Gruop8_GOAT_666 Alpha Sprint: Code Standards, sprint Tasks, and Plans
GOAT_666 Alpha Sprint: Code Standards, sprint Tasks, and Plans
| Item | Details |
|---|---|
| Course | EE308FZ Software Engineering |
| Assignment requirements | Fifth Assignment Alpha Sprint https://bbs.csdn.net/topics/620611106 |
| Team | GOAT_666 |
| Project | Shanhai‑Travel Platform(山海行在线旅行平台) |
| Sprint period | November 21–28, 2026 |
| Assignment objective | Define practical coding standards, organize four two‑day iterations, and establish verifiable acceptance criteria for the Alpha phase. |
| Project repository | ZZH666-A11Y/shanhai-travel: EE308FZ GOAT_666 team project - Shanhai-Travel online travel platform, prototype assets for assignment4 |
1 Project Starting Point and Alpha Objectives
Shanhai‑Travel Platform is a web‑oriented travel service platform. We have finished requirement specification documents, domain class diagram and high‑fidelity Figma prototype in previous assignments. The prototype covers visitor browsing, simulated booking, travel‑note publishing, comment‑rating‑favorite and administrator resource‑maintenance flows.
Our backend uses SpringBoot + MyBatis‑Plus, frontend uses Vue3 + Element‑Plus, and MySQL for persistent storage. Frontend code is placed under src/, API request modules are separated into src/api/. Backend code is organized by controller, service, mapper, entity, DTO layers.
The Alpha sprint objective: build up the full‑stack baseline, implement core P0 workflows derived from SRS v1.4, fix boundary defects from prototype review, verify complete user journeys, and produce runnable demo for presentation. Four two‑day iterations are adopted for development, testing and documentation.
Scope priority: visitor information browsing, registered‑user simulated booking & order management, travel‑note publish‑interact, administrator content maintenance. Personalized recommendation and AI travel assistant are extension features and out‑of‑scope for Alpha phase. Large‑scale architecture reconstruction will not be performed in this 8‑day sprint.
2 Team Code Standards
These conventions apply to newly‑added and modified code in Alpha sprint. It does not require all legacy hypothetical prototype‑code to be fully refactored. We take Alibaba Java Coding Guidelines (v1.3.0) as backend reference, and Vue3 official style guide for frontend.
2.1 Naming Formatting and Responsibilities
| Area | Team convention |
|---|---|
| General | File encoding uses UTF‑8. Use self‑explicit naming. Keep formatting modification limited to functional‑related files. Comments focus on business rules, special constraints and design decisions. |
| Vue3 Frontend | Two‑space indentation. Component name uses PascalCase; variables, functions use camelCase. Define explicit TypeScript interfaces for request/response payloads. Reuse existing components and api‑request wrappers. UI rendering logic stays in components; raw HTTP logic is encapsulated under src/api/. |
| SpringBoot Backend | Four‑space indentation. Class name uses UpperCamelCase; method/variable uses lowerCamelCase; constants use UPPER_SNAKE_CASE. Entity, DTO, VO follow DO/DTO/VO suffix specification. Controller handles HTTP entry and parameter receiving; Service implements business logic and permission verification; Mapper completes database access. Avoid duplicated validation logic. |
| Database | Table and column names use snake_case. Logical deletion (is_deleted) is adopted instead of physical deletion. Field length constraints are consistent between database table, backend validation and frontend input limit. |
2.2 API Validation and Data Rules
Unified API response wrapper: {code, message, data}. Success status code uses 200. Parameter validation failure returns HTTP 422. Business‑level error returns custom non‑200 code with human‑readable message.
Even if frontend has done input check, backend must repeat parameter validation and permission judgment. Users can only modify their own orders, travel‑notes and comment resources. Database operations must use parameterized query to prevent SQL injection.
For simulated‑booking business rules: inventory deduction and roll‑back must keep atomicity. Tiered simulated‑refund rules defined in SRS must be strictly followed. Repeated submission requests need idempotent protection to avoid over‑deducting inventory.
For travel‑note publish: title length limit, content empty‑judgment, picture upload constraints are consistent for create and edit interfaces. Existing historical data shall not be silently truncated.
2.3 User Feedback & Configuration Management
Frontend gives clear prompt for validation failure. Preserve user‑input content after submission failure where possible. Disable submit button during pending request to prevent duplicate clicks. After successful submit, page data should refresh correctly.
