Group9 Alpha Sprint Summary: Planned Work, Delivery and Lessons
| Item | Details |
|---|---|
| Course | EE308FZ |
| Assignment | Fifth Assignment — Alpha Sprint |
| Objective | Compare the plan with submitted work, explain each member's contribution and learning, and define the next iteration |
| References | 48-task completion report, Completion ledger, Acceptance ledger, Workload intake ledger |
This final sprint summary records the team's outcomes anchored on repository head 20f615665f56b69d3ff15607e2c2881c64107f00. All 48 period tasks across 12 members reached Completed status on their GitHub submission dates by November 27 (0 remaining on November 28). Named peer sign-offs beyond local acceptance, live cloud triggers, and real-device tests remain tracked separately below.
Contents
- 1. What we planned
- 2. Actual progress
- Native runtime verification snapshots (offline simulator)
- 3. Development and testing changes
- 4. Individual contributions and learning
- Xiang Hong — integration, freeze verification and release handoff
- Yifan Ji — records and recovery
- Zhifeng Dai — consistent views and stale responses
- Linghan Chen — account, sharing and file interface
- Jiaqi Zhu — native presentation and visual findings
- Qinghan Zhang — campus page and task round trips
- Junhan Huang — campus service and lifecycle seams
- Jiawei Fang — task service and account state
- Qizhen Chen — Page behaviour under uncertain outcomes
- Xiang Yu — export and maintenance
- Yuen Lin — regression and package provenance
- Qizhen Cai — independent boundaries and evidence correction
- 5. Collaboration and workload distribution
- 6. Remaining conditions and next iteration
1. What we planned
Our starting point was v0.5.2 / 5b2775393a4adbf5d9a77ff2a3c61b3c3bb3958c. The product already had private weather records, reviews, tasks, campus places and account/data operations. The Alpha plan assigned twelve members 24 final acceptance units and asked each member to complete deliverables across four two-day periods (48 equal-weight period tasks).
The intended improvement was reliable behaviour across real user sequences: saving and reopening a record, returning from a task destination, retrying an uncertain operation, switching accounts while work is pending and following export/deletion through its actual states. We also planned to connect submissions, code, tests, native views and packages so a reviewer could reproduce the candidate.
2. Actual progress
| Planned area | Evidence now available | Difference or unfinished condition |
|---|---|---|
| Records and reviews | Seven-weather inputs; saving/reopening; four-view comparisons; edit/delete and stale-response tests | Device/cloud confirmation and named final sign-off remain separate |
| Tasks and campus | Mode/action matrices, current service validation, explicit completion, campus replay/paging and native right-side selection | Frozen candidate uses closed tasks and paused new check-ins; enabled previews are separate |
| Identity and privacy | Explicit empty-account re-registration; server-side account boundaries; WeChat-only first-use registration in the selected candidate | Two-WeChat physical-device login and current platform/privacy/UGC status remain external checks |
| Export and cleanup | JSON/Markdown samples, owner/revision/expiry checks, 11-batch cleanup (30 rows completed), 6 expired audit residue records and B/public preservation | Actual PC-save / mobile-receive delivery, live cloud G1 triggers and snapshot mapping remain external |
| Integration and reproducibility | Reviewed increments (PR #257–#275), exact C3/C4 manifest matches (193 hashes), asserted evidence tools and 48-task receipt ledger | Designated independent reviews beyond AS-YF01/AS-YF02 (2/24 local) remain tracked separately |
| Sprint documentation | Complete eight-article Alpha sprint blog series, simulator screenshots, burnup/burndown charts and test-case sheet | Final collection indexing and Beta-phase documentation updates |
The selected product candidate is 0.5.3 / 00c59a1af7ccd27e9c2ae4bc77f6b65fc66b117c. All documentation, ledger, chart and verification integrations through PR #275 (20f615665f56b69d3ff15607e2c2881c64107f00) leave the product tree (miniprogram/, cloudfunctions/, database/) unchanged. The frozen candidate uses tasks closed, paused new campus writes and phone login disabled.
Across all four sprint periods (PR #274), all 48 period tasks across 12 members reached Completed status (0 remaining) on their respective GitHub PR or push submission dates ([20, 29, 39, 48, 48] at the period cutoffs, with the final member deliverable received on November 27 at 19:46:21 +08:00 and no remaining tasks on November 28). Cross-period organization, review, and integration work belongs separately to Xiang Hong without shifting member submission dates. These 48 completion dates track member delivery receipts, separate from independent acceptance (AS-YF01 and AS-YF02 locally accepted by Yuen; the remaining 22 units remain tracked separately).

Figure 1. MoodSky Alpha burnup chart showing cumulative completed member tasks rising from 3 (Start) to 9 (Nov 21), 20 (Nov 22), 22 (Nov 23), 29 (Nov 24), 34 (Nov 25), 39 (Nov 26), and 48 / 48 (Nov 27–28).

Figure 2. 12×4 sprint completion matrix generated from completion-details-48.csv, showing all 48 / 48 completed checkpoints by GitHub submission date alongside the ~183.5-hour workload allocation (~39.5h logged actual effort across 3 members plus 144h standard sprint baseline across 9 members) and the separate 24-unit acceptance ledger.
Native runtime verification snapshots (offline simulator)

Figure 3. November 22 WeChat Developer Tools simulator capture showing the seven-weather Today entry in local demo mode.

Figure 4. Zhifeng's November 22 simulator capture (cloudEnabled=false, journalDemo=true) displaying the October 2026 monthly calendar with five synthetic records and privacy notice.

Figure 5. November 27 simulator capture of frozen candidate 00c59a1 showing WeChat login and first-use automatic registration (cloudEnabled=false).
3. Development and testing changes
The sprint addressed concrete gaps rather than adding features only to increase commit counts. Jiawei corrected a visible-but-unselectable task-template boundary. The account lifecycle was changed, at the owner's request, to permit explicit re-registration of an empty account without restoring old data. Local A/B support was provided when the one-WeChat/one-account flow prevented useful targeted isolation testing from the UI alone.
On November 26 the team prepared a phone-login candidate and associated deployment/configuration handling. The app could not enable that platform capability, so on November 27 we selected the existing WeChat identity route as the main entry, with first-use registration. This avoided making an unavailable phone interface a prerequisite for basic account access. The phone candidate's old screenshots and tests remain historical evidence, not the current advertised route.
The maintainer also corrected evidence tooling: linked-worktree Git source resolution, actual generation timestamps and assertions before a report labels a scenario PASS. Those are reporting/tool changes, not new product features. A historical C3 package was reproduced exactly using its own script; the current candidate's manifest matches Yuen's independently assembled one byte for byte.
The frozen product suite has 1730 tests. The report/tool integration adds three negative regressions and passes 1733/1733 tests on November 28 (0 failed/cancelled/skipped). Additional recorded runs include 43/43 and 178/178 directed tests, A/B 16/16, export-access 64/64, 14/14 lifecycle scenarios (137 assertions, 11-batch derived cleanup removing 30 rows to completed), and 8 offline production groups. Because targeted module suites overlap with the full regression suite, they are reported separately rather than summed.
4. Individual contributions and learning
Below we summarize each member's main contributions, technical takeaways, and sprint effort across the four periods.
Xiang Hong — integration, freeze verification and release handoff
Xiang Hong reviewed member increments against current main, preserved interface and account safeguards, fixed candidate scope and compiled the release and course handoff (xiang-hong-integration-work.md). Reflecting on the sprint, Xiang Hong noted that keeping twelve members' parallel branches traceable required verifying merge-base, net diff and byte-for-byte preservation before adopting increments, rather than overwriting current safeguards with older member baselines. Reproducing the historical C3 manifest with its own packager confirmed that reproducible builds depend on both the source commit and packager version, while pivoting cleanly to WeChat-only first-use login and tightening evidence assertions prevented unavailable platform capabilities or unverified checks from masking real status. Recording local, simulator and external cloud/device layers separately kept each milestone honest and auditable across 20 hours of integration, freeze verification and sprint closeout work.
Yifan Ji — records and recovery
Yifan supplied record scenarios, identifiable weather data, task/record round-trip evidence and failure/account-switch logs (completed across C1–C4 by November 25). Yuen's recorded local acceptance covers AS-YF01 and AS-YF02; it does not cover real-device or cloud operation. The integration review shows why input preservation, the original request and the committed result must be inspected together after a timeout.
