03 Group - Sprint Log 2nd (12.08)

-ChenkyL- 2022-12-08 22:25:15
The Link of ClassFZU-SE-EE308-2022秋
The Link of Requirement of This AssignmentLAB 3-2 Project defense & alpha test - sprint
TeamName03-路橙 人间小橘子
Sprint Summary Link03 Group- Sprint Summary
Video demo linkOrange路橙 真机演示视频
Github linkEE308-GROUP03

Contents

  • 1. Progress
  • 2. Photo
  • 3. Check-in records of Github
  • (1) Screenshots of the operation
  • (2) Progress of the development
  • (3) Burndown Chart
  • 4. Contribution
  • 5. Implementation of sub-use cases in the UML design
  • (1) Log in
  • (2) Voice sssistant
  • (3) Remote assistance module
  • (4) Subway, bus, taxi routes

1. Progress

NameCompleted taskDuration of the taskThe remaining timeProblemThe way to deal with
Zhou Miaolan (Team Leader)1.Connecting with the back end to realize the registration function 2.Logical writing of the page agreeing to the protocol842Interface faultGet idea from other members
Chen Nuo1.Completing the taxi interface 2.Completing the bus interface842Code improveLearn from web and repeated debugging
Yang Yang1.Voice Assistant Interface 2.Animation of voice assistant842Complex animation designRepeated debugging
Pan Chenlu1.Completing friend module interface 2.Adding and delete data842Page layout adjustmentQuery parameters from web tutorial
Zhong Xiaojia1.Completing the back end code of log in and register 2.Completing the back end code of friend module842Code correctly but failed to runDouble check the code and ask online
Hu Wenjing1.Departure module interface 2.Connecting to server842Preliminary functions need to be improvedTry to learn the relevant knowledge

2. Photo

img

  • Meeting Content: Report the progress of each part and solve some problems together.
  • Meeting Process: We started by talking about our progress and the problems we were having. Then we try to solve some difficult problems together. In the end, we solved some of the problems and made minor adjustments to the division of labor and development expectations.

3. Check-in records of Github

(1) Screenshots of the operation

1. Login module

img

2. Subway and bus routes module

img

3. Voice assistant module

img

4. Friend module

img

5. Remote module

img

(2) Progress of the development

  • First, we held a meeting together and studied some problems. Then, we did tasks and exchanged tasks according to the division of labor.
  • Optimized some page design
  • Login mobile-end module: Complete logical writing of the page agreeing to the protocol
  • Bus routes mobile-end module: Develop completely
  • Voice assistant mobile-end module: Complete animation of voice assistant
  • Friend module mobile-end module: Realize the function to add and delete data
  • Remote assistance mobile-end module: Completing the back end code of friend module
  • The back-end module: Complete the code to connect to server

(3) Burndown Chart

img

4. Contribution

MembershipCorresponding contributionContribution
Zhou Miaolan (Team Leader)Part of the login mobile-end codes100.001%
Chen NuoPart of the subway, bus routes mobile-end codes100.001%
Yang YangPart of the voice assistant mobile-end codes100.001%
Pan ChenluPart of the friend module mobile-end codes99.999%
Zhong XiaojiaPart of the back-end codes99.999%
Hu WenjingPart of the remote assistance mobile-end codes99.999%

5. Implementation of sub-use cases in the UML design

(1) Log in


(2) Voice sssistant


(3) Remote assistance module


(4) Subway, bus, taxi routes


...全文
84 1 打赏 收藏 转发到动态 举报
写回复
用AI写文章
1 条回复
切换为时间正序
请发表友善的回复…
发表回复
  • 打赏
  • 举报
回复

很不错的内容,干货满满,已支持师傅,期望师傅能输出更多干货,并强烈给师傅五星好评

另外,如果可以的话,期待师傅能给正在参加年度博客之星评选的我一个五星好评,您的五星好评都是对我的支持与鼓励(帖子中有大额红包惊喜哟,不要忘记评了五星后领红包哟)
⭐ ⭐ ⭐ ⭐ ⭐ 博主信息⭐ ⭐ ⭐ ⭐ ⭐
博主:橙留香Park
本人原力等级:5
链接直达:https://bbs.csdn.net/topics/611387568
微信直达:Blue_Team_Park
⭐ ⭐ ⭐ ⭐ ⭐ 五星必回!!!⭐ ⭐ ⭐ ⭐ ⭐

点赞五星好评回馈小福利:抽奖赠书 | 总价值200元,书由君自行挑选(从此页面参与抽奖的同学,只需五星好评后,参与抽奖)

285

社区成员

发帖
与我相关
我的任务
社区描述
福州大学 梅努斯国际工程学院 软件工程(2022秋) 教学
软件工程 高校
社区管理员
  • LinQF39
加入社区
  • 近7日
  • 近30日
  • 至今
社区公告
暂无公告

试试用AI创作助手写篇文章吧