assignment3_ gamers2
Gamers2 拾光 FindBack — Assignment 3: Requirement Analysis
| Item | Content |
|---|---|
| Course | EE308FZ Software Engineering 2026 Fall — course community |
| Assignment requirement | Third assignment — Requirement Analysis |
| Team name | Gamers2, group 4 of the course |
| Project name | 拾光 FindBack — a campus lost-and-found platform with image-based candidate matching |
| Team account | Gamers_2 |
| Previous assignment | Second assignment — team formation and topic selection |
| Goal of this assignment | Build on the previous requirements draft to complete user scenarios, a UML class model, interface prototypes and verifiable requirements, delivering the SRS, the requirement-analysis presentation and this blog post |
| Current SRS | v1.3, FB-SRS-2026-V1.3, 18 October 2026; cross-reviewed within the team, awaiting course review |
| References | Chapter 8 of The Method of Construction (Zou Xin), GB/T 9385-2008, GB/T 8567-2006, IEEE 830-1998, the assignment-2 materials and the frontend feasibility assessment |
We want a lost item on campus to move from "someone posted about it" to "the item actually went back". This requirement analysis follows the loop of publishing, candidate matching, evidence verification, offline handover and two-sided confirmation, and states who performs each step, how exceptions are handled, and what evidence finally counts as acceptance.
This round produced a nine-chapter SRS and a 25-slide presentation (15 spoken slides, 3 appendix slides, 7 backup slides), covering 8 user scenarios, 14 core classes, 12 interface prototypes, and the acceptance and traceability links for 42 functional requirements. Product development, real user research and pilot validation proceed on the following plan; the items, scores and statistics shown in the prototypes are illustrative only.
Contents
目录
- Gamers2 拾光 FindBack — Assignment 3: Requirement Analysis
- Contents
- 1 Team division of labour and contribution
- 1.1 Role groups
- 1.2 Work and actual contribution for this assignment
- 2 Team organisation and collaboration
- 2.1 Connecting roles through user scenarios
- 2.2 Integrating and reviewing the deliverables
- 3 Software Requirements Specification
- 3.1 Document download
- 3.2 Nine-chapter structure
- 4 User scenarios and business flow
- 4.1 Users and scope
- 4.2 The eight scenarios
- 4.3 Main flow illustrated with a folding umbrella
- 5 Class model and domain model
- 5.1 The fourteen core classes
- 5.2 Two state machines
- 5.3 Persistence view
- 6 Interface prototypes
- 6.1 Page structure
- 6.2 Prototype showcase
- 7 Functional requirements and traceability
- 7.1 Requirement list and priorities
- 7.2 Five-way traceability example
- 8 Non-functional requirements and acceptance
- 8.1 Performance and capacity targets
- 8.2 Five acceptance categories
- 8.3 Definitions of the three metrics
- 9 Delivery form and technology choices
- 9.1 H5 as the primary delivery, mini program for demonstration
- 9.2 Backend and algorithm service
- 10 Key difficulties and consistency revisions
- 10.1 Entity tables cannot fully express the business model
- 10.2 Similar images cannot prove ownership
- 10.3 External notification and campus identity depend on platforms
- 10.4 Case closure and metrics must stay consistent
- 10.5 Unified baseline across the three deliverables
- 10.6 The technology change and synchronising three deliverables
- 11 Project plan and open items
- 11.1 Planned schedule
- 11.2 Open items
- 12 Requirement analysis presentation
- 13 References
1 Team division of labour and contribution
1.1 Role groups
The team has 14 members and keeps the six role groups defined in the second assignment (the membership has been adjusted since then). Item owners and finders are product user roles and are managed separately from the development groups below.
| Group | Members (count) | Scope of responsibility |
|---|---|---|
| Project management | Sun Zikun, Zhou Shengdong (2) | Project scope, schedule and delivery coordination, consistency checks across the three deliverables |
| Product requirements | Zhou Debin, Zheng Ziyang (2) | User research, scenarios, SRS body, acceptance criteria |
| Frontend and UI | Wu Junjia, Zheng Zongyuan, Zuo Xiangrong, Li Jianhang (4) | Prototypes, page interaction, H5 and mini-program differences, upload and messaging experience |
| Backend and operations | Luo Yuhan, Liu Peikun, Wang Qiushi, Xiao Zhengyu (4) | Domain model, interfaces, identity and permissions, storage, transactions and deployment |
| Algorithm | Liu Junye (1) | Image candidate retrieval, re-ranking and match-quality assessment |
| Testing | Xu Yichao (1) | Requirement testability, exception paths, compatibility and acceptance design |
1.2 Work and actual contribution for this assignment
The table below is the actual division of labour and contribution for this assignment, confirmed by all 14 members on the basis of document revisions and review records, and totalling 100%. The percentages are weighted by task difficulty and effort; they are not distributed evenly, nor carried over from the second assignment.
