Group2_Fubangbang_Alpha Sprint 4
Fubangbang Alpha Sprint 4 Final Regression and Delivery Verification
| Item | Details |
|---|---|
| Course | EE308FZ Software Engineering |
| Assignment requirements | Fifth Assignment Alpha Sprint |
| Team | Group 2 — Fubangbang |
| Sprint reporting period | November 27–28, 2026 |
| Sprint objective | Verify the final Alpha workflows, produce a reproducible local delivery and consolidate acceptance evidence. |
| Project repository | RederChen/fubangbang-alpha |
| References | Alpha task register, Sprint 3 source baseline, final regression results, delivery manifests, startup guide and runtime screenshots. |
1 Sprint Objective and Starting Point
Sprint 3 extracted product-cover handling into a dedicated Vue composable and verified its integration with publication, drafts and editing. Sprint 4 takes that application as its starting point and checks whether the selected version can be installed, built, started and demonstrated from an independent directory.
This sprint contains three engineering tasks: A10, final regression; A11, delivery build and startup verification; and A12, evidence and archive consolidation. All three are accepted, bringing the sprint to 3/3 and the Alpha engineering plan to 12/12.
The main work concerns reproducibility and delivery integrity. A working development directory can contain dependencies, private settings and older build outputs that hide installation or packaging problems. We therefore verified a fresh source export as well as the existing repository.
2 Work Completed During the Sprint
| Task | Work completed | Acceptance evidence |
|---|---|---|
| A10 | Run the final title, cover, backend and full-browser regression; add fresh-login persistence and detail-request recovery checks. | 21 final-regression acceptance groups passed, with logs, structured results and original screenshots. |
| A11 | Correct source selection and packaging for the current repository, add a compiled local startup entry and reproduce installation in a fresh directory. | Five delivery acceptance groups passed, including matching builds and persistence across restarts. |
| A12 | Consolidate source, compiled assets, startup instructions, test records and screenshot references into the final archive. | Two consolidation acceptance groups passed; manifests and archive integrity were verified. |
The 28 acceptance groups are verification groupings within the three tasks. They are separate from individual test-case counts.
2.1 Delivery Implementation
| File | Responsibility |
|---|---|
scripts/delivery_source.py | Select and fingerprint source from the parent repository or a verified standalone export; validate the matching compiled files. |
scripts/build_release.js | Record the selected source and compiled-file hashes; detect source changes during a build. |
scripts/package_delivery.py | Package one matching source/build set and verify the resulting ZIP. |
scripts/start_delivery.js | Start the compiled frontend and API together for local SQLite demonstration. |
package.json | Provide the npm run start:delivery entry. |
scripts/test_delivery_source.py | Check source/export integrity, invalid paths, settings selection and stale or mismatched builds. |
DELIVERY.md and README.md | Explain installation, development startup, compiled startup, persistence and packaging. |
These changes comprise four modified and four added delivery-related files. The title validation and cover extraction from the previous sprints remain part of the selected application. Frontend views, backend application logic and dependency lock files were unchanged during this delivery step.
2.2 Installation and Local Startup
From the extracted application directory, install the frontend and backend dependencies:
npm ci --no-audit --no-fund
npm run setup:backend
For development:
npm start
The frontend runs at http://127.0.0.1:5173/, with the API at http://127.0.0.1:8000/.
For the packaged compiled version:
npm run start:delivery
The compiled frontend, API and uploaded covers share http://127.0.0.1:8080/. This entry uses local SQLite and is suitable for local verification and classroom demonstration. The separate production startup entry retains its PostgreSQL requirements.
Product data is stored in backend/data/campuslink.db, and uploaded files are stored in backend/data/uploads/. Restarting from the same directory preserves these files and the corresponding product records.
3 Verification and Running Images
Verification used Windows, Node.js 24.19.0, npm 11.17.0, Python 3.13.12 and Microsoft Edge. Tests used isolated SQLite databases, disposable accounts and separate upload storage. Original execution timestamps remain in the evidence records; November 27–28 is the sprint reporting window.
3.1 Recorded Results
| Check | Result |
|---|---|
| Frontend type check and asset build | Passed |
| Final-regression backend suite | 158 passed, 3 skipped, 0 failed |
| Title API/browser checks | 15 passed |
| Focused cover browser checks | 14 passed, including the page-error check |
| Isolated cover-module checks | 10 passed |
| Existing full-browser regression | 16 scenario groups passed |
| Additional fresh-login persistence check | Passed |
| Additional product-detail interruption and Retry checks | Passed |
| Fresh frontend/backend installation and Python dependency consistency | Passed; no broken Python requirements |
| Repository build and independent export rebuild | Passed; all 61 compiled-file hashes matched |
| Fresh-environment backend suite | 158 passed, 3 skipped, 0 failed |
| Fresh delivery integrity and deployment-entry checks | 12 integrity checks and 4 deployment-entry checks passed |
| Full-browser regression against the compiled delivery | 16 scenario groups passed |
| Final acceptance matrix | 28/28 groups passed |
Repeated suites are listed separately rather than added into a larger pass total. The three skipped backend cases require PostgreSQL concurrency or migration behavior. An existing Starlette/httpx deprecation warning was recorded. The database results above apply to the tested SQLite environment.
3.2 Core Workflows and Recovery
The final regression covered account access, title validation, cover handling, draft restoration, publication and editing, transaction workflows, forum pages and notifications. It also checked whether saved product data remained available after a fresh login.