Prohibit committing real database password, token, private key, local .env secrets into repository. Keep sample configuration template without sensitive information. Test environment uses independent test accounts and test database data.
2.4 Git Workflow and Review
main branch keeps stable reviewed integration code. Feature branches follow naming convention: feat/xxx‑module, fix/xxx‑bug, docs/sprint‑material. Before development, synchronize local repository with remote origin.
Each development task corresponds to one GitHub Issue, including background description, acceptance criteria, assignee and verification approach.
Commit message format: feat: xxx, fix: xxx, test: xxx, docs: xxx, clearly describe what this change does.
Pull request must link corresponding Issue, attach brief change description and verification evidence screenshot. Cross‑review is required for code that changes front‑backend interaction contract. Defect tickets can be closed only after tester provides verification evidence.
2.5 Pre‑Merge Verification Checklist
| Change scope | Required verification |
|---|---|
| Frontend | npm run build, eslint check; test corresponding browser user‑flow, check UI prompt and interaction. |
| Backend | Run unit test for modified service/mapper layer; verify interface via postman/swagger; check permission boundary and parameter validation. |
| Integrated workflow | Complete end‑to‑end manual test for full user‑journey; capture runtime screenshots for evidence. |
| Document & blog | Check task status, hyperlink validity, screenshot caption, consistency between description and actual evidence. |
Record test commit id, database environment, passed / skipped / failed test items in sprint essay as evidence. Skipped test case cannot be treated as verified.
3 Sprint Tasks and Acceptance Criteria
There are total 12 work packages for Alpha sprint, each counts as one item for burn‑up chart. Completion standard is passing acceptance criteria, not coding finished.
| ID | Iteration | Planned task | Acceptance criterion |
|---|---|---|---|
| A01 | Sprint 1 | Build local full‑stack environment, confirm project baseline | Frontend & backend start locally; database connection normal; baseline commit id is recorded. |
| A02 | Sprint 1 | Sort out and import database initial test data | Destination, attraction, commodity, user mock data are imported; table structure matches SRS domain class diagram. |
| A03 | Sprint 1 | Realize visitor browsing core page interfaces | Destination / attraction / guide / commodity query interfaces complete; visitor can browse public content without login. |
| A04 | Sprint 1 | Frontend docking browsing module, reproduce prototype page | Homepage, destination detail, commodity detail page render normally; navigation jump consistent with Figma prototype. |
| A05 | Sprint 2 | Implement user register‑login‑logout and permission interception | Register, login, logout interfaces finished; visitor / logged‑in‑user / administrator permission separation takes effect. |
| A06 | Sprint 2 | Develop simulated‑booking and order‑management backend logic | Submit simulated‑order, query‑order, cancel‑order, simulated‑refund logic finished; inventory deduction & roll‑back works correctly. |
| A07 | Sprint 2 | Front‑end docking booking‑order module, complete page interaction | Simulated booking submit, my‑orders list, cancel‑order popup and refund prompt work as prototype designed. |
| A08 | Sprint 3 | Realize travel‑note publish‑edit‑delete and comment‑rating‑favorite module | Backend interfaces finished; create / edit / delete travel note; publish comment, rating, add‑favorite function valid. |
| A09 | Sprint 3 | Realize administrator resource‑maintenance interface | Admin can maintain attraction‑guide‑commodity resources, audit user‑generated content; ordinary users cannot access admin page. |
| A10 | Sprint 4 | System‑wide regression test, fix found defects | All P0 core user‑journeys pass manual test; high‑severity bugs are fixed; low‑priority defects are recorded with status explanation. |
| A11 | Sprint 4 | Verify project build and demo reproduction steps | Frontend can build successfully; document clear startup steps for demo presentation environment. |
| A12 | Sprint 4 | Organize test cases, runtime screenshots, blog and presentation materials | Test‑essay material, sprint summary evidence, defense‑PPT materials are sorted and linked. |
Iteration strategy: Sprint1 establishes baseline and visitor browsing capability; Sprint2 completes account system plus simulated‑booking core business; Sprint3 implements community note and administrator module; Sprint4 executes regression testing, bug‑fixing and deliverable sorting. If prerequisite task fails, fix or record risk before expanding new feature scope.