| Student ID | Name and work description for this assignment | Contribution |
|---|---|---|
| 832401315 | Sun Zikun: coordinated scope and schedule; merged and final-reviewed the SRS; wrote the requirement traceability matrix (9.1) and the open-items list (9.2); organised the internal cross-review | 8% |
| 832401313 | Luo Yuhan: set up the document repository and folder conventions; unified the Word template and figure/table numbering; exported the PDF; maintained the blog and attachment links; wrote section 2.4 (deployment and resource constraints) and section 7.6 (maintainability) | 12% |
| 832401329 | Zhou Debin: designed and ran the user research (questionnaire and interviews); wrote the main body of Chapter 3 user scenarios (3.1–3.10) | 5% |
| 832401327 | Zheng Ziyang: wrote the eight detailed scenario descriptions (3.2–3.9) and the use-case overview (3.1); wrote the terminology and abbreviations table (1.3); completed the data dictionary (6.3); presented this report | 10% |
| 832401223 | Wu Junjia: led Chapter 5 interface prototypes, including the design rules (5.1) and the 12 key interface wireframes (5.2–5.13) | 6% |
| 832401328 | Zheng Zongyuan: drew the page map (5.1, Figure 5-1) and the four page flows (5.1.1); wrote the prototype-to-acceptance mapping table | 5% |
| 832401230 | Zuo Xiangrong: designed the publishing and image-upload interface chain (UI-02/03/05/12), including the interaction notes for automatic masking of ID documents | 5% |
| 832401210 | Li Jianhang: designed the search and candidate-matching interfaces (UI-01/UI-04) and how match reasons are presented | 6% |
| 832401213 | Liu Peikun: led the Chapter 4 class model, covering the attributes, operations and multiplicities of the 14 core classes (4.1–4.3); drew the ER view (4.5) | 6% |
| 832401317 | Wang Qiushi: drew the two state machines (4.4); wrote the 10 business rules (6.4); wrote the security, privacy and compliance requirements (7.2, 7.7) | 8% |
| 832401318 | Xiao Zhengyu: wrote the performance and capacity targets (7.1), reliability and idempotency (7.4) and maintainability (7.6) | 6% |
| 832401212 | Liu Junye: designed the matching-related classes and the candidate scoring model; defined Hit@5 and the match-quality evaluation criteria (8.4) | 6% |
| 832401319 | Xu Yichao: wrote the Chapter 8 acceptance and verification criteria (8.2–8.4, 8.7); test coverage and traceability | 6% |
| 832401330 | Zhou Shengdong: tracked progress and delivery checks; compiled the device-compatibility matrix and test samples (7.5, 8.6); checked the consistency of the SRS, the presentation and this blog | 11% |
| Total | 14 members | 100% |
Contribution review follows the principle proposed last time — "assess by task quality, collaboration and review records" — rather than counting files or commits. The actual share for this assignment and the projected share for the semester are recorded separately.
2 Team organisation and collaboration
2.1 Connecting roles through user scenarios
Collaboration in this round was organised around user scenarios. A single requirement change has to be checked against the business rules, the classes, the pages and the acceptance criteria at the same time. For example, "one-sided confirmation must not close a case" affects the case state, the uniqueness constraint on confirmations, the button feedback in UI-06, and the duplicate-request and concurrency tests — it cannot be handled by editing one sentence of text.
The requirements group explains why users act and what they expect; the frontend turns inputs, feedback and exceptions into pages; the backend reviews permissions, state and data consistency; the algorithm group explains what a candidate means and when matching degrades; the testing group rewrites requirements into executable checks; the team lead consolidates scope and open items.
2.2 Integrating and reviewing the deliverables
The version changes actually recorded in the files are: v1.0 added the model and prototypes; v1.1 reorganised the document into nine chapters and unified the business rules; v1.2 aligned the runtime environment and the pilot configuration in NFR-02 to 8 CPU cores and 16 GB of memory; v1.3 changed the business backend stack from Java 17 / Spring Boot 3 to C# / .NET + ASP.NET Core (Web API). The presentation and this blog cite the same identifiers, counts and metrics.
Subsequent reviews follow the process below, with the records archived alongside the tasks:
- Every task names an owner, the related requirements, a planned completion date and a reviewer.
- Progress, blockers and requirement changes are synchronised in the team's existing channels, and conclusions are written into the shared change log.
- Scenarios, model, pages and acceptance criteria are cross-reviewed between roles, and the traceability matrix is re-checked after any change.
- Differences between the SRS, the presentation and the blog are reconciled so that one consistent set of attachments can be submitted.
