| Members | Tasks Completed | Time Taken | Problems Encountered | Treatment | Tomorrow's plan |
| HAOYUAN HE | 1. The virtual machine is running correctly. 2. Install python 3.6.9 and django 2.2.21 on the virtual machine (same version as the tutorial) . 3. Install pycharm on ubuntu 18.04. | 5.5h*2 | 1. I was using a CentOS 7.0 Linux image, but there is no way to install python3 properly. 2. The VirtualBox virtual machine does not have a large display, only a square display of about 640x640. | 1. Find out that the problem is with the CentOS series and switch to Ubuntu 18.04 (actually 16.04 would work) version. 2. Add the extension plugin externally and reset the virtual machine configuration. | Learn the basic operations of django. |
| YUHAN ZHENG | 3. Installation and renewal of some accessories | Learn the basic operations of Mysql. | |||
| ZHENSHUO CHEN | Build front-end git repository, build WeChat applet front-end framework, build preliminary model of home page. | 2h | An error occurred when using hbuilder to communicate with wechat developer tool, and it cannot run normally to wechat developer tool. | Modify the manifest.json file in hbuilder, modify the wechat applet configuration, and open the communication port in the wechat developer tool. | Improve the homepage UI |
| XI LIN | Join the front-end Git repository, do the initial design of the applet framework and build the initial framework of the applet UI. | 2h | Insufficient understanding of how to connect the Git repository to the applet development assistant resulted in most of the completed task data being lost and rewritten. | Find the correct connection method and code after confirming that the connection is successful several times. | Further study the applet development assistant. |
| YANLI LIU | Summarize and reflect on the team cooperation so far, organize group meetings, assign work during the sprint, and discuss the overall direction and technical realization of the project sprint. | 2h | There is more work to be done during the sprint, and the sprint time is tight. In addition, vlog's plot script has not discussed good ideas for the time being. The UML diagram of the project is too inefficient to be discussed in a meeting. | Clear division of labor and set regular task deadline reminders in QQ group to urge the work to be completed on time. I draw the first version of UML and then send it to the group, and other members can modify and improve it. | UML diagram |




| Member |
Contribution Degree (percentage) | Achievement |
|---|---|---|
|
HAOYUAN HE | 25% | Build back-end configuration. |
| YUHAN ZHENG | 25% | Learn and build basic database. |
| ZHENSHUO CHEN | 20% | Front-end page design, Teamwork Vlog shooting. |
| XI LIN | 15% | Front-end interface rendering, page Jump logic. |
| YANLI LIU | 15% | Make sprint plan, draw system Use case diagram. |