183
社区成员




The Link Your Class | |
The Link of Requirement of This Assignment | |
The Aim of This Assignment |
Demand Analysis and Prototype Design |
Group number |
9C |
Team's name |
Eternal star shine in all directions |
MU STU ID and FZU STU ID |
19104022831901225_ |
Teammate1's ID and FZU STU ID |
19105151_831901204 |
Teammate2's ID and FZU STU ID |
19105274_831901203 |
Teammate3's ID and FZU STU ID |
19105681_831901211 |
Prototype Link | |
Demand specification Link | |
The Link Your Class |
I.Progress Display
The following table shows our progress today:
Member |
Completed Task |
| ||
Wanqi Chen |
Estimate. Development. Analysis. Design Spec. Design Review. Coding Standard. Design. Coding. |
| ||
Zejing Fang |
Code Review Planning.Test.Reporting. Test Report .Size Measurement. |
| ||
Zheng Yu |
Postmortem. |
| ||
Zheyan Wei |
Process Improvement |
| ||
Completion Time |
Remaining Time |
| ||
8 h |
3 Days | |||
6 h |
3 Days | |||
0.6 h |
3 Days | |||
0.6 h |
3 Days | |||
✴️ Problems Encountered:
1️. This part of the code is the most logical and complex part. Although it's difficult, we finished it. When this part of the code is complete, there are many gains for us.
2️. Github still strange for us, so when we making operation on Github, we are not very skilled, after building team and repositories, every members need to create a branch to write the code, and when synchronizing all members' code, which needs to maintain the same code format, so it took us a lot of time to accomplish it.
3️. The difficulty of multi-team programming is that each team member sometimes thinks differently and needs to be on the same pagewhen programming, which took some time to coordinate and discuss.
✳️ The way to deal with:
1️. Every single day without programming is one day we betrayed of life.” In the next few weeks, due to the group of the number of defects, we will be more efforts to study WeChat developer tools use sent us and how to use Java development backend management,hope the whole project will work 7 days in advance, leave enough time for users to try and feedback, a perfect result in the final could fulfill.
2. Members communicate with each other and solve problems together
Members are familiar with the tasks that need to be done
All members have a strong sense of responsibility and finish the assigned tasks on time
Adopt leangoo to manage the cooperative development and set up kanban to make the project schedule clear
II.Progress Record
📝 Github Record:
📝 Project Operation Record:
📝 Burn Out Diagram:
III.Contribution of Team Members
Member |
Contribution Degree (percentage) |
Contribution Details |
Wanqi Chen |
55% |
The front-end design. The expected soft worker role:test.The expected soft worker role:front end |
Zejing Fang |
30% |
Repository and every single day’s Alpha Sprint blogs.The expected soft worker role:PM.The expected soft worker role:back end |
Zheng Yu |
7.5% |
PPT |
Zheyan Wei |
7.5% |
vlog. |
IV.UML Diagram
✅ Class Diagram:
✅ Use Case Diagram:
✅ Sequence Diagram:
✅ Activity Diagram: