Group 5 - CodeStrike Alpha Sprint Summary Essay (November 21 - 28, 2026)
CodeStrike Alpha Sprint Summary Essay — Full-Stack Delivery, Engineering Retrospective & Beta Roadmap (T1–T9)
Basic Information
| Item | Information |
|---|---|
| Course | EE308FZ Software Engineering |
| Assignment | Assignment 5 — Alpha Sprint (Sprint Summary Essay) |
| Team | CodeStrike (Group 5) |
| Project | Campus Competition & Activity Community (竞伴校园) |
| Sprint Period | November 21–28, 2026 |
| GitHub Repository | CodeStrike Repository |
| Integration Branch | sprint/alpha (latest merge commit 6775f25) |
| Task Completion | 8 of 9 formally closed on GitHub (T1–T8); T9 WeChat build verified and closing upon final blog publication before Nov 29 23:59 |
| Open P0 / P1 Defects | 0 P0, 0 P1 |
Table of Contents
- Executive Summary and Sprint Goal Review
- Complete Task Delivery and GitHub Traceability (T1–T9)
- Delivered System Architecture and Core Capabilities
- Sprint Progress and Burn-up Analysis
- Quality Assurance, MySQL 8.4 Verification, and Defect Status
- Key Technical Challenges and Engineering Lessons Learned
- Honest Verification Boundaries and Known Limitations
- Beta Sprint Roadmap and Next-Stage Priorities
- Conclusion
1. Executive Summary and Sprint Goal Review
The CodeStrike Alpha Sprint (November 21–28, 2026) transformed the project from two separate pre-sprint artifacts—a mock-only Assignment 4 frontend prototype (feature/assignment4-prototype) and a standalone FastAPI/MySQL backend (feature/backend-implementation)—into a fully integrated, database-backed, two-sided campus competition platform running on sprint/alpha.
Comparing our delivered outcomes against the two overarching goals established in our Alpha Sprint Plan:
| Sprint Goal | Planned Outcome | Actual Alpha Outcome | Status |
|---|---|---|---|
| Goal 1 — Unify Codebase & Full-Stack Integration | Merge frontend prototype & FastAPI/MySQL backend onto sprint/alpha; integrate Auth/Profile, Competitions/Teams, Community, Admin Web, Notifications/Planner; verify MySQL 8.4 concurrency & mp-weixin build | All 8 engineering & QA tasks (T1–T8) implemented on isolated branches, verified against real MySQL 8.4.7, merged into sprint/alpha via PRs #10–#18, with 240/240 automated tests passing, 0 open P0/P1 defects, and mp-weixin compiling cleanly (21/21 pages, 408.2 KiB / 2048 KiB) | Achieved |
| Goal 2 — Verifiable Deliverables & Documentation | Publish all 8 required Alpha Sprint blogs (Plan, 4 Sprint Essays, Testing Essay, Summary Essay, Topical Collection) with reproducible logs, commit/PR links, burn-up charts, and live screenshots before Nov 29 23:59 | Plan, Essays 1–4, Testing Essay, and Summary Essay completed with verbatim evidence archived under docs/evidence/assignment5-alpha/; Topical Collection Essay follows immediately to close T9 | On Track (Closing T9) |
2. Complete Task Delivery and GitHub Traceability (T1–T9)
Every engineering task followed the sprint's strict branching (feat/<issue>-<slug>), commit-message (<type>(<scope>): <subject> (#<issue>)), and Pull Request workflow without modifying main or breaking Assignment 4 prototype files:
| Task | Priority | Module | Branch | PR / Merge (sprint/alpha) | Closed Date (Beijing) | Status |
|---|---|---|---|---|---|---|
| T1 | P0 | Baseline Merge | sprint/alpha | Commit 15e3b94 / Issue #1 | Nov 22, 12:33 | Closed |
| T2 | P0 | Shared Types & HTTP Client | feat/2-shared-http | PR #10 (f36660f) / Issue #2 | Nov 22, 12:32 | Closed |
| T3 | P0 | Auth & Profile Integration | feat/3-auth-profile | PR #11 (15059fe) / Issue #3 | Nov 22, 14:08 | Closed |
| T4 | P0 | Competitions & Teams Integration | feat/4-competitions-teams | PR #12 (e05d333) / Issue #4 | Nov 24, 09:23 | Closed |
| T5 | P1 | Community Posts & Interactions | feat/5-community | PR #15 (c3d62a7) / Issue #5 | Nov 24, 20:33 | Closed |
| T6 | P1 | Admin Web Integration | feat/6-admin-web | PR #16 (91ae6a3) / Issue #6 | Nov 24, 20:33 | Closed |
| T7 | P1 | Notifications & Planner Integration | feat/7-notifications-planner | PR #17 (220dbdb) / Issue #7 | Nov 28, 12:06 | Closed |
| T8 | P0 | Testing & QA Automation | feat/8-testing-qa | PR #18 (6775f25) / Issue #8 | Nov 28, 12:07 | Closed |
| T9 | P1 | MP-Weixin Build Check & Docs | feat/9-weixin-readiness | PR #13 (ec37402) / Issue #9 | Closing with final blog | Build Verified; Docs Closing |
3. Delivered System Architecture and Core Capabilities
CodeStrike is structured as a pnpm monorepo (packages/api-contracts, apps/student-app, apps/admin-web) paired with a modular monolith FastAPI/SQLAlchemy 2/MySQL 8.4 backend (apps/server, 25 Alembic-managed InnoDB tables, 59 API paths / 79 operations / 48 OpenAPI schemas):
- Shared Contracts & Dual-Mode Transport (
packages/api-contracts, T2): Both clients share strongly typed DTOs (19 verified directly against live OpenAPI 3.1.0), explicit view-model adapters, structuredApiErrorhandling, Bearer token lifecycle management, and compile-timeVITE_USE_MOCKswitching so Mock mode and Assignment 4 prototype flows remain 100% functional alongside live API mode. - Student Authentication, Profiles & Skill Catalog (
apps/student-app, T3): Salted PBKDF2-HMAC-SHA256 (600,000 iterations) password hashing, SHA-256 token digests,/auth/mereload persistence, server-side logout revocation, 8-field profile completeness gate, and administrator-governed skill tags (403on student catalog writes). - Competitions, Team Recruitment & Captain Admission (T4): Server-side competition search, unpublished-record isolation, moderated team recruitment publication, duplicate-pending prevention (
409 DUPLICATE_PENDING), sanitized 5-field captain review previews, captain-only active-member WeChat contact protection, and InnoDB row-locked last-slot capacity enforcement (409 TEAM_FULL). - Moderated Community & Student Competition Submissions (T5): Revision-based posts and nested comments (
Pendingprivate to author until approved; live approved version preserved while edits await review), validated PNG/JPEG uploads (up to 9 images, 5 MiB limit) served behind authenticated privacy gates (GET /images/{id}), persistent per-user Like/Favorite toggles (GET /posts/{id}/interactions), and student competition submission create/revise/withdraw workflows. - Administrator Web Console (
apps/admin-web, T6): Role-guarded admin authentication (student tokens immediately revoked via/auth/logout), live/dashboardactionable counters, full competition catalog CRUD (/admin/competitions), and a unified URL-syncedModerationViewcovering Content, Competition submissions, and Recruitments acrossPending/Approved/Rejected/Supersededstates with side-by-side Proposed vs. Effective diffs and authenticated binary image previews. - Recipient Notifications (UI-20) & Personal Planner (UI-16 to UI-19) (T7): Live recipient inbox classifying admission, team, and moderation events with persisted read state and
404privacy isolation; private Day/Week personal planner accessible even with an incomplete profile (FR-02), supporting overlapping Timed Plans, repeating To-dos, server-timetable finite Courses with duplicate skipping, and single-occurrence edit/toggle/delete isolation.
Representative Live Alpha Screenshots

Figure 1. Student Mobile H5 (390 px) — Captain Application Review Queue with Sanitized Preview and Skill Match (T4)

Figure 2. Administrator Web Console — Side-by-Side Proposed vs. Effective Revision Comparison (T6)

Figure 3. Student Mobile H5 (390 px) — Recipient Notification Inbox (UI-20) Displaying Real Admission & Moderation Events (T7)
4. Sprint Progress and Burn-up Analysis

Figure 4. CodeStrike Alpha Sprint Burn-up Chart — Through November 28, 2026 (8 of 9 Accepted)
| Date | Total Scope | Accepted Tasks (GitHub Closed) | Milestone Completed |
|---|---|---|---|
| November 21 | 9 | 0 | Sprint plan & code standards published (#620614150) |
| November 22 | 9 | 3 | T1 Baseline Merge, T2 Shared HTTP (PR #10), T3 Auth & Profile (PR #11) |
| November 23 | 9 | 3 | T4 implementation & local MySQL verification |
| November 24 | 9 | 6 | T4 (PR #12), T5 Community (PR #15), T6 Admin Web (PR #16), T9 readiness (PR #13) |
| November 25–27 | 9 | 6 | T7 implementation & 390 px verification; T8 concurrency/E2E expansion & 17-suite QA run |
| November 28 | 9 | 8 | T7 (PR #17, Issue #7) & T8 (PR #18, Issue #8) merged and closed (88.9%) |
| November 29 (Target) | 9 | 9 | Final blogs published & Issue #9 closed (100%) |
Our burn-up curve reflects disciplined delivery pacing: the team front-loaded foundational P0 infrastructure (T1–T3) in Days 1–2, completed the core competition/team/community/admin workflows (T4–T6) by Day 4, and reserved the second half of the sprint for T7 integration, comprehensive MySQL 8.4 concurrency & load verification (T8), and documentation wrap-up (T9) without scope creep or last-minute emergency merges.
