Group 5 - CodeStrike Alpha Sprint Essay 3 - Day 5 - 6 (November 25 - 26, 2026)
CodeStrike Alpha Sprint Essay 3 — Stage 3: Community & Administration Integration (T5 & T6)
Basic Information
| Item | Information |
|---|---|
| Course | EE308FZ Software Engineering Class Community |
| Assignment Requirements | Fifth Assignment — Alpha Sprint |
| Assignment Goal | Record Alpha Sprint Day 5–6 progress (T5 Community & T6 Admin Web Integration), burn-up chart, running screenshots, GitHub check-ins, and verification results. |
| Other References | Code Standards & Sprint Plan, Assignment 4 Prototype Blog, SRS Repository |
| Team | CodeStrike (Group 5) |
| Project | Campus Competition & Activity Community (竞伴校园) |
| Sprint Period | November 21–28, 2026 |
| Reporting Period | Scheduled Stage 3 Window: Day 5–6 (November 25–26, 2026); completed and accepted ahead of schedule on November 24, 2026 |
| GitHub Repository | CodeStrike Repository |
| Integration Branch | sprint/alpha |
| Main Sprint Tasks | T5 — Community Posts & Interactions; T6 — Admin Web Integration |
| Task Status | Completed (Issues #5 and #6 Closed) |
Table of Contents
- Sprint Overview
- Development Progress
- Core Feature Implementation
- Latest Running Screenshots
- GitHub Task and Commit Evidence
- Sprint Burn-up Chart
- Testing and Quality Assurance
- Problems Encountered and Solutions
- Next Sprint Plan
- Sprint Reflection
1. Sprint Overview
The third stage of the CodeStrike Alpha Sprint delivered T5 — Community Posts & Interactions and T6 — Admin Web Integration, following the task plan published at the start of the sprint.
During the first two reporting periods (T1–T4), the team established the unified sprint/alpha baseline, shared HTTP transport infrastructure, MySQL-backed authentication and profiles, and the core competition-to-team admission workflow. However, competition community discussions remained static mock content on the student client, and the administration web console still operated only as a Phase 1 mock shell without real login, competition CRUD, or moderation capabilities.
Stage 3 closed both gaps in parallel across the full stack:
- T5 connected competition community posts, image upload and preview, comments and threaded replies, persistent Like/Favorite toggles, and student competition submissions in
apps/student-appto the real FastAPI backend and MySQL 8.4 database. - T6 migrated
apps/admin-webontoHttpTransportwith real administrator authentication, live/dashboardmetrics, full competition catalog management (/admin/competitionsand/competitions), and a unified moderation console covering Content (posts and comments), Competition submissions, and Team recruitments.
Although Stage 3 was originally scheduled for Day 5–6 (November 25–26, 2026), implementation, isolated MySQL 8.4 verification, live browser end-to-end testing, independent feature-branch splitting, Pull Request merges (#15 and #16), and GitHub Issue closures (#5 and #6) were all completed on November 24, 2026.
2. Development Progress
2.1 T5 — Community Posts, Interactions, and Submissions (feat/5-community)
Development began by defining shared community DTOs in packages/api-contracts/src/api/community.ts and extending the FastAPI content module with a personal interaction-state endpoint (GET /api/v1/posts/{post_id}/interactions) so reload persistence reflects each authenticated student's exact Like and Favorite status.
Key engineering work completed for T5:
- Added
CommunityFeed.vueandCommunityImage.vuecomponents and three new uni-app pages (pages/community/editor.vue,pages/community/post.vue,pages/community/submissions.vue), wired intopages.json,competition/detail.vue, andindex/index.vue. - Extended the student
uni.requestHTTP adapter to handle binaryarraybufferresponses for authenticated PNG/JPEG image retrieval (/images/{id}), converting validated bytes intodata:URLs for H5 andmp-weixinpreview. - Implemented author-private pending/rejected post visibility (
/me/posts) separated from publicly approved competition feeds (/competitions/{id}/posts). - Updated
scripts/verify-t2-openapi-contracts.mjsto assert the three new community DTO contracts (CommunityPostDto,CommunityCommentDto,PostInteractionsDto) and the new/api/v1/posts/{post_id}/interactionsendpoint. - Added backend and frontend unit/regression tests covering comment threads, interaction persistence, ownership enforcement, image validation, and competition submissions.
