285
社区成员




The Link Your Class | Here |
---|---|
The Link of Requirements of This Assignment | Lab3-2 Requirement |
Team Name | RIDS-IoT-Group |
Team Project Topic | IoT Garbage Manager |
Sprint Collection Link | [Sprint Collection Link] |
Sprint Summary Link | [Sprint Summary Link] |
Video demo link | Preview Demo and Pervious Oral |
GitHub link | Github Repo |
Name | Completed Task | Duration of the Task | Problem Encountered | Solution | Proportion |
---|---|---|---|---|---|
Hanlin Cai (Leader) | Sprint plan task assignment | 5h | Other specialized courses have more exams and homework. | Group time is arranged according to the open test and homework time. | 120% |
Zheng Li | A summary of the proposal report | 3h | The tasks completed before are more scattered | Communicate with students who have completed different functions | 100% |
Jiaqi Hu | Back end authoring | 10h | How to cooperate with the front end to effectively display the data. | Swagger API document is applied to solve communication test problem between front and back ends. | 100% |
Zhijun Zhao | Front end writing | 6h | Parameter passing for interface jumps. | Check the official documentation for adjustments. | 100% |
Yinheng Lin | Update of prototype | 3h | Some of the front-end interface differs from the prototype. | Conduct real-world tests and be patient with modifications | 110% |
Shipei Zhang | Back end testing | 2h | The processing of the data is not perfect. | Learn the method of data processing on the Internet. | 60% |
Youlin Feng | PPT editing | 3h | Animation effects are difficult to achieve. | Find tutorials to learn about After Effects(AE). | 100% |
Shuying Liu | Blog writing and documentation | 5h | The sprint documentation requirements are not very clear. | Private chat with members to analyze the specific requirements and related requirements of the sprint document | 110% |
Jingjie Yu | Document organizing | 3h | The usage of some functions is unclear. | Communicate with classmates in the group and complete the writing of functions. | 100% |
Review the previous proposal and evaluate team members.
Divide the tasks for the next sprint.
Discussed features that need to be updated.
In-depth communication between front end and back end
This week's focus is on integrating the full front-end interface and testing the interface jumps(the scope is shown in the red box). Besides, we have standardised the format of the back-end interface and deployed the server.
Installation of hardware devices into bins for testing.
Integration of front-end interfaces and optimisation of API.
Video and ppt preparation for the final presentation.
This blog is written by Yinheng Lin, and modifed by Hanlin CAI.