Group 02 - sprint log 4 (12.12)

qq_52981234 2022-12-20 09:24:13
The Link Your Classhttps://bbs.csdn.net/forums/MUEE308FZU202201
The Link of Requirement of This Assignmenthttps://bbs.csdn.net/topics/610142480
Group number and Group nameGroup 2 _ 一站式开源硬件交流社区——ELECO(电子)
The Aim of This AssignmentReport project progress and plan the next stage in order to better complete the project

img


Contents

  • 1 Progress of each members
  • 2 Record of the Stand-up Meeting
  • 3 Development Process (screenshots of the operation)
  • 3.1 Front End
  • 3.2 Back End
  • 3.3 Test
  • 4 Progress Burndown Chart
  • 5 Team Member Contribution Table

1 Progress of each members

Division of LaborTeam MembersCompleted TaskDuration of the TaskProblems EncounteredSolutionPlan of Next Stage
Front
End
She Zixiang, Zheng Zheyi,Lin Mingrui1. Initial build of sub-section pages
2. Fixed the problem that the user was still logged in when re-running the project after the cookie expired.
3. The old style has been tweaked and merged to a GitHub subbranch.
10h1. Posts are not yet relevantly stored in the back-end database, and the display of posts is still in a rather ambiguous state.
2. Posting function is not perfect.
1. Refinement of the posting page and use of the interface for storage of test data.
2. Continue to refine and tweak the page style to fit the user's needs.
1. Test the post publishing page
2. Implement inter-page jumping function and hardware recognition function
Back
End
Zhao Rui, Chen Kaifeng, Zhu Liao, Wang WeiqinModify the bug of checking the followers8hHow to do pagingComplete paging with mybatis-plus1. Implement post editing and publishing functions
2. Implement post editing and publishing functions
TestOu Zhenhui, Xu Xin, Wang Enyi1. API interface test
2. Complete testing of all the pages that have been completed on the back end
7hWe are not very familiar with the test method, and the code is relatively complicated in the test process, and there are many testing situations, so the test is difficultThrough learning to master the test method, to a certain extent understand the front and back end of the code, well completed the testFianl project testing, focusing on hardware identification and posting functions

2 Record of the Stand-up Meeting

img

img

3 Development Process (screenshots of the operation)

3.1 Front End

Sub-section interface :

img

Git commit records:

img

Page Effect
Sub-section interface :

img

3.2 Back End

img

img

3.3 Test

Front-end test (API interface test) :

img

img

Back End
View Follow

img

img

View Fans

img

img

4 Progress Burndown Chart

img

5 Team Member Contribution Table

MemberContribution Percentage
She Zixiang10%
Zheng Zheyi10%
Zhao Rui10%
Chen Kaifeng10%
Zhu Liao10%
Xu Xin10%
Wang Weiqin10%
Lin Mingrui10%
Ou Zhenhui10%
Wang Enyi10%
...全文
145 回复 打赏 收藏 转发到动态 举报
AI 作业
写回复
用AI写文章
回复
切换为时间正序
请发表友善的回复…
发表回复

285

社区成员

发帖
与我相关
我的任务
社区描述
福州大学 梅努斯国际工程学院 软件工程(2022秋) 教学
软件工程 高校
社区管理员
  • LinQF39
加入社区
  • 近7日
  • 近30日
  • 至今
社区公告
暂无公告

试试用AI创作助手写篇文章吧