4 Team Responsibilities
Zihan Zhao acts as project coordinator, responsible for overall progress tracking, cross‑group communication, document integration and repository management.
| Group | Members | Alpha responsibilities |
|---|---|---|
| Frontend Group | Liucheng Wang, Zexin Zhang, Hongfu Zhao, Wenjie Yan | Complete frontend page development, docking backend API, restore prototype interaction effect, provide runtime screenshot evidence. |
| Backend & Database Group | Ruizhi Liu, Haomin Lin, Xinyang Zhang, Zerui Xie, Longzhe Lin | Implement backend interfaces, database table operation, business‑logic development, permission & data consistency guarantee, code review. |
| DevOps | Qihang Peng | Environment configuration, branch management, build verification, assist joint debugging between front‑backend. |
| Test Group | Minghao Zhang, Zhihua He | Write test cases, execute manual system test, record defects, track bug repair progress, organize test‑evidence screenshots. |
| Document & Presentation Group | All partial members | Maintain burn‑up chart, write four sprint‑essays, testing‑essay and summary‑essay, complete defense‑PPT. |
UI‑prototype is the requirement baseline for frontend development. Developers provide tested running version; test group executes test based on that exact version; document group uses confirmed task status to draw burn‑up chart. Only satisfying acceptance‑criterion counts as completed task; joining a group does not equal task completion.
5 Four Iterations and Publication Schedule
Total sprint window: Nov 21‑Nov 28, 2026. Final assignment deadline: Nov 29, 23:59.
| Period | Engineering focus | Expected evidence and publication |
|---|---|---|
| Nov 21‑22 | A01‑A04: environment setup, initialize test data, implement visitor‑browsing back‑end and front‑end pages | Baseline commit record, database initialization script, page runtime screenshots, Issue & commit links, Sprint Essay 1. |
| Nov 23‑24 | A05‑A07: account system development, simulated‑booking‑order‑refund business logic, front‑end docking booking‑related pages | Register‑login test screenshots, booking‑submit / cancel‑order demo screenshots, regression test records, Sprint Essay 2. |
| Nov 25‑26 | A08‑A09: travel‑note‑comment‑favorite module and administrator‑maintenance module development & joint‑debug | Community‑note publish‑interact runtime evidence, admin‑page demo screenshots, defect‑record links, Sprint Essay 3. |
| Nov 27‑28 | A10‑A12: full‑system regression test, bug‑fix, verify build‑demo environment, organize all assignment deliverables | Defect list & repair status, demo startup instructions, test‑case documents, runtime gif/screenshots, Sprint Essay4, Testing Essay. |
| Nov 29 | Team member personal reflection collection, integrate all blog links, finish defense‑PPT, submit assignment | Sprint Summary Essay, top‑level collection blog, complete GitHub repository materials, finish class‑assignment submission before 23:59. |
Planned cumulative completed‑task milestone: 4/12 after sprint1; 7/12 after sprint2; 9/12 after sprint3; 12/12 after sprint4. These are expected targets. Unfinished tasks will be recorded with reason and carried forward to next phase.
6 Progress Tracking and Evidence
Project burn‑up chart takes A01‑A12 as total task scope. Two lines are drawn: total planned scope line and cumulative accepted‑task completion line. Task counts only when acceptance criteria are fully satisfied.
Blog publication work is tracked separately from engineering task count. Publishing blog cannot be counted as finished development task.
Each Sprint Essay must contain: current burn‑up chart, project runtime screenshots/gif, completed & unfinished task list, encountered obstacles & solutions, next‑iteration priority.
- Development work: attach GitHub Issue link and corresponding commit record screenshot.
- Testing work: attach test‑case, defect‑report, screenshot evidence.
For simulated‑booking function: keep evidence for normal booking, stock‑insufficient boundary, cancel‑order, tiered simulated‑refund result. For permission‑control: record visitor / logged‑in‑user / administrator interface difference screenshots. Distinguish manual‑test evidence from automated‑test output.
7 Risks and Scope Control
| Risk | Planned response |
|---|---|
| Prototype‑UI requirement understanding deviation leads to inconsistent front‑end effect. | Compare frontend page against Figma prototype after each module docking; record deviation and fix in time. |
| Simulated‑booking inventory deduction / refund logic appears data inconsistency. | Add manual boundary test for order‑submit and cancel‑order; record abnormal‑reproduce steps once found. |
| Front‑backend interface contract mismatch causes joint‑debug blocking. | Agree on DTO‑field definition before coding; modify Issue record when contract changes. |
| Too many defects appear in late phase and cannot finish all 12 tasks. | Prioritize P0 core user‑journey; low‑priority defects will be documented and postponed to follow‑up iteration. |
| Blog material collection lags behind development progress. | Collect screenshot and commit evidence immediately after each round of testing; finish sprint‑essay every two‑days, reserve time for CSDN blog review‑delay. |
8 Assignment Deliverables
The fifth assignment includes seven main blog posts plus one top‑level collection‑essay:
- This Code Standards, Sprint Tasks, and Plans post.