5. Quality Assurance, MySQL 8.4 Verification, and Defect Status

Figure 5. Final Alpha QA Verification Summary (240 / 240 Automated Tests Passed) and MySQL 8.4.7 20-User Load Latency
Full QA verification on sprint/alpha (6775f25) achieved 100% pass rate with 0 failures and 0 skips across every automated layer:
- 240 / 240 Automated Test Cases Passed: 75 backend tests on real MySQL 8.4.7 (
READ-COMMITTED), 92 student unit/mock tests, 22 admin unit tests, 49 student live API E2E tests (T3/T4/T5/T7), and 2 admin live API E2E tests (T6). - 871 / 871 Automated Assertions + 28 Live Browser Screens Passed: 19/19 OpenAPI DTO contracts, 11/11
mp-weixinpackage checks, 77 live T3/T4 H5 assertions, 28 live T5/T6/T7 screens, and 764 Mock/HTML prototype responsive assertions across 320–680 px. - 13 Real MySQL 8.4 Concurrency & Constraint Tests Passed: Verified last-slot team admission races, two-team same-applicant races, concurrent moderation
Approvevs.Reject, author edit vs. admin approval, deadlock-free parent-post removal vs. child-comment approval, concurrentLike/Favoriteidempotency, course deduplication & edit-collision rollback, notification privacy, andInnoDB/utf8mb4/CHECKconstraints. - 20-User Mixed Workload Benchmark (
test_load.py): 80 simultaneous operations (read,save,apply,moderate), 0 failed, P95 = 0.7473 s, Max = 0.7824 s (well below the 3.00 s target). - Zero Open Release Blockers: All 2 P0 defects (
DEF-01Viteimport.meta.envaliasing,DEF-06Admin Web build/view gaps) and 4 P1 defects (DEF-02login 401 session eviction,DEF-03team history/match projections,DEF-04interaction reload state endpoint,DEF-05stale moderation counts) were fixed and locked down with automated regression tests (0 open P0, 0 open P1).
6. Key Technical Challenges and Engineering Lessons Learned
- Contract-First Integration Prevented Silent Drift: Auditing frontend prototype view models against the live OpenAPI 3.1.0 schema before wiring each module (expanding
verify-t2-openapi-contracts.mjsfrom 12 → 15 → 19 DTOs) caught mismatched field names, strictItemPatchrules, and missing endpoints (GET /posts/{id}/interactions) early rather than in manual UI testing. - Database-Level Concurrency Must Be Proven on the Target Engine: Running tests only on SQLite initially masked 7 MySQL-specific tests in T1. Provisioning an isolated portable MySQL 8.4 instance (
READ-COMMITTED) allowed us to test real InnoDB row locks, generated nullable unique columns, and parent-first lock ordering across 13 dedicated concurrency tests. - Strict Branch Hygiene Scales Cleanly Across Parallel Modules: Separating joint work into clean per-issue branches (
feat/5-communityvs.feat/6-admin-web,feat/7-notifications-plannervs.feat/8-testing-qa) and rebasing sequentially ontosprint/alphakept every PR diff minimal, reviewable, and traceable to its exact GitHub Issue. - Honest Evidence Discipline Builds Trust: Recording verbatim logs, never reporting SQLite passes as MySQL proof, and explicitly listing unverified environment boundaries eliminated guesswork when planning Beta Sprint work.