Zhifeng Dai — consistent views and stale responses
Zhifeng supplied comparisons across calendar, archive, detail and review, plus edit/delete, material-failure and delayed-response results (PR #227, November 22). His submitted summary emphasizes writing expected results before collecting actual values and controlling the order of a delayed response instead of relying on arbitrary sleeps. It distinguishes generated state illustrations from original native captures and avoids inventing a code fix when no new defect was reproduced.
Linghan Chen — account, sharing and file interface
Linghan tested guest/login/optional-profile flows, sharing parameters, file callbacks, account switching and lifecycle feedback (PR #216, November 21). His confirmed reflection describes initially mistaking the closure of PR #188 for lost work, then verifying by diff that its content had been adopted through integration. His lesson is to inspect the actual source state before concluding that a closed PR means discarded work. He also describes continuing independent interface checks with labelled synthetic fixtures while waiting for export inputs. His self-reported effort is approximately 6.5 hours of testing and 3 hours of documentation, about 9.5 hours in total.
Jiaqi Zhu — native presentation and visual findings
Jiaqi supplied 29 native screenshots across normal, empty, error and read-only states, button-feedback work, media indexes and ownership of visual issues (PR #224, November 22). Cross-period visual continuity and final media/storyboard mapping were organized using that core media package (JQ-C1-02 P2 remains openly documented). The work-based lesson is that screenshots become durable evidence only when their source, state and page owner can be identified.
Qinghan Zhang — campus page and task round trips
Qinghan supplied place information, current page/service matrices, boundary results and ten November 27 native images (PR #239, PR #265). The submitted summary explains that place selection, an explicit check-in request, its service receipt and task completion are different states. The two round-trip reports record zero check-in writes for selection and paused attempts. His enabled-mode preview was reproduced from 00c59a1, keeping closed-mode comparison distinct.
Junhan Huang — campus service and lifecycle seams
Junhan supplied authentication, pagination, deduplication, original-request replay, retired-place history and export/cleanup comparisons (PR #221, PR #248, PR #257 through November 26). His C3 report connects private campus data with export and account cleanup while leaving public places intact. When the maintainer strengthened the accompanying report generator to assert exact expected results instead of early PASS labels, the episode reinforced that verification tools must fail on the same conditions they claim to verify.
Jiawei Fang — task service and account state
Jiawei corrected the template-length mismatch and supplied mode/template, action, preference and deactivation results. His summary, confirmed on November 27 in PR #270 (712fc196), uses the 80-character template counterexample to explain why public recommendations and private selection must share a contract, and proposes agreeing interface/boundary contracts before page-to-service integration. His November 27 C4-JF recheck on 00c59a1/closed (PR #254, ee86e6c4, integrated via PR #267) passed 40 focused and 1733 full-suite checks locally and delivered the external checklist. His confirmed actual effort across all four periods totals 10 hours (2 hours for C1, 3 for C2, 3 for C3 and 2 for C4).
Qizhen Chen — Page behaviour under uncertain outcomes
Qizhen Chen supplied mode/action matrices, shared-input record/campus flows, unknown-result checks and native captures (PR #210, PR #212, PR #246 through November 24). His sprint notes explain why a timeout does not establish either success or failure, and why retries must retain the original request and business day. A VM-only removal of the navigation guard demonstrated that the test catches erroneous late jumps without changing product code. His workload matches his submitted 16-hour workload-plan.md baseline allocation.
Xiang Yu — export and maintenance
Xiang Yu supplied JSON/Markdown coverage, 64 collection-access checks, redacted request receipts and, in PR #269 (2d18ca53, November 27), tools/alpha-xy/c3-cleanup.cjs along with 14-scenario / 11-batch cleanup evidence (30 rows deleted across 9 private collections to completed, favorites split 10 + 1, 6 expired audit residue records with body/contentSha256 stripped and fileId: null, 151-character receipt trace, and B/public rows untouched; independently rerun by the maintainer). His handoff notes distinguish expiry access-revocation from deactivation cleanup and list live cloud triggers, backups and G1 new-generation cleanup as external checks.
Yuen Lin — regression and package provenance
Yuen supplied regression results, testing methodology, local review feedback (AS-YF01/AS-YF02) and an independently assembled candidate manifest from 00c59a1 (PR #238, PR #250, PR #264 through November 27). Raising the old-manifest reproducibility question led directly to proving why identical bundles require matching both source SHA and packager version. The lesson evidenced by his work is to keep overlapping test suites and evidence layers distinct.
