Group 5 - CodeStrike Alpha Sprint Essay 4 - Day 7 - 8 (November 27 - 28, 2026)
CodeStrike Alpha Sprint Essay 4 — Stage 4: Notifications, Personal Planner, QA Automation & Release Wrap-up (T7, T8 & T9)
Basic Information
| Item | Information |
|---|---|
| Course | EE308FZ Software Engineering |
| Assignment | Assignment 5 — Alpha Sprint |
| Team | CodeStrike (Group 5) |
| Project | Campus Competition & Activity Community (竞伴校园) |
| Sprint Period | November 21–28, 2026 |
| Reporting Period | Day 7–8 (November 27–28, 2026) |
| GitHub Repository | CodeStrike Repository |
| Integration Branch | sprint/alpha |
| Main Sprint Tasks | T7 — Notifications & Planner Integration; T8 — Testing & QA Automation; T9 — MP-Weixin Build Check & Docs |
| Task Status | T7 & T8 Completed and Merged into sprint/alpha (Issues #7 & #8 Closed); T9 Build-Verified, Final Blogs in Progress |
Table of Contents
- Sprint Overview
- Development Progress
- Core Feature Implementation
- Latest Running Screenshots
- GitHub Task and Commit Evidence
- Sprint Burn-up Chart
- Testing and Quality Assurance
- Problems Encountered and Solutions
- Final Wrap-up Plan
- Sprint Reflection
1. Sprint Overview
The fourth and final development stage of the CodeStrike Alpha Sprint focused on completing the remaining student-facing features (T7 — Notifications & Planner Integration), executing full-stack quality assurance and MySQL 8.4 concurrency/load verification (T8 — Testing & QA Automation), and verifying WeChat Mini Program package readiness alongside sprint documentation wrap-up (T9 — MP-Weixin Build Check & Docs).
By the end of Stage 3 (T1–T6), CodeStrike had delivered MySQL-backed authentication and profiles, competition discovery, team recruitment and captain admission, moderated community discussions with protected image uploads, and the live administrator web console. However, two student-side product capabilities still operated only in mock mode or lacked UI integration, and the integrated T1–T7 system had not yet undergone a consolidated full-stack QA sweep:
- T7 connected recipient notifications (
/notifications, UI-20) and the personal planner (/planner/items,/planner/day,/planner/week, UI-16 through UI-19) inapps/student-appto the real FastAPI and MySQL 8.4 backend while preserving 100% Mock-mode compatibility. - T8 expanded automated MySQL 8.4 concurrency and constraint tests (
test_t8_mysql_qa.py) and live API end-to-end suites for T5 and T6 (community-e2e.test.mjs,admin-e2e.test.mjs), executed all 17 verification suites across the integrated codebase (240/240 automated tests passed, 0 failed, 0 skipped, 0 open P0/P1 defects), and authored the formal Testing Essay. - T9 verified that the updated 21-page WeChat Mini Program production bundle (
mp-weixin) compiles cleanly within the 2 MB package budget (408.2 KiB / 2048 KiB) and documented all platform compatibility boundaries honestly ahead of final sprint submission on November 29.
2. Development Progress
2.1 T7 — Notifications & Personal Planner Integration (feat/7-notifications-planner)
Development began by extending shared contracts in packages/api-contracts and verifying exact schema alignment against the live FastAPI OpenAPI 3.1.0 specification (scripts/verify-t2-openapi-contracts.mjs, expanded from 15 to 19 verified DTOs).
Key engineering work completed for T7:
- Added
packages/api-contracts/src/api/notifications.tsand exported it viapackages/api-contracts/src/api/index.ts; added Planner request/response DTOs (PlannerItemPageDto,PlannerCreateResultDto,PlannerSkippedOccurrenceDto,PlannerCourseCreateRequest,PlannerTimedPlanCreateRequest,PlannerTodoCreateRequest,PlannerItemPatchRequest) inpackages/api-contracts/src/api/dto.tsand extendedtoPlannerOccurrenceinpackages/api-contracts/src/adapters/index.ts. - Implemented
apps/student-app/src/api/notifications.tsandapps/student-app/src/api/planner.ts, wired intoapps/student-app/src/api/client.ts. - Built the new recipient notification inbox screen
apps/student-app/src/pages/notifications/index.vue(UI-20), registered it inapps/student-app/src/pages.json, wired the header bell entry inCsHeader.vue(API mode routes to/pages/notifications/index; Mock mode remains unchanged), and added aNotificationsshortcut onpages/profile/index.vue. - Upgraded all four planner screens (
pages/planner/index.vue,pages/planner/course.vue,pages/planner/item.vue,pages/planner/occurrence.vue) to operate against real FastAPI endpoints in API mode while keeping Mock-mode behavior completely intact. - Added unit tests (
apps/student-app/tests/notifications-planner.test.mjs), live Node API E2E tests (apps/student-app/tests/e2e/notifications-planner-e2e.test.mjs), and a live 390 px mobile Chrome CDP verification script (scripts/verify-t7-h5-browser.mjs), capturing 8 verified mobile screenshots underdocs/evidence/assignment5-alpha/t7-notifications-planner/screenshots/.
Principal T7 commits on feat/7-notifications-planner: 2b37a26 (21 files changed, +2,486 / -115 lines) and e594852 (T7 screenshot evidence), merged into sprint/alpha via Pull Request #17 (220dbdb) on November 28, 2026, followed by closing Issue #7.
2.2 T8 — Testing & QA Automation (feat/8-testing-qa)
To verify the fully integrated T1–T7 system as a whole, T8 branched from feat/7-notifications-planner and closed remaining concurrency and API E2E gaps:
- Added
apps/server/tests/test_t8_mysql_qa.py(7 real MySQL 8.4READ-COMMITTEDconcurrency, deadlock-free lock-ordering, composite-PK idempotency, course-edit collision rollback, notification privacy, andInnoDB/utf8mb4/CHECKconstraint tests). - Added
apps/student-app/tests/e2e/community-e2e.test.mjs(T5 live API E2E) andapps/admin-web/tests/e2e/admin-e2e.test.mjswithtest:e2escript inapps/admin-web/package.json(T6 live API E2E). - Executed the full 17-suite verification matrix against real MySQL 8.4.7, FastAPI, production API builds, and Mock/prototype builds, archiving verbatim logs in
docs/evidence/assignment5-alpha/t8-testing-qa/logs/. - Produced the T8 QA metrics & latency benchmark chart (
t8-qa-metrics-chart.png), manual regression checklist (README.md), and publication-ready Testing Essay (CodeStrike_Alpha_Sprint_Testing_Essay.md).
Principal T8 commits on feat/8-testing-qa: 5677821 (4 files changed, +990 lines) and d0a7821 (T8 logs, chart, manifest, and Testing Essay), merged into sprint/alpha via Pull Request #18 (6775f25) on November 28, 2026, followed by closing Issue #8.
2.3 T9 — MP-Weixin Build Check & Documentation Wrap-up
Following T7's addition of pages/notifications/index.vue (bringing the student client to 21 pages), the team re-ran full workspace builds (pnpm build), scripts/verify-t9-weixin-build.mjs, and scripts/verify-t9-weixin-compatibility.mjs:
mp-weixincompiles cleanly withappid=wxa551256ce5fab6a7,projectname="CodeStrike",urlCheck=true, 21 / 21 pages complete (.js,.json,.wxml,.wxss), and a main package size of 408.2 KiB / 2048 KiB (19.9% of the 2 MB limit).- Static HTTP compatibility audit honestly logs the 6 explicit
PATCHcall sites across student API modules as outside WeChat's documentedwx.requestmethod union for manual WeChat Developer Tools verification.
3. Core Feature Implementation
3.1 Recipient Notifications Inbox (UI-20) and Event Routing (T7)
In API mode, tapping the header notification bell or the Notifications entry on the Profile screen opens pages/notifications/index.vue:
- Fetches recipient-scoped notifications from
GET /api/v1/notificationswith liveunreadCountbadge display. - Classifies real backend events into Admission (
NewApplication,ApplicationApproved,ApplicationRejected,ApplicationInvalidated), Team (MemberJoined,MemberRemoved,CaptainTransferred,TeamDissolved), and Moderation (ModerationApprove,ModerationReject,ModerationRemove,ModerationApproved,ModerationRejected,RecruitmentRemoved). - Supports All / Unread filtering, per-item Mark as read / Mark unread via
PATCH /api/v1/notifications/{id}persisted in MySQL across full reloads, and safe target navigation to related application, team, post, or submission screens. - Enforces strict recipient isolation on the backend: attempting to read or mutate another student's notification returns
404 NOT_FOUND.
3.2 Personal Planner Day/Week Views and Single-Occurrence CRUD (T7)
All four planner screens now persist directly to MySQL 8.4 in API mode while obeying every SRS invariant:
- Incomplete-Profile Access (FR-02): Signed-in students whose profiles are still incomplete can freely create, view, edit, complete, and delete private planner items, while unauthenticated visitors are prompted to sign in and other students cannot access private items (
404). - Integrated Day and Week Views (
pages/planner/index.vue): PaginatesGET /api/v1/planner/dayandGET /api/v1/planner/week, displaying Courses, Timed Plans, and To-dos in a unified timeline with single-tap To-do completion (PATCH /api/v1/planner/items/{id}). - Finite Weekly Course Entry (
pages/planner/course.vue): SubmitsCourseCreatepayloads mapped to the server's configuredSEMESTER_START_DATEandPERIOD_TIMEStimetable, reporting exactcreatedCountandskippedDuplicateCountfeedback when duplicate occurrences are skipped. - Timed Plans and To-dos (
pages/planner/item.vue): Allows overlapping Timed Plans on the same date, supports optional deadlines for To-dos, and strictly aligns payloads with backend Pydantic schemas (omittingdescriptiononTimedPlanCreate). - Single-Occurrence Scope (
pages/planner/occurrence.vue): Edits (PATCH) and deletions (DELETE) apply exclusively to the selected occurrence ID, leaving sibling weekly occurrences untouched and rolling back cleanly on course slot conflicts (409 PLANNER_DUPLICATE_COURSE).
3.3 Full-Stack Concurrency, Load, and Regression Assurance (T8)
T8 validated the integrated platform across all layers—type-checking, 19 OpenAPI DTO contracts, 114 frontend unit/mock tests, 75 MySQL 8.4.7 backend tests (including 13 real InnoDB concurrency/constraint tests and the 20-user / 80-operation mixed load benchmark), 51 live student & admin API E2E tests, 4 live browser E2E journeys, and 4 Mock/prototype responsive regressions. Detailed technical analysis is documented in the companion Testing Essay.
4. Latest Running Screenshots
The following screenshots were captured during live end-to-end execution (scripts/verify-t7-h5-browser.mjs) against the production H5 student build at a 390 px mobile viewport, connected to FastAPI and MySQL 8.4.7, followed by the T8 QA metrics chart.
4.1 Recipient Notifications Inbox and Read-State Persistence (UI-20)

Figure 1. Recipient Notification Inbox (UI-20) Displaying Real Admission and Moderation Events (390 px)
After captain approval and administrator post moderation, the student opens the notification inbox via the header bell and sees real unread events (ApplicationApproved, MemberJoined, ModerationApprove) with a live 3 unread badge.

Figure 2. Unread Filter View After Marking a Notification Read and Reloading the Page (390 px)
Marking the post approval notification as read updates the badge to 2 unread, survives a full browser reload from MySQL, and excludes the read item when switching to the Unread filter.
4.2 Personal Planner Day/Week Views, Persistence, and Occurrence Editing (UI-16 to UI-19)

Figure 3. Personal Planner Day View (UI-16) After Creating a Timed Plan and a To-do (390 px)
Both the newly created Timed Plan (Architecture review) and To-do (Finish T7 integration) render in the integrated Day timeline immediately after saving to FastAPI.

Figure 4. Persisted To-do Completion State After Full Page Reload (390 px)
Toggling the To-do completion checkbox persists via PATCH /api/v1/planner/items/{id} and remains marked completed after reloading the H5 client.