Figure 1. The saved title, price and uploaded cover remain available after a new login.

Figure 2. The transaction flow reaches completion. The browser assertions also verify buyer agreement and the product's SOLD state.
We deliberately interrupted a product-detail request to verify the error state and its Retry action. Retrying then retrieved the saved product through the real API.

Figure 3. The interface provides an actionable recovery state after the simulated network interruption.

Figure 4. The recovery check confirms that the product data and image load successfully.
3.3 Fresh Installation and Restart Persistence
The independent reproduction directory started without copied dependencies, private settings, databases or Git metadata. After installing the locked dependencies, we rebuilt the application and compared its compiled files with the repository build. All 61 file hashes matched.
A product was then published through the fresh development entry. The service was stopped and restarted using the compiled delivery entry, and the same product was retrieved. A second compiled startup checked persistence again. The assertions covered the title, CNY 19.80 price, cover URL and image bytes.

Figure 5. Publication succeeds with a real uploaded cover in the independent installation.

Figure 6. Switching to the compiled local entry preserves the product and its cover.

Figure 7. The product remains readable after another restart; persisted fields and image bytes are verified by the test results.
4 Problems Resolved and Implementation Decisions
| Finding | Treatment | Result |
|---|---|---|
| The old packaging logic assumed independent frontend and backend Git repositories. | Select source from the current parent repository, with a verified export path for standalone delivery. | Packaging works with the project's current single-repository structure and without Git in the extracted directory. |
| Build metadata could fail to identify the parent repository. | Record the real parent commit together with the hash of the selected source files. | The manifest identifies the actual source snapshot used for the build. |
| Old compiled assets could be mixed with newer source. | Check source and compiled-file hashes against the build manifest before packaging and compiled startup. | Stale or mismatched source/build combinations are rejected. |
| A successful developer setup did not establish independent reproducibility. | Install dependencies and rebuild in a fresh directory. | The independent build matches the repository build and passes the recorded checks. |
| Restart behavior needed evidence beyond a successful first startup. | Publish data, switch startup entries and restart the compiled service again. | Saved product fields and uploaded image bytes persist. |
The delivery records distinguish the parent Git commit from the selected source snapshot. A source fingerprint identifies the actual files used even when the working tree contains local changes. The exported source manifest then allows that snapshot to be checked after extraction without requiring Git.
The application package contains the selected source, its matching compiled site and startup instructions. Dependencies, private settings, databases, caches and older release outputs are excluded. This makes the delivery reproducible while allowing each installation to create its own local data.
5 Burn Up Charts and Scope
The charts use November 27–28 as reporting checkpoints. November 27 represents the opening accepted-task balance, and November 28 represents the closing balance. The two points summarize acceptance status rather than measured daily effort. Each engineering task has equal weight.
5.1 Sprint 4 Three of Three Complete

