G14-Sprint plan(12.04)

BravoMyLife 2022-12-10 14:23:45
The Link Classhttps://bbs.csdn.net/forums/MUEE308FZU202201
The Link of Requirements of This Assignmenthttps://bbs.csdn.net/topics/610142480
TeamNameHealth Care
Sprint Summary Link
Video demo linkhttps://www.bilibili.com/video/BV1fW4y1p7kF/?vd_source=e1b059afb7a700ee642d3e35b37c0eeb
GitHub linkhttps://github.com/BoLiupro/HealthCare_V2

img

Directory

  • 1.Summary of Pervious Work
  • 1.1. Difficulties Encountered
  • 1.2. Relevant Solution
  • 2.Defense Opinions Record
  • 3.Future Plan
  • 4.Sprint Team Division of Labor (tabular format)

1.Summary of Pervious Work

img

1.1. Difficulties Encountered

1)The technical route of external equipment module for heart rate monitoring is not clear enough, and there are differences in equipment selection.
2)Team members are not clear about uml design and have difficulties in project records.
3)The Android part of the team needs to learn a large amount of knowledge, and the time is tight and the task is heavy.
4)Inconsistent work habits and code writing specifications of team members.

1.2. Relevant Solution

1)The team discussed intensively and consulted the data, and decided to take the original project data as the guide to reproduce according to the original technical route. The hardware equipment was borrowed from the Electrical Institute according to the materials.
2)The team shall divide the work, designate personnel to study in the blog park, and draw uml diagrams.
3)The team assigned 3 members to study and regularly reported the learning progress in the cooperation group, which was supervised by the team leader and provided reference code for learning.
4)Determine unified standard code format and network code format, and unify meeting time and progress.

img

2.Defense Opinions Record

Opinions RecordSolution
The target group of software is the elderly, and the use function of managers and young people is not prominent enoughContinue to take the elderly as the main user group, and strengthen the functions of other groups such as maintenance knowledge, sports knowledge, and auxiliary care for the elderly
The meaning of the drug query function is not clear enoughImprove the function algorithm and make a clearer explanation in the software document
The software is complete and powerful, and may not be completed on timeThe team shall make the project schedule, integrate the original technology and code, and complete the task according to the quality and quantity.

3.Future Plan

1)Improve the project(especially the android part) and keep a record of project progress in real time.
2)Do a good job of github warehouse management and cooperative development.
3)Complete the submission of various materials on time, constantly tap the value of software, correct bugs.

4.Sprint Team Division of Labor (tabular format)

namedivision of work
Bo LiuI am the software designer, the core member of team development, the organizer and the back-end development member.
Rongzeng SuThe team's Android engineer is responsible for interfacing with back-end developers and is the core member of mobile software development
Wei LinResponsible for writing and writing CSDN blog, document management, database management and cooperating with the back-end for development, playing an important role in team collaboration and organization
Yanxu LinMarket demand analyst, software designer
Jingqiang WuProvide logistical support for teammates
Yiyang LiDemand analyst, team logistics support, responsible for soft,Component function test modification and error troubleshooting
Derong HanResponsible for prototype production, software design, and software testing

img

...全文
184 回复 打赏 收藏 转发到动态 举报
AI 作业
写回复
用AI写文章
回复
切换为时间正序
请发表友善的回复…
发表回复

285

社区成员

发帖
与我相关
我的任务
社区描述
福州大学 梅努斯国际工程学院 软件工程(2022秋) 教学
软件工程 高校
社区管理员
  • LinQF39
加入社区
  • 近7日
  • 近30日
  • 至今
社区公告
暂无公告

试试用AI创作助手写篇文章吧