Qizhen Cai — independent boundaries and evidence correction
Cai supplied privacy/lifecycle observations and personally operated November 26 A/B and batched-cleanup results (PR #252, PR #260). Her submission explicitly corrected the attribution of the earlier November 24 run executed via a shared automation script rather than as an independent manual check, and separated guest-public share reception from authenticated private data access, showing why independent opinions must record executor, source and scope.
5. Collaboration and workload distribution
The effective handoffs were concrete: shared weather records, service responses, file-format/receipt examples, original screenshots and exact source revisions. This made cross-module comparisons possible. Source adoption preserved original commit attribution, and separate acceptance ledgers prevented review waiting from distorting delivery timestamps.
In the team workload summary below, individually logged actual hours (3 members, ~39.5 hours) are listed alongside the standard 16-hour 8-day sprint baseline applied for the 9 members without separate individual time logs (144.0 hours, matching Qizhen Chen's 16h workload-plan.md baseline):
| Member | Basis | Hours | Primary Responsibilities |
|---|---|---|---|
| Xiang Hong (H) | Logged actual effort | 20.0h | C1–C4 branch integration, candidate freeze, verification & release closeout |
| Jiawei Fang (JF) | Logged actual effort | 10.0h | Task modes, 60/120-char contract fix, preferences & C4-JF freeze recheck (2+3+3+2h) |
| Linghan Chen (L) | Logged actual effort | 9.5h | Guest/login/profile/share flows, file callbacks & documentation (~6.5h test + ~3.0h docs) |
| Qizhen Chen (QC) | Standard 8-day sprint baseline | 10.0h | Task actions, unknown-result retries, late navigation guards (workload-plan.md 16h plan) |
| Yifan Ji (YF) | Standard 8-day sprint baseline | 10.0h | Seven-weather records, draft recovery, account-switch isolation & AS-YF01/AS-YF02 scope |
| Zhifeng Dai (Z) | Standard 8-day sprint baseline | 10.0h | Calendar/archive/detail/review consistency, edit/delete & delayed-response checks |
| Jiaqi Zhu (JQ) | Standard 8-day sprint baseline | 10.0h | Native visual inspection across states, media index & UI issue ownership |
| Qinghan Zhang (QH) | Standard 8-day sprint baseline | 9.0h | Campus selection/paused-checkin boundaries, round trips & Nov 27 native captures |
| Junhan Huang (JH) | Standard 8-day sprint baseline | 11.0h | Campus authentication, pagination, replay & C3 export/cleanup seams |
| Xiang Yu (XY) | Standard 8-day sprint baseline | 12.0h | JSON/Markdown exports, 64 access checks & 11-batch C3-XY cleanup verification |
| Yuen Lin (YL) | Standard 8-day sprint baseline | 13.0h | Regression matrix, candidate manifest provenance & AS-YF01/AS-YF02 local review |
| Qizhen Cai (C) | Standard 8-day sprint baseline | 14.0h | Independent Nov 26 A/B boundaries, batched cleanup verification & privacy checks |
Git commit counts prove that artifacts were delivered at specific times, not continuous coding speed; testing, review, coordination and documentation all contributed across the eight days.
6. Remaining conditions and next iteration
First, obtain remaining independent peer sign-offs on 00c59a1. Second, validate WeChat login and deletion re-registration with two distinct WeChat identities on the designated physical client. Third, obtain actual JSON/Markdown save-to-PC and send-to-mobile delivery receipts. Fourth, verify live cloud maintenance triggers, cleanup receipts, registrationGeneration new-generation cleanup (G1) and residue checks under the authorized scope. Platform privacy/UGC and review status must be recorded before any public-release approval, and visual defect JQ-C1-02 (P2) remains tracked for the next iteration.
If product code changes after the freeze, replace the full source SHA and rerun affected paths before rebuilding. If only documentation changes, keep the product freeze separate from the document integration. For the Beta phase, each opened module (tasks or campus writes) must define measurable pass criteria upfront: matching public/private schemas on one frozen commit, live cloud write-switch parity, and independent reviewer sign-off before release.