The principal T5 commit is fca017d on feat/5-community, merged into sprint/alpha via Pull Request #15 at 20:28:33 Beijing time on November 24, 2026 (c3d62a7), followed by closing Issue #5 at 20:33:07.
2.2 T6 — Administration Web Console & Moderation Queues (feat/6-admin-web)
T6 replaced the Phase 1 mock-only administration shell with a full live administration console backed by HttpTransport and real FastAPI endpoints, while preserving mock-mode compatibility when VITE_USE_MOCK=true.
Key engineering work completed for T6:
- Defined and exported shared administration DTOs in
packages/api-contracts/src/api/admin.tsandpackages/api-contracts/src/api/index.ts. - Upgraded backend moderation and dashboard queries (
dashboard.py,moderation/service.py,teams/router.py,teams/service.py) so pending counts exclude deleted, removed, and superseded revisions (including comments under removed posts) and recruitment queues support status filtering (Pending,Approved,Rejected,Superseded). - Implemented real admin login (
LoginView.vue), session restoration (/auth/me), non-admin token rejection and revocation, cross-tablocalStoragesession synchronization, and safe return-path routing (router/navigation.ts). - Built live dashboard metrics (
DashboardView.vue), paginated competition catalog CRUD (CompetitionsView.vue,CompetitionEditor.vue), and the unified moderation workspace (ModerationView.vue) with side-by-side Proposed revision vs. Currently effective comparison, authenticated image previews, revision history, andApprove/Reject/Removedecisions. - Completed
scripts/verify-t5-t6-browser.mjsand executed full live Chrome CDP verification across both the student H5 build and the admin web build against FastAPI and MySQL 8.4.7, capturing 20 functional screenshots.
After merging PR #15, feat/6-admin-web was rebased onto the updated sprint/alpha, resolving the single-line export merge in packages/api-contracts/src/api/index.ts, re-verified across all workspace checks, and merged via Pull Request #16 at 20:32:19 Beijing time on November 24, 2026 (91ae6a3). Issue #6 was closed at 20:33:18.
3. Core Feature Implementation
3.1 Community Feed, Post Authoring, and Protected Image Pipeline (T5)
The competition detail Discussion tab now renders CommunityFeed.vue in API mode, separating Your posts in review (/me/posts) from Published posts (/competitions/{id}/posts). Unapproved or rejected revisions remain private to their author and never leak into public feeds.
Students with complete profiles can author and edit posts with text, validated HTTP/HTTPS links (up to 20 links), and up to 9 JPEG/PNG images (at most 5 MiB each). Image payloads are validated for magic bytes and structural integrity on both client and server. On post edits, existing images are reloaded from the backend so unchanged attachments are preserved in the new pending revision, while the previously approved revision stays live publicly until moderation completes.
3.2 Comments, Threaded Replies, and Persistent Interactions (T5)
On any approved post (pages/community/post.vue), signed-in students can toggle Like and Favorite via PUT/DELETE /posts/{id}/interactions/{kind}. Initial toggle states are restored from GET /posts/{id}/interactions on page load and reload, while anonymous visitors see aggregate counts without issuing authenticated requests.
Students (including those with incomplete profiles, matching SRS rules) can submit top-level comments, reply to published comments (parentId), edit their own comments (creating a new pending revision), and delete their own posts or comments. Ownership checks are enforced on the server, returning 403 FORBIDDEN to non-authors.
3.3 Student Competition Submissions (T5)
The Submit competition action on the Competition Hub now opens pages/community/submissions.vue in API mode. Students can propose new competitions (POST /competition-submissions), revise pending/rejected proposals (PATCH /competition-submissions/{id}), and withdraw unapproved submissions (DELETE /competition-submissions/{id}). Submitted proposals stay private until an administrator approves them into the public competition catalog.
3.4 Administrator Authentication, Live Dashboard, and Competition Catalog (T6)
In API mode (VITE_USE_MOCK=false), all routes in apps/admin-web are protected by a navigation guard that verifies the stored Bearer token against /auth/me. If a student account attempts to log in to the admin console, the client immediately revokes the issued token via /auth/logout, never persists it, and displays an authorization error.
