt123 | test(activity): add Issue 12 attendance acceptance coverage (#12) | #12 | acafe56 |
| zhangjt123 | test(activity): add Issue 13 my-activities acceptance coverage (#13) | #13 | 5e970e2 |
| zhangjt123 | test(activity): add Issue 14 reviews acceptance coverage (#14) | #14 | 326c7dc |
| zhangjt123 | feat(ops): add demo seed script and deployment instructions (#19) | #19 | 8a9b032 |
| JorgeHUANG7 | style(test): fix ruff issues in race_probe (#17) | #17 | ab916bd |
6. Testing Results
| Check | Result |
|---|---|
| Backend pytest (full) | 76 / 76 passed |
| DEF-01 concurrency probe | Fixed: 2 × 201, 10 × 409, joined_count = 2, exit code 0 |
| Frontend verify | 161 / 161 passed (140 → 161, section H adds 21 assertions) |
| Credit-rule constant guard | H0 locks frontend constants to the backend (80 / 2 / 10) |
| 320 px overflow | scrollWidth == innerWidth == 320 |
ruff check . | race_probe issues fixed (ab916bd) |
7. Problems and Solutions
| Problem | Solution | Status |
|---|---|---|
| DEF-01: concurrent sign-ups over-booked a capacity-2 activity (5–9 joined) | BEGIN IMMEDIATE + re-check under lock + unique constraint; probe now returns exactly 2 × 201 and 10 × 409 | Fixed |
| Frontend credit rules lagged the backend (UI said “−5”, backend deducted −2) | aligned domain.js / mock to 80 / +2 / −10 / −2 and added H0 guards | Fixed |
| Issue 7 list ended early / “today” filter empty / stale responses | client-side availability filter, naive-UTC dates, request token | Fixed |
race_probe.py had 2 ruff issues (RUF002, UP017) | docstring punctuation and datetime.UTC fixed | Fixed |
| S13 reminders (#16) not started | carried to Day 7–8 | Open |
| S14 UI E2E (login → review) not yet automated | carried to Day 7, testing group | In progress |
| Frontend screenshots for #11 / #12 (check-in, attendance) not yet captured | frontend group to add | Open |
8. Plan for Next Period
- Finish the UI E2E (login → review) for S14 and publish the testing essay (11/27)
- Implement/verify S13 reminders (#16); add frontend screenshots for #11 / #12
- Complete S10 my activities (#13) and S11 reviews (#14) frontend acceptance
- Run the demo environment with the seed script; verify the demo accounts
- Publish Sprint Log 4 (Day 7–8) and start the sprint summary
- Next log: 2026-11-28
相关推荐
AI实验追踪系统:从日志归档到因果可溯的工程实践
AI实验追踪不是简单的指标记录,而是构建模型研发全链路因果可溯能力的核心基础设施。其本质在于统一管理代码版本、数据指纹、超参数配置、运行环境与评估指标五大维度,解决因信息割裂导致的复现失败、协作低效与审计失焦等共性问题。技术价值体现在提升实验复现率、压缩验证周期、支撑自动化模型注册与合规溯源。典型应用场景覆盖机器学习迭代优化、多团队协同建模、金融风控模型上线审计及AI研发效能度量。本文基于MLflow生产级落地经验,深入解析如何将实验追踪从‘能用’升级为‘可信、可管、可审’的AI工程中枢。
DeepSeek V4工程落地指南:长上下文推理与私有化部署实战
大语言模型推理引擎正从通用能力竞争转向生产级工程效能比拼。长上下文支持、KV cache压缩、硬件亲和性优化已成为企业AI系统稳定性和成本控制的核心指标。DeepSeek V4通过CSA/HCA注意力机制与mHC流形约束技术,将百万token推理的显存占用降低90%,使单卡并发能力跃升数倍,真正实现高吞吐、低延迟、可私有化部署的工业级推理范式。其MIT开源协议与OpenAI兼容接口,大幅降低迁移门槛,适用于代码审查、知识库问答、边缘代码补全等典型场景,为预算受限但追求确定性的AI工程团队提供了一条平滑、可控
四旋翼无人机模糊自适应PID控制,俯仰姿态控制律设计研究(Matlab代码、Simulink仿真实现)
内容概要:本文围绕四旋翼无人机的俯仰姿态控制问题,深入研究了模糊自适应PID控制律的设计与实现。通过结合模糊逻辑系统的自适应能力与传统PID控制器的稳定性,构建了一种能够在复杂动态环境中有效应对外部扰动和模型不确定性的先进控制策略。研究详细阐述了控制系统的结构设计、模糊规则库的建立、隶属度函数的选取以及PID参数的在线调整机制,并利用Matlab/Simulink工具进行了完整的建模与仿真实验,验证了所提方法在响应速度、超调量和抗干扰能力等方面相较于传统PID控制的显著优越性。; 适合人群:具备自动控制理论基础和Matlab/Simulink仿真经验的自动化、航空航天及相关专业的本科生、研究生及科研人员。; 使用场景及目标:①学习和掌握模糊自适应PID控制器的设计原理与方法;②研究无人机姿态控制算法的性能提升途径;③完成相关课程设计、毕业设计或科研项目的仿真验证工作。; 阅读建议:建议读者结合Matlab代码与Simulink模型,深入理解控制算法的实现细节,并尝试调整系统参数和仿真条件,以探究不同因素对控制性能的影响,从而达到理论与实践相结合的学习目的。
复现基于李雅普诺夫的多个欠驱动无人船协同路径跟踪Matlab仿真
内容概要:本文详细介绍了基于李雅普诺夫稳定性理论的多个欠驱动无人船协同路径跟踪控制方法的Matlab仿真研究。通过建立非线性动力学模型,设计分布式协同控制器,并利用李雅普诺夫函数严格证明系统的渐近稳定性,实现了多艘无人船在复杂海洋环境下的高精度路径跟踪与稳定编队保持。文中系统阐述了控制器的设计原理、稳定性分析过程、仿真参数配置及多种典型场景下的仿真实验结果,充分验证了该方法在提升编队协同性、抗外部干扰能力和鲁棒性方面的显著优势。; 适合人群:具备自动控制理论、非线性系统分析基础以及Matlab/Simulink仿真能力的研究生、科研人员,以及从事无人系统、船舶自动化、多智能体协同控制等领域研发工作的工程师。; 使用场景及目标:①用于多智能体系统协同控制算法的研究与教学示范;②为欠驱动船舶的路径跟踪控制、海上集群航行等实际工程应用提供可靠的算法设计思路与仿真验证平台;③支撑相关领域高水平论文撰写、科研项目申报与关键技术攻关。; 阅读建议:建议读者结合提供的Matlab代码逐模块研读,重点关注李雅普诺夫函数的构造技巧与控制器参数的整定方法,并尝试在不同环境扰动(如海流、风浪)下进行仿真实验,以深入理解系统的鲁棒性与适应性。
Vivado FPGA 工程模板:参数化消抖、PWM 与 XDC 约束
这份工程模板解决 FPGA 起步阶段的工程骨架与踩坑问题。含可综合的参数化按键消抖(两级同步消亚稳态)、参数化 PWM(0/满占空比边界修复)、顶层呼吸灯示例、XDC 时钟与 IO 约束模板、Tcl 一键建工程脚本。面向 STM32 开发者向 FPGA 扩展,换 Artix-7/Kintex/Zynq 只需改器件与引脚。