- The actual reviewers, dates, decisions and open issues are recorded before an approved baseline is established.
The actual record of this review:
| Item | Content |
|---|---|
| Review time | 2026-10-18 18:30–19:30 |
| Participants | Sun Zikun, Luo Yuhan, Zheng Ziyang, Zhou Shengdong, Liu Peikun, Wang Qiushi |
| Communication tool | WeChat group |
| Review conclusions | Contribution shares confirmed; backend stack changed to C#; presentation re-organised for an 8-minute slot |
| Open issues | Real user-research data, service-point cooperation, and others |
3 Software Requirements Specification
3.1 Document download
- Word version of the SRS: [Software Requirements Specification v1.3] (https://github.com/shizhong2333/FindBack_srs)
- Requirement analysis presentation: Assignment 3 requirement-analysis presentation
The files are 需求规格说明书-拾光FindBack-v1.3-后端技术栈调整版.docx and 拾光FindBack-第三次作业-需求分析汇报-v1.3-交付版.pptx. The attachments must be uploaded and the two links above replaced before publishing, so that readers who are not logged in to a team account can access them under the platform's permissions.
3.2 Nine-chapter structure
SRS stands for Software Requirements Specification: the document that fixes the behaviour, constraints and acceptance basis of the system to be built.
| Chapter | Main content |
|---|---|
| 1 Introduction | Purpose, the four pain points, terminology and abbreviations, references |
| 2 Overall description | Product positioning, functional structure, user characteristics, runtime environment, constraints and dependencies |
| 3 User scenarios | Descriptions of the four roles, 8 full scenarios, the use-case overview and the state of research evidence |
| 4 Class model and domain model | 14 core classes, attributes and operations, multiplicity, composition and aggregation, two state machines and the ER view |
| 5 Interface prototypes | Page structure, 12 prototypes, control descriptions, inputs and outputs, exception feedback and page flows |
| 6 Functional requirements | 18 modules, 42 FRs, priorities, iterations, inputs and outputs, data dictionary and business rules |
| 7 Non-functional requirements | Performance, privacy, usability, reliability, compatibility, maintainability and platform constraints |
| 8 Acceptance and verification criteria | Verification methods and pass criteria for interface, function, non-functional, match quality and pilot |
| 9 Requirement traceability matrix | Five-way links between scenario, function, class, interface and verification, plus the TBD list and review status |
External interface requirements are kept in Appendix E as input for later API design. The interface tables, the data entity tables and the interface prototypes describe different concerns and none of them can substitute for another.
4 User scenarios and business flow
4.1 Users and scope
The product serves item owners, finders, service-point staff and administrators. An owner and a finder may be the same user taking different roles in different cases. If the campus authorities only receive anonymised statistics, they are treated as a stakeholder and do not automatically gain access to private evidence.
The scope for this semester is a controlled pilot on a single campus: no payments, no custody guarantee, no cross-campus interoperability and no automatic ownership adjudication. Only service points with confirmed cooperation and authorisation can enter the receiving or verification flow.

4.2 The eight scenarios
| Scenario | Main task | Key exceptions |
|---|---|---|
| SC-01 Login and campus authentication | Establish a session and verify campus identity | Verification code failure, name not on the list, authorisation refused |
| SC-02 Owner publishes and searches | Publish a lost-item post and search found-item posts with combined filters | Missing fields, image failure, no results |
| SC-03 Finder publishes, candidates generated | Publish a found-item post, process images, generate candidates | Masking or moderation failure, algorithm unavailable |
| SC-04 Claim evidence review | Submit private details and supporting proof, reviewed by a human | Insufficient evidence, duplicate requests, disputes |
| SC-05 Handover confirmation and disputes | Agree a handover, both sides confirm separately | One-sided confirmation, timeout, concurrent retries |
| SC-06 Content moderation and reports | Moderate content under authorisation, handle reports and dictionaries | Privilege escalation, missing reason, insufficient evidence |
| SC-07 Message preferences and optional aids | View pending items, control preferences and optional subscriptions | WeChat message failure, target no longer available |
| SC-08 Metrics and pilot retrospective | Recompute statistics over a fixed window | Zero denominator, insufficient sample |
4.3 Main flow illustrated with a folding umbrella
An owner realises a folding umbrella is missing, completes campus authentication, and publishes a photo, time, place and public description. A finder publishes a found-item post and states where the item is actually kept. After processing the images, the system returns candidates, and the user can look further using the similarity score and the real match reasons.
Once both sides accept, the claimant fills in details that are not visible in the public photo and may provide an old photo or other proof. The finder, or an authorised staff member, reviews the evidence by hand and records the decision and the reason. After approval the two sides agree an offline handover, confirm separately that the item was received or handed over, and the system closes the case and updates the statistics exactly once.
If the algorithm fails, publishing and manual search still work; if evidence is insufficient, it is sent back for completion; if only one side confirms, the case stays pending; if a dispute arises, it goes to manual handling. Real questionnaire and interview results from M1 are still outstanding, and the concrete item in the scenario is not treated as a survey sample.
5 Class model and domain model
5.1 The fourteen core classes
Beyond the entity descriptions, this round adds a UML class model with the key attributes, operations and relationships between classes.
| Class ID | Class name | Responsibility |
|---|---|---|
| C01 | User | Account, campus identity and participation permission |
| C02 | Item | A lost or found post and its state |
| C03 | ItemPhoto | Original image, masked derivative and processing state |
| C04 | MatchCandidate | Candidate link between posts of opposite type, with reasons and feedback |
| C05 | Case | Claim, verification, handover and dispute case |
| C06 | VerificationChallenge | Non-public claim question configured by the finder |
| C07 | VerificationEvidence | Private evidence and review record submitted in the current case |
| C08 | HandoverConfirmation | One handover confirmation by a single participant |
| C09 | CreditRecord | Confirmed credit event and its appeal status |
| C10 | Notification | In-app notification and channel delivery state |
| C11 | Subscription | A user's optional subscription condition and on/off state |
| C12 | Report | Reported object, reason and handling result |
| C13 | AuditLog | Audit record carrying the target type and the operator |
| C14 | ServicePoint | Service point with confirmed cooperation and authorised operations |



A post owns 1–6 images and may configure 0–3 non-public questions. A case links one found-item post and optionally one lost-item post, and the two parties must be different users. A case may have several pieces of evidence, but a normal handover has at most two confirmations, enforced by UNIQUE(caseId, userId) so that one person cannot occupy both sides.
Service points are in an aggregation relationship with items. Retiring a service point must not delete the history of items and cases. Reports and audit logs record both the target type and the target identifier, so no object can be read merely by passing a client-side ID.
5.2 Two state machines
The item state describes whether a post is still matchable, has been returned, or has been archived; the case state describes acceptance by both sides, evidence review, handover arrangement, confirmation and dispute handling. An ordinary closure, a cancellation or an expiry-based archive must never be counted as a successful return.


5.3 Persistence view
The ER view continues to express the main tables and foreign-key relationships, and works with the class model to explain how data is stored. Operations on a class are not equivalent to database columns.

6 Interface prototypes
6.1 Page structure
The prototypes cover both the student side and the administration side. Visitors may browse; publishing redirects to authentication; an unverified user cannot enter the handover flow; the administrator entry point is permission-checked on the server.

| Prototype | Page | Key requirement |
|---|---|---|
| UI-01 | Home and search | Keyword plus category, place and date filters; loading, empty result and error states are distinguished |
| UI-02 | Publish lost / found item | Required-field checks, 1–6 images, custody location, input preserved on failure |
| UI-03 | Item detail | Publicly masked information only; available actions depend on identity and state |
| UI-04 | Candidate matching | Real ranking reasons, relevance feedback and the acceptance state of both sides |
| UI-05 | Submit claim evidence | Private answers and optional proof; the reference answer is never shown |
| UI-06 | Handover confirmation | Both sides' states shown separately; one side cannot close the case |
| UI-07 | Messages and cases | The user's own pending items, case timeline and authorised conversation |
| UI-08 | Profile and preferences | Verification state, my posts, message preferences and appeals |
| UI-09 | Administrator moderation | Moderation queue, necessary evidence, mandatory reason and operation log |
| UI-10 | Statistics and pilot dashboard | Statistics window, sample size, numerator and denominator, and the no-data state |
| UI-11 | H5 login and campus verification | Campus e-mail and student ID verification, with an authorised manual path |
| UI-12 | Configure questions and review evidence | Non-public questions, current case material, manual decision and reason |
6.2 Prototype showcase
The four showcase figures below together contain all 12 prototypes. Because the class session allows less than 8 minutes, the presentation only walks through the first two groups (slides 10–11, UI-01/02/03 and UI-04/05/12); the other six interfaces are on backup slides (19–20). Chapter 5 of the SRS gives the controls A–E, inputs and outputs, linked FRs and exception feedback for each page.




This version completes the basic requirement prototypes. High-fidelity design, walkthroughs with real users, and verification of the differences between H5 and the mini program continue in M2; the figures are not presented as finished interfaces.
7 Functional requirements and traceability
7.1 Requirement list and priorities
The original 42 FR identifiers are kept and classified with MoSCoW as 21 Must, 16 Should and 5 Could, grouped into 18 modules. Must items have to be satisfied, Should items allow a reasonable substitute, and Could items are implemented according to time and resources.
The core modules are account and campus identity, publishing lost and found items, browsing and search, image processing, candidate generation and re-ranking, messaging, evidence review, handover, credit and appeals, administration and statistics. Each FR records its inputs, outputs, source scenario, iteration and acceptance conditions in Chapter 6 of the SRS.
Automatic tagging is an optional aid, but FR-18.3, the tag privacy boundary, remains a Must. Turning the suggestion feature off does not lift the privacy requirements on public content.
7.2 Five-way traceability example
| User scenario | Functional requirement | Core classes | Interface | Functional verification |
|---|---|---|---|---|
| SC-02 Owner publishes | FR-02.1 | C02, C03 | UI-02 | FT-02.1 |
| SC-04 Claim review | FR-11.1 | C05, C06, C07 and others | UI-05, UI-12 | FT-11.1 |
| SC-05 Handover confirmation | FR-12.1 | C05, C08 and others | UI-06 | FT-12.1 |
| SC-07 In-app reminder | FR-09.1 | C10 and others | UI-07 and others | FT-09.1 |
The complete matrix covers all 42 FRs. The original 41 use cases are retained as a use-case index; scenarios, use cases and functional requirements are allowed to map many-to-many, so their counts do not have to match. This round filled in the traceability gaps for FR-07.1, FR-07.2 and FR-18.3.
8 Non-functional requirements and acceptance
8.1 Performance and capacity targets
| Item | Target and test conditions |
|---|---|
| Pilot resources | 8 CPU cores, 16 GB memory |
| User scale | 300 registered users, recorded separately from concurrency |
| Concurrency test | 50 concurrent virtual users running for 10 minutes |
| Item pool | 10,000 items |
| Response targets | List or detail P95 under 1 s, search under 800 ms, candidates under 1.5 s |
| Image processing | CPU single-image embedding under 2 s; 3 compressed images transferred in under 3 s under the agreed 4G conditions |
| Test record | Hardware, network, sample, request mix, error rate, throughput and resource peaks; cold start reported separately |
All of the above are targets still to be verified. P95 is the 95th percentile of the latency distribution and cannot be replaced by an average. Image transfer time is measured separately from user input and embedding generation.
Security requirements include HTTPS, role-based and object-level permissions, task-based authorisation for original images and private answers, masking of public images, and a clear statement of deactivation, deletion and retention scope. When the algorithm service is unavailable, legitimate publishing and basic search must still work; repeated confirmations must not close a case twice, add credit twice or double-count statistics.
8.2 Five acceptance categories
| Category | Method | Pass criteria |
|---|---|---|
| Interface | Prototype walkthrough with at least 5 first-time users performing tasks | Entries, controls and exceptions are consistent; the standard publish task after authentication takes no more than 30 s |
| Function | 42 FTs mapped to FRs, including positive, privilege-escalation, retry and state counter-examples | Inputs, outputs and per-item acceptance conditions are satisfied |
| Non-functional | Load, permission, failure, dual-platform and backup-recovery verification | The corresponding NFRs are met and checkable records are retained |
| Match quality | Frozen independent labelled set, checked query by query | Hit@5 is reproducible and reaches the threshold and latency confirmed in M2 |
| Controlled pilot | 30–50 students planned over two weeks on the H5 pilot | No serious privacy, permission or case-closure blocking defect; actual sample and results reported |
8.3 Definitions of the three metrics
Recovery rate: with a fixed publication cohort and observation cut-off, N is the number of valid lost-item posts and R the number confirmed as recovered; the recovery rate is R / N × 100%. When N is zero the display reads "no data". Re-confirming the same case must not increase R again.
Median time to return: for the recovered posts in that cohort, compute "final confirmation time minus publication time of the lost-item post", and report the median together with the number of recovered samples and the number still unresolved. When there is no recovered sample, 0 hours must not be shown.
Hit@5: Q is the number of queries in the independent test set that have a known true counterpart, and H the number of queries where at least one of the top five candidates is a true counterpart; the value is H / Q × 100%. A query using several images still counts once, and photos of the same physical item must not be split across the tuning and test sets. Online relevance feedback is counted separately.
The quality threshold, minimum sample size and false-reminder threshold of Hit@5 are recorded as TBD-07 and will be confirmed in the M2 review. This section explains the evaluation method; it does not report accuracy or recovery improvement that has not been measured.
9 Delivery form and technology choices
9.1 H5 as the primary delivery, mini program for demonstration
Following the frontend feasibility assessment, this semester uses uni-app, Vue 3 and TypeScript: one shared codebase compiled to a mobile H5 site served over HTTPS as the primary controlled pilot, with the WeChat mini program used as the development and demonstration form. The administration side is a role-authorised web console.
Compiling from the same source does not remove the need to adapt each platform: login, camera upload, routing, background behaviour and notifications must still be implemented and verified separately. WeChat login cannot by itself prove campus identity, so the rules for campus e-mail, student ID and the authorised pilot list still need to be confirmed in practice.
Core messages are kept in the in-app list and badge. WeChat subscription messages depend on user authorisation, templates and the platform environment; a refusal or a failed delivery must not block the business flow. The platform entity, domain name, package size and quotas will be verified in M2, and earlier estimates are not presented as current platform commitments.
9.2 Backend and algorithm service
SRS v1.3 has fixed the business backend stack as C# / .NET + ASP.NET Core (Web API); the database MySQL 8, cache Redis 7, object storage, Nginx and Docker are unchanged. The decision was proposed by the team's technical lead and confirmed within the team; section 2.4 of the SRS, the revision record and slide 12 of the presentation have been updated and state the same thing.
The change affects only the implementation layer and alters no user behaviour, permission, state or acceptance requirement in this document: the entity fields in Appendix D and the REST endpoints in Appendix E are independent of programming language, so the conclusions of Chapters 3–8 remain valid. The .NET runtime version, the data-access approach and the re-work of the interface contract are recorded as TBD-13 and will be confirmed in M2 (19 October – 1 November); until that item is closed we do not claim the backend is ready.
The algorithm service remains an independent Python service; CLIP, ResNet, FAISS and similar options will be compared in M2. The frontend reaches it through the business API and never connects directly to the algorithm intranet or holds object-storage keys.
10 Key difficulties and consistency revisions
10.1 Entity tables cannot fully express the business model
The raw material already contained data entities and interface information, but it still had to explain what operations an object has and how objects constrain each other. This round added class attributes and operations, multiplicity, composition and aggregation, and used Case to connect verification, handover and credit events. The ER view continues to express the persistence relationships.
10.2 Similar images cannot prove ownership
Similarity is good for generating candidates but cannot carry an ownership decision. Reference answers to claim questions are not disclosed, private evidence is isolated per case, and a manual review conclusion must record the operator, the time and the reason. Insufficient evidence can be completed or escalated to manual handling, and there is no rule under which "identical free text means automatic approval".
10.3 External notification and campus identity depend on platforms
Making mini-program publication or WeChat message delivery a prerequisite of the main flow would tie business availability to platform conditions that have not been verified. We therefore use H5 as the primary delivery and in-app messages as the core channel, and keep platform verification as a separate task. Service points and the pilot list likewise require real cooperation and authorisation.
10.4 Case closure and metrics must stay consistent
Archiving an item does not mean it was returned, and one-sided confirmation does not mean the handover is complete. State conditions, checks that the participants are different, unique constraints and idempotent handling prevent a repeated confirmation from closing a case and incrementing statistics more than once. Credit records are appended only for genuine completions or events confirmed by investigation; failed verification and unverified reports cannot lead directly to a penalty.
10.5 Unified baseline across the three deliverables
| Item | Unified result in this round |
|---|---|
| Requirement count | 42 FRs: 21 Must, 16 Should, 5 Could |
| Scenarios and model | 8 scenarios, 14 core classes, two state machines |
| Prototypes | 12 basic prototypes; high fidelity and user walkthroughs continue in M2 |
| Student-side delivery | H5 is the primary controlled pilot; the mini program is for development and demonstration |
| Verification and messaging | Private evidence reviewed by a human; in-app messages as the core channel |
| Backend stack | C# / .NET + ASP.NET Core (Web API); the algorithm service remains an independent Python service |
| Host resources | The runtime environment, NFR-02 and the presentation all use 8 CPU cores and 16 GB memory |
| Acceptance conclusion | Targets are kept separate from measured results; real research, tests and review records are still to be completed |
10.6 The technology change and synchronising three deliverables
The most time-consuming rework of this round happened on the day of submission: the team's technical lead asked for the business backend to be switched to C#, while the SRS, the presentation and this blog had already been finalised on the Java stack and referenced each other.
The difficulty was not in changing a few words but in the number of places each document referenced: the stack row in section 2.4 of the SRS, the revision record, the open items in 9.2; the "current requirement and solution" row on slide 12 of the presentation, the pending-decisions list on slide 13, and the version reference in every slide's speaker notes; and, in this blog, the version history, the attachment file names and the page references. Any one of them left behind would be enough for a reviewer comparing two files to spot a contradiction.
The order we worked in was: first raise the SRS to v1.3 and record the source of the change in the revision history; then change the two statements in the presentation and the pending-decision item; finally rewrite the version references in the blog against v1.3. At the same time we added TBD-13 to register "runtime version, data-access approach and interface-contract rework" as an item to be closed in M2, rather than hiding unfinished work behind a single sentence saying "already switched".