Figure 8. A10, final regression; A11, delivery verification; and A12, evidence consolidation are accepted: 3/3, or 100%.
5.2 Alpha Engineering Plan Twelve of Twelve Complete

Figure 9. Sprint 4 adds three accepted tasks to the opening balance of nine, reaching 12/12, or 100%.
| Task range | Work | Status |
|---|---|---|
| A01–A04 | Environment reproduction, existing checks, core-flow acceptance and issue investigation | Complete |
| A05–A07 | Title contract, implementation and regression verification | Complete |
| A08–A09 | Cover responsibility extraction and affected-flow acceptance | Complete |
| A10–A12 | Final regression, delivery verification and evidence consolidation | Complete |
Chart preparation, blog writing and repository submission are reporting activities outside the three engineering tasks. The 12/12 result refers to the agreed Alpha engineering task register.
6 Code Archive and Group Contributions
The project repository is the team's code entry point. The prepared Sprint 4 delivery follows the previous sprint's archive format:
source/CampusLink/
src/
backend/
scripts/
DELIVERY.md
README.md
SOURCE-MANIFEST.json
.releases/
docs/sprints/sprint-4/
README.md
01-implementation.md
02-automated-checks.md
03-browser-acceptance.md
04-issue-review.md
STARTUP-GUIDE.md
SCREENSHOTS.md
screenshots/
evidence/
The selected application delivery contains 207 source files and 61 compiled files. Its manifests connect the source snapshot to the tested build. The complete final archive also retains the earlier sprint records and includes the final acceptance results, original runtime images, test logs and file-integrity records.
The following team-reported allocation retains the group proportions used in the previous sprints.
| Group | Members | Main contributions | Share |
|---|---|---|---|
| Frontend and Backend | Chen Jiayuan, Chen Haoyang, Chen Junjie, Zhu Chaoyang, Zhou Qican, Zhu Mingqian | Delivery-script implementation, source/build verification, startup integration, regression coordination and final code/archive organization, led by Chen Jiayuan and Chen Haoyang. | 60% |
| UI and Presentation | Ye Jiahui, Zhang Sufang, Chen Zhijun, Wu Sifan | Sprint and overall burn-up chart presentation, progress-label checks, screenshot captions and blog layout. | 25% |
| Testing and Execution Support | Chen Mohan, Chen Wei, Zeng Wenhan, Zheng Bowei | Organization and review of regression results, fresh-installation records, restart evidence, runtime screenshots and acceptance references. | 15% |
| Total | 14 members | 100% |
Chen Jiayuan and Chen Haoyang take lead of the whole sprint. The table retains group-level percentages rather than assigning individual percentages. Test execution and browser capture used automated tool assistance; the testing entries concern result organization and review.