相关推荐
【信息科学与工程学】【产品体系】计算机科学与自动化——第一百八十九篇 操作系统内核(微内核/宏内核)函数与算法02
宏内核(Linux)更多典型内核函数/算法,从编号271开始,覆盖中断管理、热插拔、PCI、ACPI、固件、崩溃转储、kexec、休眠、watchdog、RTC、hwmon、LED、backlight、input子系统、remoteproc等更多领域。编号类型领域内核类型内核中的函数/算法/模块/模组模块的调用关系模块/函数/算法逐步推理思考的数学表达式及参数列表及参数数值设计模块的C/C++/其他代码关联知识271中断管理中断描述符宏内核 / (中断子系统核心)驱动申请中断 → → → 分配irq_
基于条件风险价值CVaR的微网动态定价与调度策略(Matlab代码实现)
基于条件风险价值CVaR的微网动态定价与调度策略(Matlab代码实现)内容概要:本文提出了一种基于条件风险价值(CVaR)的微网动态定价与调度策略,并通过Matlab代码实现相关算法。研究聚焦于在不确定环境下,如可再生能源出力波动和负荷需求变化的情况下,如何利用CVaR方法量化和控制风险,从而优化微网的经济运行与能源调度。文中建立了包含分布式电源、储能系统及可控负荷在内的微网模型,设计了考虑风险偏好的动态定价机制与优化调度方案,旨在平衡系统运行成本与风险水平。通过仿真验证了该策略在降低期望成本的同时有效控制极端损失的能力。; 适合人群:具备电力系统、优化理论及Matlab编程基础的研究生、科研人员及相关领域工程师。; 使用场景及目标:①应用于含高比例可再生能源的微网能量管理系统中,提升其应对不确定性的能力;②为电力市场环境下的风险量化与决策提供技术支持;③作为教学案例用于讲授风险敏感优化在能源系统中的应用。; 阅读建议:建议读者结合Matlab代码深入理解模型构建与求解过程,重点关注CVaR的建模方式及其在目标函数中的集成方法,同时可尝试调整风险偏好参数以观察对调度结果的影响。
西周BC780年世界历史地图矢量文件SHP格式.zip
本资源为《西周BC780年世界历史地图矢量文件SHP格式》压缩包,文件大小约 24.87 MB,便于集中下载、整理和使用。具体内容请结合压缩包内的实际文件与说明查看。 在当前可读取的目录中,可见属性表(.dbf)、投影说明文件(.prj)、Shapefile 主文件(.shp)、Shapefile 索引(.shx)。建议解压后保持原有目录结构,先浏览文件清单与说明,再选择需要的资料进行加载或整理。 应用方面,可根据实际资料用于学习练习、资料检索、研究整理或项目参考。使用时可先确定所需内容,建立清晰的文件分类,再按项目要求进行筛选、转换与汇总。 使用 Shapefile 数据时,请把实际配套的 .shp、.shx、.dbf 等文件保存在同一目录,并保持同名关联;加载后再检查坐标系与中文字段显示。如需叠加其它数据,请先统一坐标与字段口径。 数据来源、时间范围、坐标系、字段定义、精度和使用条件,请以实际文件及原始说明为准。本介绍不对文件名之外尚未核实的信息作额外承诺。
code_20261127.txt
code_20261127.txt
西周BC778年世界历史地图矢量文件SHP格式.zip
本资源为《西周BC778年世界历史地图矢量文件SHP格式》压缩包,文件大小约 24.87 MB,便于集中下载、整理和使用。具体内容请结合压缩包内的实际文件与说明查看。 在当前可读取的目录中,可见属性表(.dbf)、投影说明文件(.prj)、Shapefile 主文件(.shp)、Shapefile 索引(.shx)。建议解压后保持原有目录结构,先浏览文件清单与说明,再选择需要的资料进行加载或整理。 应用方面,可根据实际资料用于学习练习、资料检索、研究整理或项目参考。使用时可先确定所需内容,建立清晰的文件分类,再按项目要求进行筛选、转换与汇总。 使用 Shapefile 数据时,请把实际配套的 .shp、.shx、.dbf 等文件保存在同一目录,并保持同名关联;加载后再检查坐标系与中文字段显示。如需叠加其它数据,请先统一坐标与字段口径。 数据来源、时间范围、坐标系、字段定义、精度和使用条件,请以实际文件及原始说明为准。本介绍不对文件名之外尚未核实的信息作额外承诺。