The rework also confirmed one thing: as long as a requirements document does not couple implementation details into its body, switching language is a one-line change to the stack row — the data tables in Appendix D and the interfaces in Appendix E were never language-specific, so not a word of Chapters 3–8 had to change.
11 Project plan and open items
11.1 Planned schedule
The dates below are planned; results will be updated against actual records.
| Phase | Dates | Main acceptance content |
|---|---|---|
| M1 Requirement analysis | 12–18 October | Requirements, model and prototypes produced; if the real research record is not closed, evidence is added in the next version |
| M2 Design and feasibility | 19 October – 1 November | High fidelity, identity and platform verification, .NET landing validation, algorithm and sample thresholds confirmed |
| It.1 Publish and search | 2–9 November | One side publishes, the other finds it by category, place and keyword |
| It.2 Candidates and reminders | 10–19 November | Candidates are traceable, in-app pending items are visible, manual search survives an algorithm failure |
| It.3 Verification and handover | 20–29 November | Manual review, independent confirmation, idempotent closure and dispute handling |
| Controlled H5 beta | 30 November – 13 December | 30–50 people planned for two weeks; actual participation, problems and metrics recorded |
| Wrap-up and showcase | 14–27 December | Result analysis, document archive and final showcase, adjusted to the course arrangement |
11.2 Open items
| Item | Responsible role | Planned closure |
|---|---|---|
| Real questionnaire, interviews, valid sample and requirement adjustments | Requirements group | M1; evidence added in the next version if missing |
| Service-point cooperation and the actual transfer flow | Team lead, requirements group | M1; the path stays closed if unconfirmed |
| Campus identity rules, H5 address and deployment resources | Requirements, front and back end, operations | M2, no later than 1 November |
| Algorithm, independent labelled set, Hit@5 threshold and minimum sample | Algorithm, testing, requirements | M2, frozen before the pilot |
| Mini-program platform conditions, dual-platform differences and end-to-end messaging | Frontend, backend, testing | Verified in M2, complete by It.2 |
| Actual contribution shares, review sign-off and public attachment links | Team lead and all members | Before the assignment-3 submission |
| Credit scoring and whether it affects candidate display | Requirements, algorithm, administration | Confirmed before It.3 is enabled |
The SRS keeps a complete list of 13 TBD items. Document modelling that is finished and research, development and testing that are still outstanding are tracked separately: the planned number of pilot invitees is not treated as an actual sample, and existing prototypes are not treated as a completed beta.
12 Requirement analysis presentation
The presentation has 25 slides — 15 spoken, 3 appendix and 7 backup — each with speaker notes. The class requires a presentation of less than 8 minutes, so the spoken part is paced at about 7 minutes 15 seconds, leaving roughly 45 seconds of buffer; the remaining slides are kept as backup and can be called up during questions.
| Slide | Topic |
|---|---|
| 1 | Cover and presenter |
| 2–3 | The four problems; user roles and project scope |
| 4–5 | The eight user scenarios; the business flow from publishing to return |
| 6 | Functional requirements and priorities (21 Must / 16 Should / 5 Could) |
| 7–9 | Three core class diagrams: publishing and matching, verification and handover, administration and service points |
| 10–11 | Six core interface prototypes: search and publish, candidates and evidence review |
| 12 | Delivery form and system boundary |
| 13 | Iteration plan and pending decisions |
| 14 | Team division of labour and workload share |
| 15 | Summary: problem, MVP and verification |
| 16–18 | Appendix: users and use-case overview; the complete 42 functional requirements |
| 19–25 | Backup: the other six interface prototypes → performance and security → five acceptance categories → two state machines → three metric definitions and the five-way traceability matrix |
To fit the 8-minute limit, a division-of-labour slide was first added to the completed 24-slide version (making 25), and then four kinds of adjustment were made: the "page structure navigation" slide, which duplicated the prototype slides, was removed; the two state machines, the three metric definitions and the five-way traceability matrix were moved to backup; performance and security, and the five acceptance categories, were also moved to backup; and the interface prototypes were reduced from 4 slides to 2, walking through only the six interfaces that carry the main line (UI-01/02/03 and UI-04/05/12), with the other six interfaces on backup slides. A closing slide, "Summary: problem, MVP and verification", was added at the end.
The presentation explains how the system works using the model, the flow and the prototypes; per-item inputs and outputs, detailed business constraints and the full traceability matrix are in the SRS. The division of labour and contribution shares are on slide 14 and match section 1.2 of this blog.
13 References
- Third assignment — Requirement Analysis.
- Gamers2 second assignment — team formation and topic selection.
- Software Requirements Specification — 拾光 FindBack, v1.3, attachment to this submission.
- 拾光 FindBack Assignment 3 — Requirement Analysis Presentation, attachment to this submission.
