LAB8_您说得都队_Sprint Log (No.4)

小怂饼干 2021-11-20 14:18:37
The Link Your Classhttps://bbs.csdn.net/forums/MUEE308FZ?category=0
The Link of Requirement of This Assilasshttps://bbs.csdn.net/topics/603251839
Group number您说得都队
The Aim of This AssignmentSprint Log 4

Today's progress

Work Report (Day4)

Project Progress

Member Contributions

UML Design: State Diagram


Today's progress

  • Work Report (Day4)

MembersTasks CompletedTime TakenProblems EncounteredTreatmentTomorrow's plan
HAOYUAN HEWith the help of the front-end boss, hbuilderx and wechat developer tools were installed, reference projects were successfully run at the front and rear ends, and China Unicom was successfully connected. Basically completed the learning of DRF architecture.8h1. The reference project does not adapt to the venv virtual environment I have been using all the time, and errors have been reported all the time
2. The front-end code of the reference project runs with an error message and the app.json cannot be found
3. The front end of the reference project is very slow and easy to flash back after running through hbuilderx
1. The reference project uses the miniconda environment. After installing the environment, it's OK. However, this environment starts when the terminal is running by default, which is a little annoying
2. Add a configuration statement to the project configuration
3. It can be run directly through wechat developer tools, although the speed is still relatively slow
4. A strange thing. The IP address of the reference item starts with 48. It is speculated that it may be the public IP, and there are many meaningless statements in setting. It may be that the old version statements are used together with the new version (strange)
Communicate with the front end so that you can test the current demo and implement the functions that the back end needs to implement.
YUHAN ZHENGToday, learn the parser and URL parsing rules, as well as the deployment and storage of the database.4hToday is a day of study. There is no big problem for the time being.Continue to refuel tomorrow.Prepare to set up ECs and cloud database, and conduct basic deployment.
ZHENSHUO CHENImprove the home page layout and configure basic routing.2hUnable to jump to page during route configuration.Pay attention to the case of the path and naming process to avoid confusion and errors.Improve the homepage UI
XI LINImprove the personal page layout of the applet, and conduct preliminary design and development of the team folder.3hIt's not a big problem. It's going well.Continue to refuel tomorrow.Further study the applet development assistant.
YANLI LIUDraw the state diagram of the system and help realize some functions of the front end.3hThe mastery of UML class diagram is not proficient enough.Learn class diagram knowledge and study examples.UML design
  • Project Progress

  • Member Contributions

Member

Contribution Degree (percentage)

Achievement

HAOYUAN HE

30%Build back-end configuration.
YUHAN ZHENG20%Learn and build basic database.
ZHENSHUO CHEN20%Front-end page design, Teamwork Vlog shooting.
XI LIN15%Front-end interface rendering, page Jump logic.
YANLI LIU15%Draw system State diagram, Help front-end interface implementation.
  • UML Design: State Diagram

 

...全文
81 回复 打赏 收藏 转发到动态 举报
写回复
用AI写文章
回复
切换为时间正序
请发表友善的回复…
发表回复

183

社区成员

发帖
与我相关
我的任务
社区描述
福州大学 梅努斯国际工程学院 软件工程 教学
软件工程 高校
社区管理员
  • 单步调试
加入社区
  • 近7日
  • 近30日
  • 至今
社区公告
暂无公告

试试用AI创作助手写篇文章吧