Figure 5. Personal Planner Week View Sharing the Same MySQL Occurrence State (390 px)
Switching from Day to Week mode queries GET /api/v1/planner/week and displays the same persisted occurrences across the Monday–Sunday calendar week.


Figure 6. Single-Occurrence Edit Screen (UI-19) and Updated Planner View After Deleting One Instance (390 px)
Opening an occurrence allows updating or deleting only that individual instance while preserving any sibling weekly items.

Figure 7. Finite Weekly Course Creation (UI-17) Mapped to Server Timetable Periods (390 px)
Submitting a multi-week course resolves week/weekday/period selections via the backend timetable configuration and reports exact created and skipped duplicate counts.
4.3 Consolidated QA Automation & MySQL 8.4.7 Benchmark Summary (T8)

Figure 8. Automated QA Verification Breakdown (240 / 240 Passed) and MySQL 8.4.7 20-User Mixed Load Latency
5. GitHub Task and Commit Evidence
T7 and T8 were developed on dedicated issue branches (feat/7-notifications-planner and feat/8-testing-qa), verified independently and jointly, and merged sequentially into sprint/alpha via Pull Requests.
5.1 Stage 4 Delivery Records (T7, T8 & T9)
| Item | T7 — Notifications & Planner | T8 — Testing & QA Automation | T9 — MP-Weixin & Docs |
|---|---|---|---|
| Priority | P1 | P0 | P1 |
| GitHub Issue | Issue #7 | Issue #8 | Issue #9 |
| Development Branch | feat/7-notifications-planner | feat/8-testing-qa | feat/9-weixin-readiness (PR #13 merged) + final wrap-up |
| Implementation Commit | 2b37a26 | 5677821 | 9f8346d (readiness config & audits) |
| Evidence Commit | e594852 | d0a7821 | e7721d0 / b527915 + T8 re-audit logs/12–13 |
| Pull Request | PR #17 | PR #18 | PR #13 merged (ec37402) |
Merge Commit (sprint/alpha) | 220dbdb (Nov 28, 12:05:37) | 6775f25 (Nov 28, 12:06:44) | Issue #9 closes after all 8 blogs publish |
| Issue Status | Closed (Nov 28, 12:06:20) | Closed (Nov 28, 12:07:02) | Open (final blogs in progress) |
5.2 Cumulative Sprint Task Board Status (T1–T9)
| Task | Priority | Module | Issue / PR | Status (as of Nov 28) |
|---|---|---|---|---|
| T1 | P0 | Baseline Merge | Issue #1 | Closed |
| T2 | P0 | Shared Types & HTTP Client | Issue #2 / PR #10 | Closed |
| T3 | P0 | Auth & Profile Integration | Issue #3 / PR #11 | Closed |
| T4 | P0 | Competitions & Teams Integration | Issue #4 / PR #12 | Closed |
| T5 | P1 | Community Posts & Interactions | Issue #5 / PR #15 | Closed |
| T6 | P1 | Admin Web Integration | Issue #6 / PR #16 | Closed |
| T7 | P1 | Notifications & Planner Integration | Issue #7 / PR #17 | Closed |
| T8 | P0 | Testing & QA Automation | Issue #8 / PR #18 | Closed |
| T9 | P1 | MP-Weixin Build Check & Docs | Issue #9 (PR #13 merged) | Open (final blogs in progress) |
6. Sprint Burn-up Chart

Figure 9. CodeStrike Alpha Sprint Burn-up Chart — Through November 28, 2026 (8 of 9 Accepted)
Following our sprint evidence rule, only tasks formally merged into sprint/alpha with closed GitHub Issues are counted as accepted on each date:
| Date | Total Scope | Accepted Tasks (GitHub Closed) |
|---|---|---|
| November 21 | 9 | 0 |
| November 22 | 9 | 3 |
| November 23 | 9 | 3 |
| November 24 | 9 | 6 |
| November 25 | 9 | 6 |
| November 26 | 9 | 6 |
| November 27 | 9 | 6 |
| November 28 | 9 | 8 |
- November 28: T7 (PR #17, Issue #7 closed) and T8 (PR #18, Issue #8 closed) were accepted into
sprint/alpha, bringing cumulative completion to 8 of 9 planned tasks (88.9% by task count). Only T9 (final blog wrap-up) remains open ahead of the November 29 deadline.