- Frontend Technology Feasibility Assessment — WeChat Mini Program, project technical assessment material.
- GB/T 9385-2008 Specification for computer software requirements specifications, GB/T 8567-2006 Specification for computer software documentation, IEEE 830-1998 — references for the document structure.
- Zou Xin, The Method of Construction, Chapter 8 — reference for requirement analysis.
- DCloud conditional compilation documentation.
- Microsoft ASP.NET Core Web API documentation — technical reference for the backend stack.
相关推荐
国央企创新负责人如何通过平台实现科研成果的快速识别与转化?.docx
科易网基于AI模型+行业大数据,在技术转移、成果转化、技术经纪、知识产权、产业创新、科技招商等垂直领域的多样化应用场景,推出科技创新领域的AI+工具与数智化解决方案,推动科技创新与产业创新智能化发展。
PotPlayer自用皮肤
自用 PotPlayer 皮肤,仅微调了字体大小与颜色,是按个人习惯调整,未做适配性调整。
2-shell及常用命令-续.pdf
2-shell及常用命令-续.pdf
【电力负荷预测】项目介绍 MATLAB实现基于BO-Transformer-LSTM贝叶斯优化算法(BO)优化Transformer-LSTM组合模型进行居民用户多步电力负荷预测(含模型描述及部分示例
内容概要:本文介绍了一个基于BO-Transformer-LSTM的组合模型,用于实现居民用户多步电力负荷预测的完整项目实例。该模型融合Transformer的全局注意力机制与LSTM的局部时序记忆能力,构建能够捕捉长时依赖与周期性特征的深度学习架构,并引入贝叶斯优化(BO)自动搜索最优超参数组合,提升预测精度与训练效率。项目涵盖从原始数据清洗、特征工程、滑动窗口样本构建、模型设计到超参数优化、反归一化及多步误差评估的全流程,强调时间顺序划分以防止信息泄露,并通过周期编码、外生变量融合等方式增强数据表达能力。文中提供了详细的MATLAB代码示例,包括数据预处理、网络搭建、贝叶斯优化配置和预测结果评估等关键步骤。 适合人群:具备一定机器学习和时间序列分析基础,熟悉MATLAB编程环境,从事电力系统预测、智能电网、负荷管理等相关领域的研究人员、工程师及研究生。 使用场景及目标:①应用于居民级或多用户聚合负荷的短期至中期多步预测(如未来24小时);②服务于配电系统运行调度、需求响应基线设定、家庭能源管理系统优化、分布式能源协调控制等实际工程场景;③为科研提供可复现的深度学习+贝叶斯优化的技术路线参考。 阅读建议:此资源以实际项目为导向,建议读者结合提供的代码逐步实现并调试模型,重点关注数据质量控制、时间特征编码、组合网络结构设计与贝叶斯优化稳定性之间的协同关系,在实践中深入理解多步预测中的误差累积机制与超参数敏感性问题。
【无人机航测】MATLAB重叠率与地面分辨率协同设计:航线间距及飞行方向优化系统 MATLAB 无人机航测重叠率设计|地面分辨率与航线间距计算
内容概要:本文档介绍了基于MATLAB R2025b开发的无人机航测重叠率与航线间距计算系统,旨在通过建立统一的航测几何计算体系,实现重叠率、地面分辨率与航线间距的动态协同设计。系统结合相机参数、飞行参数、地形数据与风场信息,通过自动化候选航向搜索与多目标优化,选择兼顾覆盖质量、飞行效率与安全性的最优航线方向。项目涵盖从参数输入、摄影测量计算、地形与安全修正,到候选路线生成、综合评价与结果可视化的全流程,并构建了五万组模拟数据用于算法验证与模型训练,支持桌面交互、批量处理与服务化部署,适用于多种复杂场景下的无人机航测任务规划。 适合人群:具备一定MATLAB编程基础和摄影测量知识的科研人员、工程技术人员及高校师生,尤其适合从事无人机航测、地理信息系统(GIS)、遥感与测绘等相关领域的从业者。 使用场景及目标:① 实现无人机航测任务中地面分辨率与航线间距的精确计算与动态优化;② 解决复杂地形与风场环境下航线方向选择困难、覆盖质量难以保障的问题;③ 通过自动化设计减少人为经验依赖,提升航测任务的可靠性与效率;④ 为后续的三维建模、正射影像生成与灾害应急评估等应用提供高质量的数据基础。 阅读建议:建议读者结合文中提供的完整代码示例与GUI界面设计,逐步实践参数配置、模型计算与结果分析流程。重点关注摄影测量公式推导、地形修正策略与多目标优化算法的实现细节,并利用模拟数据进行敏感性分析与模型验证,以深入理解系统的设计理念与工程应用价值。