183
社区成员




The Link Your Class | |
The Link of Requirement of This Assignment | |
The Aim of This Assignment |
Demand Analysis and Prototype Design |
Group number |
9C |
Team's name |
Eternal star shine in all directions |
MU STU ID and FZU STU ID |
19104022831901225_ |
Teammate1's ID and FZU STU ID |
19105151_831901204 |
Teammate2's ID and FZU STU ID |
19105274_831901203 |
Teammate3's ID and FZU STU ID |
19105681_831901211 |
Prototype Link | |
Demand specification Link | |
The Link Your Class |
I.Progress Display
The following table shows our progress today:
Member |
Completed Task | |||
Wanqi Chen |
mainly responsible for Grade; writes CSDN; is responsible for the uploading of the Github. Co-edit GitHub. Team programming together. | |||
Zejing Fang |
Draw class diagram, use case diagram, sequence diagram, state diagram and activity diagram; Co-edit GitHub. Team programming together. | |||
Zheng Yu |
Co-edit GitHub. Team programming together. | |||
Zheyan Wei |
Co-edit GitHub. Team programming together. | |||
Completion Time |
Remaining Time |
| ||
6 h |
4 Days |
| ||
4 h |
4 Days |
| ||
0.5 h |
4 Days |
| ||
0.5 h |
4 Days |
| ||
✴️ Problems Encountered:
1️. We have had some pair programming experience since last week, but this week's experiment requires teamwork. Through teamwork, we can better allocate the parts that need to be completed individually and the parts that need to be completed together to multiple team members. During this experiment ,everything is going on well actually with our excellent ,talented teammates We firstly finished the calculating codes, also modified, executed it. Then the followings is a series of tasks. As a matter of fact, we have faced a few troublesome problems. We respected each other's ideas and were able to control and plan our working hours so that we could complete programming tasks within the allotted time and improve our work in the future.
✳️ The way to deal with:
1. After a set of processes such as requirement analysis, we have a clearer and deeper understanding of software engineering. In the process, we have gained the most from writing software requirement specifications. Such a systematic, holistic analysis and planning, not only in soft engineering learning, for daily life is also of great benefit
II.Progress Record
📝 Github Record:
📝 Project Operation Record:
📝 Burn Out Diagram:
III.Contribution of Team Members
Member |
Contribution Degree (percentage) |
Contribution Details |
Wanqi Chen |
50% |
Summarize and think about the previous work of the team, and give the improvement scheme.Team division in sprint stage .Build and give the GitHub Library of the team project. The sprint log blog is submitted by the team leader |
Zejing Fang |
30% |
Every single day’s sprint blog writings.pinned sprint collection: Team name-Sprint collection.Assist the leader’s work as usual. |
Zheng Yu |
10% |
Describe project testing schedule, test tool selection and use, project testing review. |
Zheyan Wei |
10% |
Show sprint plan. |
IV.UML Diagram
✅ Class Diagram:
✅ Use Case Diagram:
✅ Sequence Diagram:
✅ Activity Diagram: