LAB 3-1 Topic selection and requirement analysis of team project

LinQF39 2022-11-18 22:12:41

Task Deadline: 2021-12-03

  1. This team task is: team introduction, topic selection report, requirement analysis report
  2. The rating of this task includes: blog essay 30%+report document 30%+on-site defense 30%+video introduction 10%
  3. Time nodes you need to pay attention to:
    1. The deadline for forming a team is 22:00, 2022/11/19. Please complete The Online Form for forming a project team for this course before this time node
    2. The deadline for submission of the first materials is 23:00, 2022/12/02. Please submit report documents and defense PPT in the course group before this time node
    3. The offline on-site defense time is 08:20, 2022/12/03. In the morning, the on-site defense was held in Room S302/S304/N305, School of Electrical Engineering
    4. The deadline for submission of complete materials is 22:00, 2022/12/04. Please submit your blog assignment before this time node and upload the completed report document in the course group (please mark the modification)
  4. Notes for submission:
    1. The number of blog essay is 1 piece/person, which can be shared within the group, but each group member is required to submit, and the title of the blog is ID group - topic selection and requirement analysis report
    2. The number of report documents is 1 piece/group, which needs to be submitted to the course group. The format is named ID group - topic selection and requirement analysis report.pdf
    3. The number of defense PPT is 1 piece/group, which should be submitted to the course group in the format of ID group - topic selection and requirement analysis defense. ppt
    4. The ID is two Arabic numerals (to be given later), and the ID less than 10 contains a leading 0. For materials not submitted according to the naming requirements, 5 points will be deducted from each group

Part · 1 Blog essay (30%)

1.1 Blog Template

The first line gives the blog link of the team leader, and this line has no other content except the link.
1、 Team gathering (9 points)
1.1 Introduce each team member's style, skills, programming interests, expected software engineering roles, one sentence declaration, etc., with unlimited content (2 points)
1.2 Description of team characteristics: mainly describe the characteristics or core competitiveness different from all other teams (1 point)
1.3 Logo of the team: design a logo with the characteristics of the team and post it on the essay (1 point)
1.4 The first group photo of the team: with pictures and truth, the group photo style must be creative (5 points)
2、 Start action (5 points)
2.1 Summarize the content of the project your team will complete in one sentence, in both English and Chinese (2 points)
2.2 Read Chapter 5 Team and Process, Chapter 17 People, Performance and Professional Ethics of the Construction Law, and please explain how your team intends to determine individual contribution points. (2 points)
Students who are dissatisfied with the "individual contribution" rule and are difficult to discuss may consider "changing jobs" to other groups (find the receiving group and modify the team information on the online form)
Reference: FAQ of software engineering Q&A
The PDF electronic version of the Construction Law has been uploaded to the course group files
2.3 Please evaluate the contribution proportion of each member of the team to this assignment and fill in this question in a form. Please ensure that** Σ Contribution ratio of each person=total number of people × 100% * * (1 point)
It is forbidden to make the same score. If there is no evaluation, the team leader's score will be reduced by 50% after the average of the whole group
3、 Drip Record (16 points)
3.1 Draw the mind map and burnout map of the whole project (time range: from the first day of team creation to the submission time of this operation) (2+1 points)
3.2 Draw UML according to the part of the project (8 points)
Optional: use case diagram, class diagram, activity diagram, state diagram, entity relationship diagram
     If there is duplication between parts or the UML diagram in the mandatory diagram is not applicable to a certain functional module, select other applicable UML diagrams by yourself
UML diagram drawing reference link: UML Reference 1, UML Reference 2, UML Reference 3
Format example:


(x) Part XXXX

  • Person in charge: x classmate
  • Description:
  • Problems faced by this part:
  • Problems solved:
  • XX design is applied to solve XX problem. One sentence description.
  • Attachment: (All UML diagrams of this part)

3.3 Learning progress bar (added every week) (1 point)
 

Week NNew code (line)Cumulative code (line)Time spent on learning this week (hours)Cumulative time spent on learning (hours)Important growth
150050055Familiar with x language 1, 2, 3 features
2100015001217Mastered the use of xxx by practicing xxx
     

 

                
    Two reference tools are given here:

    3.4 Experience (4 points)

    • Selection of UML design tools, reasons for selection and evaluation of tools after use
    • Difficulties encountered in this task and solutions (e.g.: difficulty description/what attempts have been made/whether they have been solved/what gains have been made)

    4、 Video clip

    • Here is a line of Bilibili video links

    1.2 Blog requirements

    1. When writing a blog, please select [Switch to MarkDown] in the upper right corner of the editing area, use MarkDown language to write blog documents, and write a blog strictly according to the first-level and second-level titles in the blog writing format;
    2. Post a blog post after the assignment deadline: 20 points will be deducted from the original score if the assignment is submitted within 24 hours, 40 points will be deducted within 24-48 hours, 60 points will be deducted within 48-72 hours, and so on until 0 points is deducted;
    3. Posting blog posts but not submitting tasks/wrong submission links: 10 points will be deducted for supplementary submission within 24 hours, 20 points will be deducted within 24-48 hours, 30 points will be deducted within 48-72 hours, and so on until 0 points are deducted (please note: this assignment will not remind the QQ course group of the need to submit tasks);
    4. Missing submission: The above two points deduction rules are only applicable to the case of supplementary submission after the deadline of the assignment and before the start of the evaluation! The evaluation will be started at any time after the end of the assignment. The specific time of the evaluation will not be notified in advance. If the blog has not been published or the task has not been submitted at the beginning of the evaluation, it will be deemed as a lack of submission, and 0 points will be given;
    5. Plagiarism or cheating: 0 points for dishonesty detected by an automatic evaluation system or manually (including but not limited to job plagiarism).

     

    Part · 2 Report documents (30%)
    Scope and source of topic selection:

    • Small projects that are creative, interesting, and original enough
    • There are similar creative products in the market, but the projects can highlight certain differences and local advantages
    • Refer to the actual application projects of the company, but the selected topic must have a specific application value
    • Too simple team projects will be required to be reconceived

    2.1 Topic Selection and Requirement Analysis Report

    • Submit PDF version (twice), full score 20
    • The following contents should be included


    1) Project LOGO
    2) Background
    3) User portrait
    4) Requirement analysis (including "NABCD model")
    5) Competitive product analysis
    6) Mind mapping
    7) Class diagram
    8) Interface prototype
    9) Function description
    10) Acceptance verification criteria

     

    • Reporting requirements


    1) Refer to the Software Requirements Specification (national standard) and write the software requirements specification of the corresponding project;
    2) In addition to meeting the requirements of the normative text in the form, the overall content must be carried out around the essence of the project to ensure that the project to be developed is as clear, complete, and accurate as possible;
    3) It is described in a hierarchical form. With the deepening of the "layer", the details of the description will be more specific;
    4) Use consistent graphical symbols and text to describe the content;
    5) All abbreviations must be defined in advance;
    6) Format:

    • Directory required
    • The word typesetting style is standard and beautiful, with pictures and texts
    • There is a unified style throughout the document
    • Pay attention to font, line spacing, image centering, etc;

    7) Put yourself in the position of the reader - if the person who is unfamiliar with the software project can fully understand what the software should do by reading this document;
    8) Access the real users of the software project to ensure that the software truly reflects the needs of users and lays the foundation for the final availability of the software;
    9) For team collaboration and enhanced division of labor, it is necessary to describe the specific division of labor of each member and the proportion of workload in the whole document task;

    2.2 On-site defense presentation

    • Submit PPT presentation, full score 10
    • PPT shall be graded according to its beauty, its compatibility with the theme, and its ability to express to the audience in a concise and comprehensive manner


    Part · 3 On-site defense (30%)

    1. Form: PPT defense of each group on the platform
    2. Time: 18 minutes for each group, including 8 minutes for presentation, and 10 minutes for responding to questions and inquiries about topics and needs of each group (adjusted as the case may be).
    3. Scoring method:
    • (3.1) Oral defense performance
    • (3.1.1) The PPT logic is reasonable and the layout is beautiful (full score: 5 points)
    • (3.1.2) The defense process is smooth, and the content is reasonable and innovative (full score: 15 points)
    • (3.2) Questioning session: Failing to answer the questions of the evaluation group/other groups/teachers or preparing to ask questions of other groups (including the situation that the answer is considered unqualified, 2 points will be deducted for each question until none is left) (full score: 10 points)

        Additional score: In the defense phase, the group that has raised more valuable questions about the topics of other groups will be given a certain additional score (no more than 10 points).


    Part · 4 Video Introduction (10%)


    Please assume that the teacher, the evaluation group, and other students in the class are the investors. Please take a 1-2 minute video to introduce the team project, upload it to Bilibili, and give a video link at the end of the blog. Score according to the video content quality, with a score range of 5-10 points.

    ...全文
    2180 8 打赏 收藏 转发到动态 举报
    写回复
    用AI写文章
    0人已提交
    完成率0%
    暂无数据
    8 条回复
    切换为时间正序
    请发表友善的回复…
    发表回复
    Knightmare212 2023-01-12
    • 打赏
    • 举报
    回复
    「已注销」 2023-01-03
    • 打赏
    • 举报
    回复

    很不错的内容,干货满满,已支持师傅,期望师傅能输出更多干货,并强烈给师傅五星好评

    另外,如果可以的话,期待师傅能给正在参加年度博客之星评选的我一个五星好评,您的五星好评都是对我的支持与鼓励(帖子中有大额红包惊喜哟,不要忘记评了五星后领红包哟)
    ⭐ ⭐ ⭐ ⭐ ⭐ 博主信息⭐ ⭐ ⭐ ⭐ ⭐
    博主:橙留香Park
    本人原力等级:5
    链接直达:https://bbs.csdn.net/topics/611387568
    微信直达:Blue_Team_Park
    ⭐ ⭐ ⭐ ⭐ ⭐ 五星必回!!!⭐ ⭐ ⭐ ⭐ ⭐

    点赞五星好评回馈小福利:抽奖赠书 | 总价值200元,书由君自行挑选(从此页面参与抽奖的同学,只需五星好评后,参与抽奖)

    Liu_Jiewen 2022-12-05
    • 打赏
    • 举报
    回复
    非布司她482 2022-12-05
    • 打赏
    • 举报
    回复
    Haohao0183 2022-12-05
    • 打赏
    • 举报
    回复
    丽丽 2022-12-05
    • 打赏
    • 举报
    回复
    内容概要:本文研究了在通信资源受限与恶意攻击干扰下的孤岛微电网分布式二次控制策略,提出了一种兼具通信效率与攻击弹性的动态事件触发控制方案,旨在实现电压频率的精确恢复与有功无功功率的均衡共享。通过Simulink仿真与Matlab代码实现,系统验证了该策略在显著降低通信频次的同时,能够有效抵御拒绝服务(DoS)等网络攻击,保障微电网在复杂环境下的稳定运行。研究深入探讨了动态事件触发机制的设计、分布式控制算法的弹性优化,并确保系统具备排除芝诺行为的能力,从而全面提升微电网在极端条件下的鲁棒性、可靠性与运行效率。; 适合人群:具备电力系统、自动化或相关领域基础知识,从事微电网、分布式控制、能源系统安全方向研究的研究生、科研人员及工程技术人员。; 使用场景及目标:①应用于孤岛微电网在遭受通信限制和网络攻击时的二次电压与频率调节;②为高比例新能源接入场景下的微电网提供具备攻击容忍能力的弹性控制解决方案;③支持科研仿真验证与教学演示,推动分布式能源系统安全控制技术的发展。; 阅读建议:建议结合提供的Simulink模型与Matlab代码进行仿真实践,深入理解控制策略的实现细节,并可通过修改攻击模型、通信参数或网络拓扑进行拓展性研究,以全面掌握其弹性机制与优化潜力。
    上市公司绿色全要素生产率(Green Total Factor Productivity,简称GTFP)是衡量企业绿色发展和资源配置效率的重要指标,其不仅关注经济效益,还强调环境效益,体现了绿色发展理念。 一、上市公司绿色全要素生产率的介绍 上市公司绿色全要素生产率是衡量企业在实现绿色发展的过程中,如何有效地利用劳动、资本、能源等资源进行生产的综合效率。本分享数据涵盖2500+家上市公司,数据年份为2007-2022年,共46424条样本,含证券代码、年份、绿色全要素生产率、绿色技术效率变化指数、绿色技术进步变化指数。 二、数据指标 绿色全要素生产率 绿色技术效率变化指数 绿色技术进步变化指数 用于衡量企业绿色发展效率的综合指标 反映绿色技术使用效率的变化 衡量绿色技术进步的效果 三、测算方式 企业绿色全要素生产率的测算采用了非径向SBM-ML指数(简称“ML指数”)模型。该模型通过将企业的环境污染、绿色技术进步等因素纳入生产效率评价体系,全面反映了企业在绿色发展方面的整体表现。 具体的测算方式如下: (1)要素投入:以企业员工数作为劳动投入的代理变量,企业固定资产净额作为资本投入的代理变量,企业所在城市的工业用电量根据企业从业人员占城市城镇人员就业比重进行换算作为能源投入的代理变量。 (2)期望产出:以企业的营业收入作为期望产出的代理变量。 (3)非期望产出:将企业从业人员占所在城市城镇人员就业比重与“工业三废”(即工业二氧化硫、工业废水、工业烟粉尘排放量)结合,进行换算,作为非期望产出的代理变量。 四、参考文献 崔立志,孙旺,黄敏敏.新能源示范城市建设对企业绿色全要素生产率的影响研究——基于A股上市公司的实证分析[J].广西财经学院学报,2023,36(01):92-104. 五、数据来源 数据来源于《中国城市统计年鉴》、《中国环境统计年鉴》、

    285

    社区成员

    发帖
    与我相关
    我的任务
    社区描述
    福州大学 梅努斯国际工程学院 软件工程(2022秋) 教学
    软件工程 高校
    社区管理员
    • LinQF39
    加入社区
    • 近7日
    • 近30日
    • 至今
    社区公告
    暂无公告

    试试用AI创作助手写篇文章吧