176
社区成员




Which course does this assignment belong to | https://bbs.csdn.net/forums/ssynkqtd-04 |
---|---|
Where are the requirements for this assignment | https://bbs.csdn.net/topics/617606376 |
The goal of this assignment | Test this project |
Team Name | Wizards of codes |
Team Project | Campus course management and check-in system |
目录
Ⅰ. Arrangement of project testing work
Ⅱ. Selection and application of testing tools
Testing plays a pivotal role in ensuring quality, safety, and performance within the software development life cycle. We've gained insights into implementing concurrent testing initiatives throughout sprints, choosing and employing suitable testing tools, and progressively introducing automated testing methodologies.
For the project, our testing was structured through these steps:
1. Project Requirements Analysis: Understanding the project requirements thoroughly, encompassing functional, performance, and security aspects. This step established the purpose and objectives for subsequent testing phases.
2. Test Plan Development: Crafting a comprehensive test plan aligned with the project's needs and objectives.
3. Tool Selection and Environment Setup: Choosing suitable testing tools as per the project's requirements and preparing the necessary test environment and simulation data.
4. Test Case Design: Creating test cases that cover both functional and non-functional requirements. Considering various scenarios and boundary conditions was integral to this phase.
5. Test Execution: Implementing the test plan and test cases while meticulously documenting test results and encountered issues. Providing timely feedback to the development team for resolution was a key focus.
6. Result Analysis and Reporting: Analyzing test outcomes, identifying potential problems and defects, and offering recommendations for enhancements. A comprehensive test report was compiled at this stage.
7. Continuous Improvement: Post-testing, reviewing and analyzing the testing process and results to identify shortcomings. Continuously refining testing processes and methodologies based on these insights was an ongoing objective.
Test content | Test Tools |
---|---|
Test back-end interfaces | postman |
Testing front-end page display and interaction | HBuider X Built-in Browser/Edge/Chrome |
Record test results and write test documentation | Microsoft Word |
https://docs.qq.com/doc/DWHd2TldEYVZuYnBZ
Throughout the project implementation, we've gathered valuable testing insights:
1. Commencing testing early in the project lifecycle helps detect and address potential issues upfront, preventing extensive revisions later.
2. Implementing a test plan that emphasizes testing feature increments swiftly, even at 2% project completion, rather than waiting for full project completion.
3. Ensuring thorough testing across all functions and scenarios to guarantee system stability and reliability.
4. Maintaining distinct development and testing teams aids in uncovering software defects effectively.
5. Designing software with error-proofing capabilities to diagnose certain errors. Including automated and regression testing in the software design.
6. Designing test cases that cover input data and expected output, incorporating both legal and illegal input scenarios.
7. Leveraging formal technical reviews as a preemptive measure to identify errors, reducing the extent of testing required for high-quality software (before initiating testing).
8. Conducting formal technical reviews to spot inconsistencies, omissions, or significant errors in test methodology, saving time and enhancing product quality.
The goal of this test is to confirm whether the function of the small program can properly complete all the operations required by the design, and whether there are problems such as logic errors and code defects. Project testing helps to improve the quality and reliability of the applet and reduce potential risks in development and use. We also found some problems and loopholes during this test, but due to the time problem, there are still some remaining too late to modify, we decided to improve the next phase.