- Live Dashboard (
/): Fetches real counts fromGET /dashboard(Competitions,Pending applications,Active teams,Moderation queue) along with the published competition snapshot and direct links to catalog management and the moderation queue. - Competition Management (
/competitions): Supports server-side title search (GET /admin/competitions), cursor/offset pagination, creating draft or published competitions (POST /competitions), partial field updates (PATCH /competitions/{id}), deletion (DELETE /competitions/{id}), and a direct shortcut to review pending student competition submissions.
3.5 Unified Moderation Queues and Revision Comparison (T6)
ModerationView.vue provides a unified review workspace synchronized with URL query parameters (?queue=...&status=...):
- Three Queues: Content (posts and comments via
/moderation), Competition submissions (filtered from/moderationwith sparse-page cursor handling), and Recruitments (/moderation/recruitments). - Four Revision Statuses:
Pending,Approved,Rejected, andSuperseded, enabling administrators both to review new submissions and to inspect or remove already-approved content or recruitments. - Revision Detail Dialog: Fetches full detail (
GET /moderation/{id}orGET /moderation/recruitments/{id}), renders Proposed revision and Currently effective side by side when an approved version already exists, loads protected post attachments via authenticatedBlobrequests (GET /images/{id}) withURL.revokeObjectURLcleanup, and displays full revision history. - Policy-Bound Actions: Only permitted actions from
actionsFor()are exposed (Approve,Reject,Remove). Rejecting or removing content requires a non-empty reason; removing a recruitment targets the team (DELETE /moderation/recruitments/team/{teamId}) and immediately delists it.
3.6 Backend Consistency and Access Control Enforcement
- Removing a post now excludes both the post's pending follow-up revisions and any pending comments on that post from
GET /moderationandGET /dashboard'smoderationCount, preventing ghost items in the moderation counter (test_admin_queue.py). - All administrative endpoints strictly enforce
Adminrole verification (403for students,401after token revocation via/auth/logout).
4. Latest Running Screenshots
The following screenshots were captured during live end-to-end execution (scripts/verify-t5-t6-browser.mjs) against the production H5 student build (412×915 mobile viewport), the production Admin Web build (1440×1000 desktop viewport), FastAPI, and MySQL 8.4.7.
4.1 Admin Competition Publication and Live Dashboard Counts

Figure 1. Administrator Competition Catalog After Creating and Publishing a Competition
An authenticated administrator creates a new published competition in CompetitionsView.vue and confirms it via server-side title search.

Figure 2. Live Admin Dashboard Reflecting Real Competition and Moderation Queue Counts
After the competition is created and a student submits a post, /dashboard updates both the competition count and the pending moderation queue count directly from MySQL.
4.2 Student Post Authoring with PNG Upload and Pre-Approval Privacy

Figure 3. Student H5 Post Composer with Attached PNG Image Preview
An authenticated student writes a discussion post and attaches a local PNG file, verified and previewed before submission.

Figure 4. Public Discussion Feed Before Approval (Pending Content Isolated)
While the author sees their pending submission privately, an anonymous reader opening the same competition discussion sees an empty public feed until moderation approval succeeds.
4.3 Admin Image Moderation and Public Post Display

Figure 5. Admin Moderation Review Dialog Displaying Protected Image Preview and Revision History
The administrator inspects the pending post revision, previews the authenticated PNG attachment via GET /images/{id}, and approves the revision.

Figure 6. Approved Post and Uploaded Image Rendered on the Public Student H5 Client
After administrator approval, the post and its uploaded PNG image are publicly visible and decoded cleanly on reload.
4.4 Persistent Like/Favorite Interactions and Approved Comments

Figure 7. Like and Favorite States Persisted Across Full Page Reload
Toggling Like and Favorite persists in MySQL and restores active Unlike · 1 and Unfavorite · 1 states after reloading the page.

Figure 8. Approved Comment Displayed Under the Public Post Thread
Following comment submission and administrator approval, the comment renders in the public thread for anonymous and signed-in viewers.
4.5 Proposed vs. Effective Revision Comparison and Content Removal

Figure 9. Side-by-Side Proposed Revision vs. Currently Effective Version During Edit Review
When the author edits an already-approved post, the moderation dialog displays the proposed draft alongside the currently published version and complete revision history. Rejecting the edit preserves the original approved post and image publicly.

Figure 10. Removing an Approved Post from the Admin Moderation Queue
Filtering the Content queue by Approved allows an administrator to remove a published post with a mandatory reason, hiding it from the public feed and returning the dashboard pending count to baseline.