- Four Sprint Essays (one every two‑days).
- One independent Testing Essay: introduce testing arrangement, tool selection, test‑case documents, test‑execution results, experience and project evaluation.
- One Sprint Summary Essay: compare actual progress vs initial plan, every‑member reflection, teamwork and workload‑distribution, next‑stage outlook.
- Topical Collection of Essays: index page linking all above seven blog posts.
Besides blog deliverables, we will prepare defense‑PPT for classroom presentation, including burn‑up chart, project runtime demonstration, completed‑work, unresolved‑issues and future‑plan.
All deliverables shall be completed and submitted before Nov 29, 2026, 23:59. Ensure GitHub repository links and CSDN blog links are publicly accessible.
References
- Fifth Assignment Alpha Sprint requirement: https://bbs.csdn.net/topics/620611106
- GOAT_666 Assignment 2 blog: https://bbs.csdn.net/topics/620546966
- GOAT_666 Assignment 3 blog: https://bbs.csdn.net/topics/620556448
- GOAT_666 Assignment 4 blog: https://bbs.csdn.net/topics/620574903
- Alibaba Java Coding Guidelines Ultimate Edition v1.3.0
- Vue3 Official Style Guide
- MyBatis‑Plus Official Documentation
相关推荐
【无人机路径规划】基于差分进化算法的三维航迹优化模型:Python实现与多目标适应度设计 项目介绍 Python实现基于差分进化算法(DE)进行无人机三维路径规划(含模型描述及部分示例代码)
内容概要:本文详细介绍了一个基于Python的无人机三维路径规划项目,采用差分进化算法(DE)在复杂三维环境中自动搜索从起点到终点的安全、高效飞行路径。项目构建了包含空间边界、起点、终点和多个长方体障碍物的三维环境模型,通过路径编码、适应度评估、差分进化优化及路径后处理四个核心环节实现路径规划。适应度函数综合考虑路径长度、碰撞惩罚、安全距离、转弯与爬升代价等因素,确保路径在安全性、平滑性和可行性之间取得平衡。算法通过变异、交叉和选择操作迭代优化种群,并引入路径简化机制减少冗余航点,提升可执行性。代码实现了完整的优化流程与三维可视化功能,便于分析与二次开发。; 适合人群:具备Python编程基础,熟悉NumPy、Matplotlib等科学计算与可视化库,对智能优化算法(如差分进化)和无人机路径规划有一定兴趣或研究需求的学生、研究人员及工程技术人员。; 使用场景及目标:①应用于低空物流、巡检监测、应急救援等实际无人机飞行任务的路径规划仿真;②作为差分进化算法在连续空间优化中应用的教学案例;③为后续集成地形数据、动态障碍物、飞行器动力学模型等高级功能提供可扩展的技术原型。; 阅读建议:建议结合文中提供的完整代码示例,动手运行并调试程序,观察不同参数(如种群大小、迭代次数、安全距离)对路径质量的影响,深入理解适应度设计与算法行为的关系,进而开展个性化改进与拓展实验。
A Survey of Variational Inference and Bayesian Computation Methods_变分推断与贝叶斯计算方法综述.md
ArxivReview学术论文研究综述,详细内容可访问:https://www.arxivreview.com/surveys
Safety Alignment and Adversarial Offense-Defense in Multimodal LLMs_多模态大语言模型安全对齐与对抗攻防综述.md
ArxivReview学术论文研究综述,详细内容可访问:https://www.arxivreview.com/surveys
代码+InceptionTime模型+血压估计
研究提出基于InceptionTime的端到端无袖带血压估计模型,利用多尺度一维卷积与残差连接有效提取PPG信号中的时序特征。在UCI数据集上,模型对收缩压和舒张压的预测MAE分别达8.26mmHg和4.49mmHg,表现出良好的非线性映射能力。尽管存在轻微过拟合及极端血压区间预测偏差,但整体性能稳定,为可穿戴设备连续血压监测提供了可行方案。
A Survey of Mixture-of-Experts Routing and Training Methods_混合专家路由与训练方法综述.md
ArxivReview学术论文研究综述,详细内容可访问:https://www.arxivreview.com/surveys