7. Testing and Quality Assurance
All verification checks below were executed on the integrated T1–T7 codebase against real MySQL 8.4.7 (127.0.0.1:33084, READ-COMMITTED):
| Verification Suite | Scope / Command | Observed Result |
|---|---|---|
| Workspace TypeScript type check | pnpm type-check (contracts, student-app, admin-web) | PASS (0 errors) |
| Student unit & mock tests | pnpm --filter @codestrike/student-app test:mock | 92 / 92 passed, 0 failed, 0 skipped |
| Admin web unit tests | pnpm --filter @codestrike/admin-web test | 22 / 22 passed, 0 failed, 0 skipped |
| Backend pytest on MySQL 8.4.7 | TEST_MYSQL_URL=... pytest -v -rs -rP | 75 / 75 passed, 0 failed, 0 skipped |
| MySQL 8.4 20-user mixed load | test_load.py (20 users, 80 ops) | 0 failed, P95 0.7473 s, Max 0.7824 s (target <= 3.00 s) |
| OpenAPI 3.1.0 DTO contracts | node scripts/verify-t2-openapi-contracts.mjs | PASS (19 / 19 DTOs; 59 paths / 79 ops / 48 schemas) |
| Student live API E2E (4 suites) | pnpm --filter @codestrike/student-app test:e2e | 49 / 49 passed, 0 failed, 0 skipped (T3 + T4 + T5 + T7) |
| Admin web live API E2E | pnpm --filter @codestrike/admin-web test:e2e | 2 / 2 passed, 0 failed, 0 skipped (T6) |
| Live Browser CDP E2E (T3, T4, T5+T6, T7) | verify-t3, verify-t4, verify-t5-t6, verify-t7 | PASS (77 assertions + 28 verified screens) |
| Production builds + MP-Weixin audit | pnpm build + verify-t9-weixin-build.mjs | PASS (21 / 21 pages; 408.2 KiB / 2048 KiB) |
| Mock H5 & HTML prototype regressions | Wave 4, Design D1, Design D2, HTML Wave 4 | PASS (764 / 764 assertions across 320–680 px) |
Defect Status: 0 open P0 defects and 0 open P1 defects. Full logs, concurrency test details, and manual regression checklists are archived in docs/evidence/assignment5-alpha/t8-testing-qa/ and documented in the Testing Essay.
Honest Verification Boundaries:
- WeChat Developer Tools is not installed on the local test host, so
mp-weixinruntime rendering and the 6 explicitPATCHcall sites flagged byverify-t9-weixin-compatibility.mjsremain to be tested manually in WeChat Developer Tools. - Email verification and password recovery rely on an external SMTP server; backend logic is verified via injected
TestMailerintest_auth_codes.py, not against a live mail server.
8. Problems Encountered and Solutions
8.1 Preserving Raw Adapter Time Format While Formatting Mobile UI Display
Problem: Backend PlannerItemDto returns HH:MM:SS ("08:00:00"), which existing unit tests (api-adapters.test.mjs) assert verbatim on toPlannerOccurrence, while mobile UI cards should display compact HH:MM labels.
Solution: Preserved raw HH:MM:SS values inside toPlannerOccurrence and introduced dedicated display formatters (formatPlannerTime, formatPlannerDeadline) in apps/student-app/src/api/planner.ts, keeping adapter contracts backward-compatible and mobile screens clean.
8.2 Strict Backend Planner Field Validation Across Item Kinds
Problem: Backend TimedPlanCreate forbids description, and ItemPatch strictly restricts mutable fields per kind (Course / TimedPlan / Todo) while rejecting empty {} patches.
Solution: Built kind-aware payload builders in apps/student-app/src/api/planner.ts so each create and patch request sends only fields permitted for that exact item kind, verified by both unit tests (notifications-planner.test.mjs) and live MySQL E2E tests.
8.3 Multiple Notifications Generated by Captain Admission
Problem: During live T7 browser verification, approving a student's team application emitted both ApplicationApproved and MemberJoined notifications (resulting in 3 unread notifications when combined with ModerationApprove), whereas the initial test assertion expected only 2.
Solution: Verified both events are intentional recipient notifications in teams/service.py, added readable labels and routing for MemberJoined in apps/student-app/src/api/notifications.ts, and updated verify-t7-h5-browser.mjs to assert the real 3 unread count.
8.4 Soft-Delete Semantics on Withdrawn Competition Submissions
Problem: During T8 live E2E expansion (community-e2e.test.mjs), withdrawing a student competition submission via DELETE /competition-submissions/{id} kept the record in /competition-submissions/me with deleted: true rather than removing it from history.
Solution: Confirmed against competitions/service.py and pages/community/submissions.vue that preserving withdrawn records as Withdrawn (deleted: true) while excluding them from the admin pending moderation queue is intentional audit behavior, and updated the E2E test to assert both deleted === true and absence from /moderation?status=Pending.
9. Final Wrap-up Plan
With T1–T8 formally merged into sprint/alpha and Issues #1–#8 closed (8 of 9 accepted), only final documentation wrap-up under T9 remains before the November 29, 23:59 deadline:
- Publish the standalone Testing Essay (
docs/evidence/assignment5-alpha/t8-testing-qa/CodeStrike_Alpha_Sprint_Testing_Essay.md). - Publish the Alpha Sprint Summary Essay and Topical Collection Essay (indexing all 7 preceding CSDN posts).
- Close GitHub Issue
#9and record the final9 of 9 acceptedsprint completion before November 29, 23:59.
10. Sprint Reflection
Stage 4 brought the entire CodeStrike Alpha Sprint together: T7 completed the final student-facing workflows (Notifications and Personal Planner), and T8 proved that all seven integrated domains work reliably together under real MySQL 8.4 concurrency, load, and end-to-end browser verification without regressing Mock mode or Assignment 4 prototypes.
Running real concurrent database tests—not just single-request happy paths—gave the team concrete confidence in row-level locking, deadlock-free moderation ordering, and privacy boundaries. Keeping all evidence reproducible in raw logs and being transparent about platform boundaries (such as WeChat DevTools runtime and PATCH verification) ensures the project enters the Beta phase on a solid engineering foundation.
