The Aim of This Assignment

Demand Analysis and Prototype Design

Group number

9C

Team's name

Eternal star shine in all directions

MU STU ID and FZU STU ID

19104022831901225_

Teammate1's ID and FZU STU ID

19105151_831901204

Teammate2's ID and FZU STU ID

19105274_831901203

Teammate3's ID and FZU STU ID

19105681_831901211

Prototype Link

https://b23.tv/edhQz6

Demand specification Link

https://docs.qq.com/doc/DTGZWU2p6RURHZEZ5

The Link Your Class

https://bbs.csdn.net/forums/MUEE308FZ


I.Progress Display

The following table shows our progress today:

Member

Completed Task

Wanqi

Chen

mainly responsible for Grade; writes CSDN; is responsible for the uploading of the Github. Co-edit GitHub. Team programming together.

Zejing

Fang

Draw class diagram, use case diagram, sequence diagram, state diagram and activity diagram; Co-edit GitHub. Team programming together.

Zheng

Yu

Co-edit GitHub. Team programming together.

Zheyan

 Wei

Co-edit GitHub. Team programming together.

Completion Time

Remaining Time

 

6 h

4 Days

 

4 h

4 Days

 

0.5 h

4 Days

 

0.5 h

4 Days

 

 

 


️ Problems Encountered:

1️. We have had some pair programming experience since last week, but this week's experiment requires teamwork. Through teamwork, we can better allocate the parts that need to be completed individually and the parts that need to be completed together to multiple team members. During this experiment everything is going on well actually with our excellent ,talented teammates We firstly finished the calculating codes, also modified, executed it. Then the followings is a series of tasks. As a matter of fact, we have faced a few troublesome problems. We respected each other's ideas and were able to control and plan our working hours so that we could complete programming tasks within the allotted time and improve our work in the future.


️ The way to deal with:

1. After a set of processes such as requirement analysis, we have a clearer and deeper understanding of software engineering. In the process, we have gained the most from writing software requirement specifications. Such a systematic, holistic analysis and planning, not only in soft engineering learning, for daily life is also of great benefit

 

 

II.Progress Record

📝 Github Record:


 

 

 📝 Project Operation Record:

 


 

  📝 Burn Out Diagram:


III.Contribution of Team Members

Member

Contribution Degree (percentage)

Contribution Details

Wanqi

Chen

50%

Summarize and think about the previous work of the team, and give the improvement scheme.Team division in sprint stage .Build and give the GitHub Library of the team project.

The sprint log blog is submitted by the team leader

Zejing

Fang

30%

Every single day’s sprint blog writings.pinned sprint collection: Team name-Sprint collection.Assist the leader’s work as usual.

Zheng

Yu

10%

Describe project testing schedule, test tool selection and use, project testing review.

Zheyan

 Wei

10%

Show sprint plan.

IV.UML Diagram

 

 Class Diagram:


  Use Case Diagram:

 

 


 Sequence Diagram:

 

 

 



 Activity Diagram:

 

 

...全文
207 回复 打赏 收藏 转发到动态 举报
AI 作业
写回复
用AI写文章
回复
切换为时间正序
请发表友善的回复…
发表回复

183

社区成员

发帖
与我相关
我的任务
社区描述
福州大学 梅努斯国际工程学院 软件工程 教学
软件工程 高校
社区管理员
  • 单步调试
加入社区
  • 近7日
  • 近30日
  • 至今
社区公告
暂无公告

试试用AI创作助手写篇文章吧