5. GitHub Task and Commit Evidence
T5 and T6 were split into two clean, independent feature branches following the sprint branching and commit conventions, verified separately and jointly, and merged sequentially into sprint/alpha through Pull Requests.
5.1 Stage 3 Delivery Records (T5 & T6)
| Item | T5 — Community Posts & Interactions | T6 — Admin Web Integration |
|---|---|---|
| Priority | P1 | P1 |
| Owner / Check-in Member | Zhaoyan Wang (王昭衍), Guanxin Lai (赖观新) | Zhaoyan Wang (王昭衍), Guanxin Lai (赖观新) |
| GitHub Issue | Issue #5 | Issue #6 |
| Development Branch | feat/5-community | feat/6-admin-web |
| Implementation Commit | fca017d | 61e9ae4 |
| Evidence Commit | Included in Stage 3 joint evidence | 143c885 |
| Pull Request | PR #15 | PR #16 |
Merge Commit (sprint/alpha) | c3d62a7 | 91ae6a3 |
| Merge Timestamp (Beijing) | November 24, 2026 20:28:33 | November 24, 2026 20:32:19 |
| Issue Status | Closed (20:33:07) | Closed (20:33:18) |
5.2 Cumulative Sprint Task Board Status (T1–T9)
| Task | Priority | Module | Issue / PR | Status |
|---|---|---|---|---|
| T1 | P0 | Baseline Merge | Issue #1 | Closed |
| T2 | P0 | Shared Types & HTTP Client | Issue #2 / PR #10 | Closed |
| T3 | P0 | Auth & Profile Integration | Issue #3 / PR #11 | Closed |
| T4 | P0 | Competitions & Teams Integration | Issue #4 / PR #12 | Closed |
| T5 | P1 | Community Posts & Interactions | Issue #5 / PR #15 | Closed |
| T6 | P1 | Admin Web Integration | Issue #6 / PR #16 | Closed |
| T7 | P1 | Notifications & Planner Integration | Issue #7 | Open |
| T8 | P0 | Testing & QA Automation | Issue #8 | Open |
| T9 | P1 | MP-Weixin Build Check & Docs | Issue #9 (PR #13 readiness merged) | Open |
6. Sprint Burn-up Chart

Figure 11. CodeStrike Alpha Sprint Burn-up Chart — Stage 3 (Through November 24, 2026)
The burn-up chart tracks cumulative formally accepted tasks (PR merged into sprint/alpha and GitHub Issue closed) against the nine-task baseline scope:
| Date | Total Scope | Accepted Tasks |
|---|---|---|
| November 21 | 9 | 0 |
| November 22 | 9 | 3 |
| November 23 | 9 | 3 |
| November 24 | 9 | 6 |
- November 22: T1, T2, and T3 accepted (3 / 9).
- November 24 (Morning): T4 accepted via PR #12 and Issue #4 closure (4 / 9, reported in Sprint Essay 2).
- November 24 (Evening): T5 and T6 accepted via PR #15, PR #16, and closures of Issues #5 and #6, bringing cumulative completion to 6 of 9 planned tasks (66.7% by task count).
The total sprint scope remains unchanged at 9 tasks. Future days (November 25–28) are intentionally left unplotted until actual task acceptances occur.