Related Links
相关推荐
基于条件风险价值CVaR的微网动态定价与调度策略(Matlab代码实现)
基于条件风险价值CVaR的微网动态定价与调度策略(Matlab代码实现)内容概要:本文提出了一种基于条件风险价值(CVaR)的微网动态定价与调度策略,并通过Matlab代码实现相关算法。研究聚焦于在不确定环境下,如可再生能源出力波动和负荷需求变化的情况下,如何利用CVaR方法量化和控制风险,从而优化微网的经济运行与能源调度。文中建立了包含分布式电源、储能系统及可控负荷在内的微网模型,设计了考虑风险偏好的动态定价机制与优化调度方案,旨在平衡系统运行成本与风险水平。通过仿真验证了该策略在降低期望成本的同时有效控制极端损失的能力。; 适合人群:具备电力系统、优化理论及Matlab编程基础的研究生、科研人员及相关领域工程师。; 使用场景及目标:①应用于含高比例可再生能源的微网能量管理系统中,提升其应对不确定性的能力;②为电力市场环境下的风险量化与决策提供技术支持;③作为教学案例用于讲授风险敏感优化在能源系统中的应用。; 阅读建议:建议读者结合Matlab代码深入理解模型构建与求解过程,重点关注CVaR的建模方式及其在目标函数中的集成方法,同时可尝试调整风险偏好参数以观察对调度结果的影响。
code_20261127.txt
code_20261127.txt
西周BC778年世界历史地图矢量文件SHP格式.zip
本资源为《西周BC778年世界历史地图矢量文件SHP格式》压缩包,文件大小约 24.87 MB,便于集中下载、整理和使用。具体内容请结合压缩包内的实际文件与说明查看。 在当前可读取的目录中,可见属性表(.dbf)、投影说明文件(.prj)、Shapefile 主文件(.shp)、Shapefile 索引(.shx)。建议解压后保持原有目录结构,先浏览文件清单与说明,再选择需要的资料进行加载或整理。 应用方面,可根据实际资料用于学习练习、资料检索、研究整理或项目参考。使用时可先确定所需内容,建立清晰的文件分类,再按项目要求进行筛选、转换与汇总。 使用 Shapefile 数据时,请把实际配套的 .shp、.shx、.dbf 等文件保存在同一目录,并保持同名关联;加载后再检查坐标系与中文字段显示。如需叠加其它数据,请先统一坐标与字段口径。 数据来源、时间范围、坐标系、字段定义、精度和使用条件,请以实际文件及原始说明为准。本介绍不对文件名之外尚未核实的信息作额外承诺。
复现多水面航行器AUV协同路径跟踪、多智能体系统、事件触发通信Matlab仿真
内容概要:本文围绕多水面航行器AUV的协同路径跟踪问题,基于多智能体系统理论,采用事件触发通信机制,利用Matlab进行仿真复现。研究重点在于设计高效的协同控制算法,以实现多个AUV在复杂海洋环境下的精确路径跟踪与协同作业,同时通过事件触发机制降低通信频率,节约能源并提升系统效率。仿真内容涵盖了系统建模、控制策略设计、通信机制优化及多AUV协同行为的动态响应分析,验证了所提方法的有效性与鲁棒性。; 适合人群:具备自动化、控制工程、海洋工程或相关领域背景,熟悉Matlab/Simulink仿真工具,从事多智能体系统、无人系统协同控制研究的研发人员或研究生。; 使用场景及目标:① 掌握多AUV协同路径跟踪的控制算法设计方法;② 学习事件触发通信机制在多智能体系统中的应用;③ 通过Matlab仿真复现顶刊研究成果,提升科研实践能力。; 阅读建议:建议结合多智能体系统控制理论与Matlab编程实践,重点关注仿真模型的构建逻辑与控制参数的整定过程,动手复现代码以深入理解算法细节与系统动态特性。
【工业无线通信】5GHz WiFi6大功率AP基站:支持2400M速率与AI极速漫游的工业级无线传输设备
内容概要:WiFiSupply WFS7000XBAX 是一款工业级大功率机载无线AP基站,支持5GHz全频段(5180-5825MHz)和Wi-Fi 6(802.11ax)标准,提供高达2400Mbps的无线速率和28dBm(640mW)发射功率。产品具备≤1ms通信延迟、≤30ms AI FastRoaming极速漫游、IP54防护等级及-45~85℃宽温工作能力,支持OFDMA、TDMA、长距离优化协议(LD),适用于远距离桥接(最远可达150km)和移动场景下的稳定通信。设备采用MIMO 2T2R架构,配备SMA外置天线接口,支持多种供电方式(PoE/DC/端子),并集成多重看门狗、防浪涌、防静电等工业级设计,保障高可靠性运行。软件方面支持私有安全协议、巨量安全隧道、VLAN、QoS、IPv6、SNMP、API管理及WISE云平台远程运维。; 适合人群:工业自动化、智慧物流、智慧交通等领域中从事无线网络规划、设备集成与系统部署的技术工程师及项目决策人员。; 使用场景及目标:①用于AMR/AGV/RGV、四向穿梭车、堆垛机、无人叉车等移动设备的无线联网与PLC数据传输;②实现车载、船载、火车视频监控的移动回传;③构建室内外无线桥接骨干链路,支持风电监测、无人机遥控、分拣机控制等工业4.0应用;④在复杂电磁环境下提供抗干扰、低延时、高带宽的稳定网络覆盖。; 阅读建议:本规格书适用于产品选型、方案设计与现场部署参考,建议结合实际应用场景重点关注其抗干扰能力、漫游性能、安全机制与供电灵活性,并查阅官方认证报告以验证各项工业指标的真实性。