05 Group - Sprint Log 4th (12.12)

Hanlin-CAI 2022-12-12 20:15:56

05 Group - Sprint Log 4th (12.12)

1. Brief Introduction

The Link Your ClassHere
The Link of Requirements of This AssignmentLab3-2 Requirement
Team NameRIDS-IoT-Group
Team Project TopicIoT Garbage Manager
Sprint Collection Link[Sprint Collection Link]
Sprint Summary Link[Sprint Summary Link]
Video demo linkPreview Demo and Pervious Oral
GitHub linkGithub Repo

目录

  • 05 Group - Sprint Log 4th (12.12)
  • 1. Brief Introduction
  • 2. Progress of Sprint
  • 3. Minutes of Meeting
  • 3.1 Contents of the Meeting
  • 3.2 Pictures of the Meeting
  • 4. Development Process
  • 4.1 Check-in Records of Github
  • 4.2 Photos of the Operation
  • 4.3 Corresponding UML designs
  • 5. Introduction of Progress
  • 5.1 Progress of Development
  • 5.2 Burnout Diagram


2. Progress of Sprint

NameCompleted TaskDuration of the TaskProblem EncounteredSolutionProportion
Hanlin Cai (Leader)Sprint plan task assignment3hOther specialized courses have more exams and homework.Group time is arranged according to the open test and homework time.110%
Zheng LiA summary of the proposal report3hThe tasks completed before are more scatteredCommunicate with students who have completed different functions110%
Jiaqi HuBack end authoring5hHow to cooperate with the front end to effectively display the data.Swagger API document is applied to solve communication test problem between front and back ends.105%
Zhijun ZhaoFront end writing8hHow to connect the front-end and back-end api interfaces.Strengthen communication and re-write api encapsulation files in the front end.105%
Yinheng LinUpdate of prototype3hThe layout of some pages is not quite right.Spruce up the finished front page.100%
Shipei ZhangBack end testing2hThe processing of the data is not perfect.Learn the method of data processing on the Internet.80%
Youlin FengPPT editing3hAnimation effects are difficult to achieve.Find tutorials to learn about After Effects(AE).100%
Shuying LiuBlog writing and documentation5hThe sprint documentation requirements are not very clear.Private chat with members to analyze the specific requirements and related requirements of the sprint document110%
Jingjie YuDocument organizing4hThe usage of some functions is unclear.Communicate with classmates in the group and complete the writing of functions.100%

3. Minutes of Meeting

3.1 Contents of the Meeting

  1. Summary of the previous progress.

  2. Front-end for the management system interface writing plan discussion.

  3. Arrangement for the presentation of video and PowerPoint afterwards.

3.2 Pictures of the Meeting


4. Development Process

4.1 Check-in Records of Github

4.2 Photos of the Operation

Our equipment installation diagram.

img


img


img

4.3 Corresponding UML designs

This week's focus is on implementing the front end, located in the red box section of the general mind map, and based on the UML diagram below.


5. Introduction of Progress

5.1 Progress of Development

The connection between the back-end and the front-end.

Front-end api setup and debugging.

Video and ppt preparation for the final presentation.

5.2 Burnout Diagram

This blog is written by Jinjie Yu, and modifed by Hanlin CAI.

...全文
94 回复 打赏 收藏 转发到动态 举报
写回复
用AI写文章
回复
切换为时间正序
请发表友善的回复…
发表回复

285

社区成员

发帖
与我相关
我的任务
社区描述
福州大学 梅努斯国际工程学院 软件工程(2022秋) 教学
软件工程 高校
社区管理员
  • LinQF39
加入社区
  • 近7日
  • 近30日
  • 至今
社区公告
暂无公告

试试用AI创作助手写篇文章吧