7 Sprint Review and Alpha Engineering Outcome
Sprint 4 completes the Alpha engineering plan by connecting functional verification to a reproducible delivery. The previous title-validation and cover-refactoring changes remain covered by regression checks, and the selected application can be installed and started from a fresh directory using the documented local entries.
The main lesson from this sprint is that build success and delivery success require different evidence. A production build establishes that assets can be generated; a fresh installation, matching-file verification and repeated startup establish that another person can use the selected package and retain its data.
The final result is 3/3 accepted Sprint 4 tasks, 28/28 acceptance groups and 12/12 accepted Alpha engineering tasks. The consolidated records provide the material for the testing essay, overall sprint summary and final presentation. Public deployment remains a separate activity from the verified local delivery described here.
相关推荐
复现基于量化状态反馈+非线性自适应神经控制的反馈系统(不确定MIMO)仿真(Matlab代码实现)
内容概要:本文介绍了一种结合量化状态反馈与非线性自适应神经控制的先进控制策略,用于解决不确定多输入多输出(MIMO)反馈系统的建模与控制问题,并基于Matlab平台实现了完整仿真。该方法利用神经网络逼近系统内部不确定性,融合量化反馈机制以增强系统鲁棒性与自适应能力,有效应对模型不精确、外部扰动等复杂工况,适用于高精度控制场景。文章强调科研需兼具严谨逻辑与创新思维,提供从理论推导到代码实现的完整学习路径,并配套丰富的仿真资源与技术文档,帮助读者系统掌握先进控制算法的设计与应用。; 适合人群:具备自动控制理论基础、神经网络初步知识及Matlab编程能力,从事控制工程、系统科学、机器人、自动化或相关领域的研究生、科研人员及工程技术人员。; 使用场景及目标:①研究不确定MIMO系统的稳定性与控制性能优化;②掌握自适应神经控制与量化反馈的集成设计方法;③应用于机器人控制、飞行器导航、工业过程控制等高精度动态系统控制场景; 阅读建议:建议结合提供的网盘资料(含代码与文档)与公众号“荔枝科研社”资源,按照目录顺序系统学习,注重理论分析与仿真实践相结合,通过动手复现算法深入理解其动态响应特性、收敛机制与鲁棒性能表现。
西周BC996年世界历史地图矢量文件SHP格式.zip
本资源为《西周BC996年世界历史地图矢量文件SHP格式》压缩包,文件大小约 28.70 MB,便于集中下载、整理和使用。具体内容请结合压缩包内的实际文件与说明查看。 在当前可读取的目录中,可见属性表(.dbf)、投影说明文件(.prj)、Shapefile 主文件(.shp)、Shapefile 索引(.shx)。建议解压后保持原有目录结构,先浏览文件清单与说明,再选择需要的资料进行加载或整理。 应用方面,可根据实际资料用于学习练习、资料检索、研究整理或项目参考。使用时可先确定所需内容,建立清晰的文件分类,再按项目要求进行筛选、转换与汇总。 使用 Shapefile 数据时,请把实际配套的 .shp、.shx、.dbf 等文件保存在同一目录,并保持同名关联;加载后再检查坐标系与中文字段显示。如需叠加其它数据,请先统一坐标与字段口径。 数据来源、时间范围、坐标系、字段定义、精度和使用条件,请以实际文件及原始说明为准。本介绍不对文件名之外尚未核实的信息作额外承诺。
智慧工业园区AI大模型数字化平台建设方案.docx
智慧工业园区AI大模型数字化平台建设方案.docx
基于 SpringBoot、Vue、Mybatis、RabbitMq、Mysql、Redis 等开发的轻量级的物联网综合业务支撑平台 支持物联网卡、物联网模组、卡+模组融合管理
基于 SpringBoot、Vue、Mybatis、RabbitMq、Mysql、Redis 等开发的轻量级的物联网综合业务支撑平台。支持物联网卡、物联网模组、卡+模组融合管理。提供状态、资费、客户、进销存、合同、订单、续费、充值、诊断、账单等功能。平台可同时接入中国移动、中国电信、中国联通、第三方物联网卡进行统一管理。逐步完善平台,助您快速接入物联网,让万物互联更简单。
西周BC845年世界历史地图矢量文件SHP格式.zip
本资源为《西周BC845年世界历史地图矢量文件SHP格式》压缩包,文件大小约 24.44 MB,便于集中下载、整理和使用。具体内容请结合压缩包内的实际文件与说明查看。 在当前可读取的目录中,可见属性表(.dbf)、投影说明文件(.prj)、Shapefile 主文件(.shp)、Shapefile 索引(.shx)。建议解压后保持原有目录结构,先浏览文件清单与说明,再选择需要的资料进行加载或整理。 应用方面,可根据实际资料用于学习练习、资料检索、研究整理或项目参考。使用时可先确定所需内容,建立清晰的文件分类,再按项目要求进行筛选、转换与汇总。 使用 Shapefile 数据时,请把实际配套的 .shp、.shx、.dbf 等文件保存在同一目录,并保持同名关联;加载后再检查坐标系与中文字段显示。如需叠加其它数据,请先统一坐标与字段口径。 数据来源、时间范围、坐标系、字段定义、精度和使用条件,请以实际文件及原始说明为准。本介绍不对文件名之外尚未核实的信息作额外承诺。