7. Testing and Quality Assurance
7.1 Automated Verification Results
All checks were executed against the integrated codebase and isolated MySQL 8.4.7 instance (127.0.0.1:33084) before and after branch separation and PR merges:
| Verification | Scope / Command | Observed Result |
|---|---|---|
| Workspace TypeScript type checking | pnpm type-check (contracts, student-app, admin-web) | PASS (0 errors) |
| Student unit and mock tests | pnpm --filter @codestrike/student-app test:mock | 86 passed, 0 failed, 0 skipped |
| Admin web unit tests | pnpm --filter @codestrike/admin-web test | 22 passed, 0 failed, 0 skipped |
| Backend pytest on MySQL 8.4.7 | pytest with TEST_MYSQL_URL | 68 passed, 0 failed, 0 skipped |
| Student live API E2E suite | pnpm --filter @codestrike/student-app test:e2e | 44 passed, 0 failed, 0 skipped |
| OpenAPI contract verification | node scripts/verify-t2-openapi-contracts.mjs | PASS (15/15 DTOs matched; 59 paths / 79 ops / 48 schemas) |
| Live T5 + T6 Chrome E2E journey | node scripts/verify-t5-t6-browser.mjs | PASS (20 screenshots captured) |
| Live T6 additional queues check | Competition submissions Approve + Recruitment Approve & Remove | PASS |
| Production builds (Mock + API modes) | H5, Admin Web, and MP-Weixin | PASS |
| MP-Weixin package audit | node scripts/verify-t9-weixin-build.mjs | PASS (20/20 pages complete; 382.4 KiB / 2048 KiB) |
7.2 Business Rule and Security Verification
| Test Scenario | Observed Result |
|---|---|
| Unapproved student post in public competition discussion | Hidden from public feed; visible only to author |
| Post creation with incomplete student profile | Blocked with PROFILE_INCOMPLETE |
| Commenting with incomplete student profile | Permitted (post-only profile gate preserved) |
| Like / Favorite toggle + full reload + toggle off + reload | Counts and active button states persist accurately in MySQL |
| Non-author editing or deleting another student's post/comment | Refused with 403 FORBIDDEN |
| Rejecting an edit revision on an already-published post | Author sees Rejected revision; public keeps original Approved post and PNG image |
| Student account attempting Admin Web login | Token immediately revoked via /auth/logout; never stored |
| Admin viewing protected post attachment before approval | Binary PNG fetched with Bearer token and rendered cleanly |
Content Reject or Remove without reason | Blocked with validation error requiring a reason |
| Removing an approved post with pending follow-up edit & pending comment | Post returns 404; pending moderation queue and /dashboard count drop to 0 |
Approving student competition submission in ModerationView | Competition immediately appears in public /competitions search |
Approving then removing team recruitment in ModerationView | Recruitment publishes on approval and disappears from public list on removal |
7.3 Regression and Verification Boundaries
- Independent branch verification: Both
feat/5-community(student 86/86, admin 8/8, backend community tests 8/8) andfeat/6-admin-web(student 78/78, admin 22/22, backend admin/team tests 23/23) passedpnpm type-check,pnpm test, and backendpytestindependently prior to merging. - Known verification boundaries:
scripts/verify-t9-weixin-compatibility.mjscontinues to flagPATCHrequests (including post and comment editing) as outside WeChat Mini Program's documentedwx.requestmethod list; runtime behavior on WeChat Developer Tools and physical devices remains to be verified manually under T9.- Personal Planner API integration and recipient Notifications (UI-20) are outside T5/T6 scope and remain in T7.
- Consolidated QA regression checklists and the formal Testing Essay remain in T8.
Detailed logs and screenshots are retained in the Stage 3 Evidence Directory.
8. Problems Encountered and Solutions
8.1 Restoring Per-User Interaction State Across Reloads
Problem: The initial backend content endpoints exposed aggregate likes and favorites counts on PostOut and PUT/DELETE toggle routes, but did not provide a read endpoint returning whether the current authenticated student had already liked or favorited a post. Reloading a post detail page could therefore lose active button states.
Solution: Added GET /api/v1/posts/{post_id}/interactions returning the typed InteractionState schema ({ liked, favorited }), aligned it with PostInteractionsDto in packages/api-contracts/src/api/community.ts, updated scripts/verify-t2-openapi-contracts.mjs to assert the new route/schema explicitly, and verified reload persistence in both unit tests and live Chrome E2E.
8.2 Stale Pending Moderation Counts After Content Removal
Problem: Previously, /dashboard counted raw Pending revision rows across tables without filtering out deleted or removed parent entities. Removing a post that still had a pending edit revision or a pending comment left phantom items in moderationCount.
Solution: Centralized actionable-revision filtering into revision_query() and pending_count() in apps/server/app/modules/moderation/service.py so deleted objects, removed posts/comments, superseded revisions, and comments under removed posts are excluded consistently from both GET /moderation and GET /dashboard. Added apps/server/tests/test_admin_queue.py to lock in this invariant.
8.3 Missing Admin Contract Exports and Incomplete Moderation View
Problem: During mid-stage integration, apps/admin-web failed vue-tsc -b because packages/api-contracts/src/api/admin.ts was not re-exported from packages/api-contracts/src/api/index.ts, apps/admin-web/src/router/index.ts referenced a not-yet-created ModerationView.vue, and newly added admin views referenced layout utility classes absent from apps/admin-web/src/style.css.
Solution: Re-exported admin.ts from the shared contract barrel, implemented ModerationView.vue with all three queues, URL-synced filters, Proposed vs. Effective comparison, authenticated image previews with URL.revokeObjectURL lifecycle cleanup, and completed apps/admin-web/src/style.css.
8.4 Clean Feature Branch Separation and Shared Export Merge
Problem: Joint T5 and T6 development initially accumulated in a single working tree on feat/5-community. Committing them together would violate the sprint's per-issue branch and PR traceability rules.
Solution: Separated the working tree cleanly into two independent branches rooted on sprint/alpha (feat/5-community for #5 and feat/6-admin-web for #6), independently ran type-checking and tests on each branch, merged PR #15 first, rebased feat/6-admin-web onto sprint/alpha to resolve the single-line export conflict in packages/api-contracts/src/api/index.ts, re-verified the combined tree, and merged PR #16.
8.5 Dialog Fade Timing During Automated Screenshot Capture
Problem: In early live runs of scripts/verify-t5-t6-browser.mjs, Element Plus's el-dialog opening transition caused screenshots to be captured before overlay opacity reached 1, leaving faint underlying table elements visible through the dialog header.
Solution: Completed moderate() in scripts/verify-t5-t6-browser.mjs to wait for .el-overlay and .el-dialog computed opacity to reach 1 as well as full image decoding before capturing evidence screenshots.
9. Next Sprint Plan
With T1–T6 merged and closed, three tasks remain to finish the Alpha Sprint before November 29:
| Task | Priority | Planned Work |
|---|---|---|
| T7 — Notifications & Planner Integration | P1 | Connect recipient notifications (/notifications, UI-20) and personal planner CRUD/views (/planner/items, /planner/day, /planner/week) in the H5 student client against MySQL |
| T8 — Testing & QA Automation | P0 | Expand full-stack automated regression and MySQL 8.4 integrity/concurrency coverage, execute manual regression checklist, resolve any P0/P1 defects, and publish the Testing Essay |
| T9 — MP-Weixin Build Check & Docs | P1 | Complete WeChat Developer Tools verification, maintain sprint burn-up records, and publish the remaining Sprint Essays, Summary Essay, and Topical Collection Essay |
10. Sprint Reflection
Stage 3 completed the transition of CodeStrike from a student-only workflow into a two-sided platform with moderated community interaction and a real administrative control plane.
Connecting T5 and T6 together highlighted why contract-first development and real browser-to-database testing matter: subtle integration issues—such as per-user interaction restoration after reload, ghost pending counts after post removal, protected binary image previews, and versioned edit isolation—only surface reliably when student and administrator sessions exercise the real FastAPI and MySQL stack concurrently.
