| The Aim of This Assignment | Sprint Summary |
Contents
Project Expected Plan & Actual Progress
🚩Expected Function ✔️Actual Achievement
| Sprint Plan | https://bbs.csdn.net/topics/603413281 |
| Sprint Collection | https://bbs.csdn.net/topics/603440893 |
| GitHub Repository |
Front-end: https://github.com/LIV-CODE/YUANQUAN Back-end: https://github.com/Howell-1108/YUANQUAN |
| PPT | https://www.canva.com/design/DAEwQ2XqU_s/UB-StvJzx3_GejAkWOTw-A/view |
| Vlog | https://www.bilibili.com/video/BV16M4y1A7Sf?spm_id_from=333.999.0.0 |
1. Open source integration



2. Team shared folder


3. One-click to inspire


| Members | Experience |
|---|---|
| HAOYUAN HE |
In this lab, I acted as the back-end. In this sprint, I deeply felt the difficulty of a project production process. In a very short time, due to the non circulation of information, I reworked many times, which exercised my learning ability and mentality. Different from other team assignments, this task is very difficult, so I spent a lot of time learning related technologies and referring to other projects, but the effect is not good due to time constraints. Therefore, we should pay more attention to the arrangement of time and the estimation of the amount of tasks. |
| YUHAN ZHENG |
I have roughly completed the basic functions of the program, crawler and database construction.I wasn't very good at using schedules on this project, leading to very tight schedules in many cases.Also, because this is my first exposure to this kind of project. We all lack expertise. The project is in progress. I learned a lot. I believe THAT I will be more skilled in dealing with such projects in the future. |
| ZHENSHUO CHEN | In this project, I am mainly responsible for front-end development and work record. After the previous two individual and pair work experience, we have improved a lot of proficiency in the whole development process, the team division of labor is orderly. In the process of front-end development that I was in charge of, every link was extremely challenging, from frame selection, to page building, and finally to the front and back end docking. However, through the weekly group meeting, we not only solved many difficult problems together, but also improved the efficiency of the team. I think this is a good way of team cooperation. Finally, as a record keeper, I felt very excited when I saw our project start from scratch. Maybe this is the charm of software engineering. |
| XI LIN |
After seven days of sprinting at full steam, my enthusiasm for soft works climbed to the top and I experienced the joy of being a software worker. Through this trial, I learnt how to work in a team with others and understood the importance of cooperation among programmers, I also learnt a lot about developing applets and learned more about the hardships behind developing them. It was an unforgettable experience and I feel that I benefited greatly from it. |
| YANLI LIU | In this team project, I served as the group leader. Perhaps I am not specifically responsible for the specific work of which part of the front or back end, but I am more involved in the overall planning and arrangement of the whole process of the project. From demand analysis to function design, and then to division of labor, I realize that a project must have the direction of overall planning before it will not fall apart. Through this project experiment, although the process is very painful and difficult, it is also full of harvest. I learned the whole process of software design from zero to some. |
| Members | Responsible Works | Contribution Proportion |
|---|---|---|
| HAOYUAN HE | Back-end / Presentation | 20% |
| YUHAN ZHENG | Back-end / Test | 20% |
| ZHENSHUO CHEN | Front-end / Vlog | 20% |
| XI LIN | Front-end / UI Design / PPT | 20% |
| YANLI LIU | Blog / UML Design / PPT | 20% |