7. Honest Verification Boundaries and Known Limitations
Entering Beta, the team explicitly tracks four known verification and deployment boundaries:
- WeChat Mini Program DevTools & Physical Device Runtime:
mp-weixinbuilds cleanly (21/21pages,408.2 KiB / 2048 KiB,wxa551256ce5fab6a7,urlCheck=true), but WeChat Developer Tools was not installed on the local QA host. Visual rendering in the mini program runtime and the 6 explicitPATCHcall sites flagged byverify-t9-weixin-compatibility.mjsrequire manual validation in WeChat Developer Tools (and migration toPUT/POSTif any target WeChat base library rejectsPATCH). - External SMTP Email Service: Email verification and password recovery are tested end-to-end against MySQL with an injected
TestMailer(including fail-closed503 EMAIL_UNAVAILABLE), but have not yet been connected to a production SMTP relay. - Production Deployment & Media Storage: Uploaded post images are currently stored as validated
MEDIUMBLOBrows in MySQL; moving image bytes to cloud object storage (COS/OSS) with HTTPS domain registration (request/uploadFile/downloadFile) and TLS reverse proxy deployment is planned for Beta. - Automated CI Pipeline: All 17 verification suites currently run via local reproducible scripts; GitHub Actions CI workflows are not yet configured in the repository.
8. Beta Sprint Roadmap and Next-Stage Priorities
| Priority | Beta Sprint Work Item | Objective |
|---|---|---|
| P0 | Cloud Deployment & HTTPS Domain Filing | Deploy FastAPI + MySQL 8.4 behind TLS, disable ENABLE_DOCS in production, configure ICP-filed HTTPS legal domains in WeChat console |
| P0 | WeChat Developer Tools & Real-Device QA | Run end-to-end manual QA in WeChat Developer Tools and iOS/Android WeChat clients; resolve any PATCH or layout issues found on real devices |
| P1 | Object Storage Migration for Post Media | Move content_images binary payloads to cloud object storage and switch mini program uploads to wx.uploadFile while preserving private-image authorization |
| P1 | Live SMTP Integration & GitHub Actions CI | Connect a real SMTP provider for email binding/recovery and automate pnpm type-check, pnpm test, and MySQL 8.4 pytest in GitHub Actions |
| P2 | Usability Polish & User Acceptance Testing | Conduct real student usability testing, optimize admin bundle code-splitting, and refine mobile empty/loading micro-interactions |
9. Conclusion
The CodeStrike Alpha Sprint delivered a complete, verifiable, end-to-end campus competition and team collaboration platform across student mobile H5, administrator web console, shared TypeScript contracts, and FastAPI/MySQL 8.4 backend. With T1–T8 formally merged and closed, 240/240 automated tests passing, 0 open P0/P1 defects, and a clean 408.2 KiB mp-weixin build, the project transitions into the Beta Sprint with strong engineering reliability and a clear deployment roadmap.
Related Links
- CodeStrike GitHub Repository
- Alpha Sprint Task Plan (CSDN)
- Alpha Sprint Essay 1 — Day 1–2 (CSDN)
- Alpha Sprint Essay 2 — Day 3–4 (CSDN)
- Alpha Sprint Essay 3 — Day 5–6 (CSDN)
- Alpha Sprint Essay 4 — Day 7–8 (CSDN)
- Alpha Sprint Testing Essay — T8 (CSDN)
- Alpha Sprint GitHub Issues (T1–T9)
- Alpha Sprint Evidence Index
相关推荐
基于条件风险价值CVaR的微网动态定价与调度策略(Matlab代码实现)
基于条件风险价值CVaR的微网动态定价与调度策略(Matlab代码实现)内容概要:本文提出了一种基于条件风险价值(CVaR)的微网动态定价与调度策略,并通过Matlab代码实现相关算法。研究聚焦于在不确定环境下,如可再生能源出力波动和负荷需求变化的情况下,如何利用CVaR方法量化和控制风险,从而优化微网的经济运行与能源调度。文中建立了包含分布式电源、储能系统及可控负荷在内的微网模型,设计了考虑风险偏好的动态定价机制与优化调度方案,旨在平衡系统运行成本与风险水平。通过仿真验证了该策略在降低期望成本的同时有效控制极端损失的能力。; 适合人群:具备电力系统、优化理论及Matlab编程基础的研究生、科研人员及相关领域工程师。; 使用场景及目标:①应用于含高比例可再生能源的微网能量管理系统中,提升其应对不确定性的能力;②为电力市场环境下的风险量化与决策提供技术支持;③作为教学案例用于讲授风险敏感优化在能源系统中的应用。; 阅读建议:建议读者结合Matlab代码深入理解模型构建与求解过程,重点关注CVaR的建模方式及其在目标函数中的集成方法,同时可尝试调整风险偏好参数以观察对调度结果的影响。
code_20261127.txt
code_20261127.txt
西周BC778年世界历史地图矢量文件SHP格式.zip
本资源为《西周BC778年世界历史地图矢量文件SHP格式》压缩包,文件大小约 24.87 MB,便于集中下载、整理和使用。具体内容请结合压缩包内的实际文件与说明查看。 在当前可读取的目录中,可见属性表(.dbf)、投影说明文件(.prj)、Shapefile 主文件(.shp)、Shapefile 索引(.shx)。建议解压后保持原有目录结构,先浏览文件清单与说明,再选择需要的资料进行加载或整理。 应用方面,可根据实际资料用于学习练习、资料检索、研究整理或项目参考。使用时可先确定所需内容,建立清晰的文件分类,再按项目要求进行筛选、转换与汇总。 使用 Shapefile 数据时,请把实际配套的 .shp、.shx、.dbf 等文件保存在同一目录,并保持同名关联;加载后再检查坐标系与中文字段显示。如需叠加其它数据,请先统一坐标与字段口径。 数据来源、时间范围、坐标系、字段定义、精度和使用条件,请以实际文件及原始说明为准。本介绍不对文件名之外尚未核实的信息作额外承诺。
复现多水面航行器AUV协同路径跟踪、多智能体系统、事件触发通信Matlab仿真
内容概要:本文围绕多水面航行器AUV的协同路径跟踪问题,基于多智能体系统理论,采用事件触发通信机制,利用Matlab进行仿真复现。研究重点在于设计高效的协同控制算法,以实现多个AUV在复杂海洋环境下的精确路径跟踪与协同作业,同时通过事件触发机制降低通信频率,节约能源并提升系统效率。仿真内容涵盖了系统建模、控制策略设计、通信机制优化及多AUV协同行为的动态响应分析,验证了所提方法的有效性与鲁棒性。; 适合人群:具备自动化、控制工程、海洋工程或相关领域背景,熟悉Matlab/Simulink仿真工具,从事多智能体系统、无人系统协同控制研究的研发人员或研究生。; 使用场景及目标:① 掌握多AUV协同路径跟踪的控制算法设计方法;② 学习事件触发通信机制在多智能体系统中的应用;③ 通过Matlab仿真复现顶刊研究成果,提升科研实践能力。; 阅读建议:建议结合多智能体系统控制理论与Matlab编程实践,重点关注仿真模型的构建逻辑与控制参数的整定过程,动手复现代码以深入理解算法细节与系统动态特性。
【工业无线通信】5GHz WiFi6大功率AP基站:支持2400M速率与AI极速漫游的工业级无线传输设备
内容概要:WiFiSupply WFS7000XBAX 是一款工业级大功率机载无线AP基站,支持5GHz全频段(5180-5825MHz)和Wi-Fi 6(802.11ax)标准,提供高达2400Mbps的无线速率和28dBm(640mW)发射功率。产品具备≤1ms通信延迟、≤30ms AI FastRoaming极速漫游、IP54防护等级及-45~85℃宽温工作能力,支持OFDMA、TDMA、长距离优化协议(LD),适用于远距离桥接(最远可达150km)和移动场景下的稳定通信。设备采用MIMO 2T2R架构,配备SMA外置天线接口,支持多种供电方式(PoE/DC/端子),并集成多重看门狗、防浪涌、防静电等工业级设计,保障高可靠性运行。软件方面支持私有安全协议、巨量安全隧道、VLAN、QoS、IPv6、SNMP、API管理及WISE云平台远程运维。; 适合人群:工业自动化、智慧物流、智慧交通等领域中从事无线网络规划、设备集成与系统部署的技术工程师及项目决策人员。; 使用场景及目标:①用于AMR/AGV/RGV、四向穿梭车、堆垛机、无人叉车等移动设备的无线联网与PLC数据传输;②实现车载、船载、火车视频监控的移动回传;③构建室内外无线桥接骨干链路,支持风电监测、无人机遥控、分拣机控制等工业4.0应用;④在复杂电磁环境下提供抗干扰、低延时、高带宽的稳定网络覆盖。; 阅读建议:本规格书适用于产品选型、方案设计与现场部署参考,建议结合实际应用场景重点关注其抗干扰能力、漫游性能、安全机制与供电灵活性,并查阅官方认证报告以验证各项工业指标的真实性。