Maintaining strict branch hygiene (feat/5-community → PR #15, feat/6-admin-web → PR #16) while verifying both branches independently and jointly keeps sprint/alpha clean and traceable as the team enters the final stretch (T7–T9).
Related Links
相关推荐
基于条件风险价值CVaR的微网动态定价与调度策略(Matlab代码实现)
基于条件风险价值CVaR的微网动态定价与调度策略(Matlab代码实现)内容概要:本文提出了一种基于条件风险价值(CVaR)的微网动态定价与调度策略,并通过Matlab代码实现相关算法。研究聚焦于在不确定环境下,如可再生能源出力波动和负荷需求变化的情况下,如何利用CVaR方法量化和控制风险,从而优化微网的经济运行与能源调度。文中建立了包含分布式电源、储能系统及可控负荷在内的微网模型,设计了考虑风险偏好的动态定价机制与优化调度方案,旨在平衡系统运行成本与风险水平。通过仿真验证了该策略在降低期望成本的同时有效控制极端损失的能力。; 适合人群:具备电力系统、优化理论及Matlab编程基础的研究生、科研人员及相关领域工程师。; 使用场景及目标:①应用于含高比例可再生能源的微网能量管理系统中,提升其应对不确定性的能力;②为电力市场环境下的风险量化与决策提供技术支持;③作为教学案例用于讲授风险敏感优化在能源系统中的应用。; 阅读建议:建议读者结合Matlab代码深入理解模型构建与求解过程,重点关注CVaR的建模方式及其在目标函数中的集成方法,同时可尝试调整风险偏好参数以观察对调度结果的影响。
code_20261127.txt
code_20261127.txt
西周BC778年世界历史地图矢量文件SHP格式.zip
本资源为《西周BC778年世界历史地图矢量文件SHP格式》压缩包,文件大小约 24.87 MB,便于集中下载、整理和使用。具体内容请结合压缩包内的实际文件与说明查看。 在当前可读取的目录中,可见属性表(.dbf)、投影说明文件(.prj)、Shapefile 主文件(.shp)、Shapefile 索引(.shx)。建议解压后保持原有目录结构,先浏览文件清单与说明,再选择需要的资料进行加载或整理。 应用方面,可根据实际资料用于学习练习、资料检索、研究整理或项目参考。使用时可先确定所需内容,建立清晰的文件分类,再按项目要求进行筛选、转换与汇总。 使用 Shapefile 数据时,请把实际配套的 .shp、.shx、.dbf 等文件保存在同一目录,并保持同名关联;加载后再检查坐标系与中文字段显示。如需叠加其它数据,请先统一坐标与字段口径。 数据来源、时间范围、坐标系、字段定义、精度和使用条件,请以实际文件及原始说明为准。本介绍不对文件名之外尚未核实的信息作额外承诺。
复现多水面航行器AUV协同路径跟踪、多智能体系统、事件触发通信Matlab仿真
内容概要:本文围绕多水面航行器AUV的协同路径跟踪问题,基于多智能体系统理论,采用事件触发通信机制,利用Matlab进行仿真复现。研究重点在于设计高效的协同控制算法,以实现多个AUV在复杂海洋环境下的精确路径跟踪与协同作业,同时通过事件触发机制降低通信频率,节约能源并提升系统效率。仿真内容涵盖了系统建模、控制策略设计、通信机制优化及多AUV协同行为的动态响应分析,验证了所提方法的有效性与鲁棒性。; 适合人群:具备自动化、控制工程、海洋工程或相关领域背景,熟悉Matlab/Simulink仿真工具,从事多智能体系统、无人系统协同控制研究的研发人员或研究生。; 使用场景及目标:① 掌握多AUV协同路径跟踪的控制算法设计方法;② 学习事件触发通信机制在多智能体系统中的应用;③ 通过Matlab仿真复现顶刊研究成果,提升科研实践能力。; 阅读建议:建议结合多智能体系统控制理论与Matlab编程实践,重点关注仿真模型的构建逻辑与控制参数的整定过程,动手复现代码以深入理解算法细节与系统动态特性。
【工业无线通信】5GHz WiFi6大功率AP基站:支持2400M速率与AI极速漫游的工业级无线传输设备
内容概要:WiFiSupply WFS7000XBAX 是一款工业级大功率机载无线AP基站,支持5GHz全频段(5180-5825MHz)和Wi-Fi 6(802.11ax)标准,提供高达2400Mbps的无线速率和28dBm(640mW)发射功率。产品具备≤1ms通信延迟、≤30ms AI FastRoaming极速漫游、IP54防护等级及-45~85℃宽温工作能力,支持OFDMA、TDMA、长距离优化协议(LD),适用于远距离桥接(最远可达150km)和移动场景下的稳定通信。设备采用MIMO 2T2R架构,配备SMA外置天线接口,支持多种供电方式(PoE/DC/端子),并集成多重看门狗、防浪涌、防静电等工业级设计,保障高可靠性运行。软件方面支持私有安全协议、巨量安全隧道、VLAN、QoS、IPv6、SNMP、API管理及WISE云平台远程运维。; 适合人群:工业自动化、智慧物流、智慧交通等领域中从事无线网络规划、设备集成与系统部署的技术工程师及项目决策人员。; 使用场景及目标:①用于AMR/AGV/RGV、四向穿梭车、堆垛机、无人叉车等移动设备的无线联网与PLC数据传输;②实现车载、船载、火车视频监控的移动回传;③构建室内外无线桥接骨干链路,支持风电监测、无人机遥控、分拣机控制等工业4.0应用;④在复杂电磁环境下提供抗干扰、低延时、高带宽的稳定网络覆盖。; 阅读建议:本规格书适用于产品选型、方案设计与现场部署参考,建议结合实际应用场景重点关注其抗干扰能力、漫游性能、安全机制与供电灵活性,并查阅官方认证报告以验证各项工业指标的真实性。


